BRPI1006616B8 - método de controle de poço - Google Patents
método de controle de poço Download PDFInfo
- Publication number
- BRPI1006616B8 BRPI1006616B8 BRPI1006616A BRPI1006616A BRPI1006616B8 BR PI1006616 B8 BRPI1006616 B8 BR PI1006616B8 BR PI1006616 A BRPI1006616 A BR PI1006616A BR PI1006616 A BRPI1006616 A BR PI1006616A BR PI1006616 B8 BRPI1006616 B8 BR PI1006616B8
- Authority
- BR
- Brazil
- Prior art keywords
- wellbore
- pressure
- control method
- inflow
- undesirable
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/005—Below-ground automatic control systems
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Control Of Fluid Pressure (AREA)
- Fluid-Pressure Circuits (AREA)
- Hardware Redundancy (AREA)
- Feedback Control In General (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Steering Control In Accordance With Driving Conditions (AREA)
- Steering-Linkage Mechanisms And Four-Wheel Steering (AREA)
Abstract
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/US2010/020122 WO2011084153A1 (en) | 2010-01-05 | 2010-01-05 | Well control systems and methods |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| BRPI1006616A2 BRPI1006616A2 (pt) | 2016-04-19 |
| BRPI1006616B1 BRPI1006616B1 (pt) | 2019-08-20 |
| BRPI1006616B8 true BRPI1006616B8 (pt) | 2022-01-25 |
Family
ID=42751529
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI1006616A BRPI1006616B8 (pt) | 2010-01-05 | 2010-01-05 | método de controle de poço |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US9279298B2 (pt) |
| AU (1) | AU2010340366B2 (pt) |
| BR (1) | BRPI1006616B8 (pt) |
| GB (1) | GB2480940B (pt) |
| NO (1) | NO346117B1 (pt) |
| WO (1) | WO2011084153A1 (pt) |
Families Citing this family (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9567843B2 (en) | 2009-07-30 | 2017-02-14 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
| DK2542753T3 (en) * | 2010-03-05 | 2016-12-05 | Safekick Americas Llc | System and method for safe well control operation |
| RU2553751C2 (ru) | 2011-04-08 | 2015-06-20 | Халлибертон Энерджи Сервисез, Инк. | Автоматическое управление давлением в напорной линии при бурении |
| US9249638B2 (en) | 2011-04-08 | 2016-02-02 | Halliburton Energy Services, Inc. | Wellbore pressure control with optimized pressure drilling |
| US8783381B2 (en) | 2011-07-12 | 2014-07-22 | Halliburton Energy Services, Inc. | Formation testing in managed pressure drilling |
| US9181754B2 (en) | 2011-08-02 | 2015-11-10 | Haliburton Energy Services, Inc. | Pulsed-electric drilling systems and methods with formation evaluation and/or bit position tracking |
| US9027669B2 (en) | 2011-08-02 | 2015-05-12 | Halliburton Energy Services, Inc. | Cooled-fluid systems and methods for pulsed-electric drilling |
| US9217287B2 (en) | 2011-08-02 | 2015-12-22 | Halliburton Energy Services, Inc. | Systems and methods for drilling boreholes with noncircular or variable cross-sections |
| BR112014009982B1 (pt) * | 2011-10-25 | 2021-10-26 | Halliburton Energy Services, Inc | Sistema integrado para intensificar o desempenho de operações subterrâneas, e, método para intensificar o desempenho de operações subterrâneas |
| CA2877702A1 (en) * | 2012-07-02 | 2014-01-09 | Halliburton Energy Services, Inc. | Pressure control in drilling operations with offset applied in response to predetermined conditions |
| US9957774B2 (en) | 2013-12-16 | 2018-05-01 | Halliburton Energy Services, Inc. | Pressure staging for wellhead stack assembly |
| WO2016062314A1 (en) * | 2014-10-24 | 2016-04-28 | Maersk Drilling A/S | Apparatus and methods for control of systems for drilling with closed loop mud circulation |
| US10060208B2 (en) * | 2015-02-23 | 2018-08-28 | Weatherford Technology Holdings, Llc | Automatic event detection and control while drilling in closed loop systems |
| WO2016140650A1 (en) * | 2015-03-03 | 2016-09-09 | Halliburton Energy Services, Inc. | Managed pressure drilling with hydraulic modeling that incorporates an inverse model |
| US10718172B2 (en) | 2015-06-25 | 2020-07-21 | Schlumberger Technology Corporation | Fluid loss and gain for flow, managed pressure and underbalanced drilling |
| US20170218754A1 (en) * | 2016-01-30 | 2017-08-03 | Certified Pressure Testing Llc | Instrumentation system and method |
| NO342214B1 (en) * | 2016-03-18 | 2018-04-16 | Qwave As | Device and method for perforation of a downhole formation |
| US10961794B2 (en) | 2016-09-15 | 2021-03-30 | ADS Services LLC | Control system for a well drilling platform with remote access |
| EP3513030B1 (en) * | 2016-09-15 | 2020-11-04 | Expro Americas, LLC | Integrated control system for a well drilling platform |
| BR112019012086A2 (pt) * | 2016-12-13 | 2019-11-12 | Schlumberger Technology Bv | estrangulador de disco alinhado para perfuração de pressão gerenciada |
| WO2018118550A1 (en) * | 2016-12-22 | 2018-06-28 | Schlumberger Technology Corporation | Pipe ram annular adjustable restriction for managed pressure drilling with changeable rams |
| WO2018118438A1 (en) * | 2016-12-22 | 2018-06-28 | Schlumberger Technology Corporation | Staged annular restriction for managed pressure drilling |
| CN110892130A (zh) * | 2017-03-31 | 2020-03-17 | 科技能源产品有限责任公司 | 受控压力钻井歧管、模块和方法 |
| AU2019202594B2 (en) * | 2019-03-08 | 2025-01-30 | ADS Services, LLC | Control system for a well drilling platform with remote access |
| BR112022013950A2 (pt) * | 2020-01-16 | 2022-10-11 | Opla Energy Ltd | Dispositivo de gerenciamento de pressão, métodos e conjunto de choke |
| MX2023011600A (es) | 2021-04-01 | 2023-10-10 | Opla Energy Ltd | Internet de las cosas en operaciones de perforacion a presion gestionada. |
| US11795771B2 (en) * | 2021-12-14 | 2023-10-24 | Halliburton Energy Services, Inc. | Real-time influx management envelope tool with a multi-phase model and machine learning |
| US11913328B1 (en) | 2022-12-07 | 2024-02-27 | Saudi Arabian Oil Company | Subsurface annular pressure management system—a method and apparatus for dynamically varying the annular well pressure |
| CN116220584B (zh) * | 2023-01-09 | 2024-05-31 | 新疆敦华绿碳技术股份有限公司 | 一种co2驱注采井压井系统及其优化方法 |
| US20250003330A1 (en) * | 2023-06-30 | 2025-01-02 | Weatherford Technology Holdings, Llc | Hydraulics model utilization in well operations |
Family Cites Families (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4355784A (en) | 1980-08-04 | 1982-10-26 | Warren Automatic Tool Company | Method and apparatus for controlling back pressure |
| US7174975B2 (en) | 1998-07-15 | 2007-02-13 | Baker Hughes Incorporated | Control systems and methods for active controlled bottomhole pressure systems |
| US6415877B1 (en) | 1998-07-15 | 2002-07-09 | Deep Vision Llc | Subsea wellbore drilling system for reducing bottom hole pressure |
| US6257354B1 (en) * | 1998-11-20 | 2001-07-10 | Baker Hughes Incorporated | Drilling fluid flow monitoring system |
| JP4369571B2 (ja) * | 1999-02-18 | 2009-11-25 | サンエー技研株式会社 | ラミネータ |
| US6173768B1 (en) | 1999-08-10 | 2001-01-16 | Halliburton Energy Services, Inc. | Method and apparatus for downhole oil/water separation during oil well pumping operations |
| US7096976B2 (en) | 1999-11-05 | 2006-08-29 | Halliburton Energy Services, Inc. | Drilling formation tester, apparatus and methods of testing and monitoring status of tester |
| US6367552B1 (en) * | 1999-11-30 | 2002-04-09 | Halliburton Energy Services, Inc. | Hydraulically metered travel joint |
| US6371204B1 (en) * | 2000-01-05 | 2002-04-16 | Union Oil Company Of California | Underground well kick detector |
| US6585044B2 (en) | 2000-09-20 | 2003-07-01 | Halliburton Energy Services, Inc. | Method, system and tool for reservoir evaluation and well testing during drilling operations |
| US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
| US6484816B1 (en) | 2001-01-26 | 2002-11-26 | Martin-Decker Totco, Inc. | Method and system for controlling well bore pressure |
| EP1397579B1 (en) | 2001-04-25 | 2009-03-11 | Halliburton Energy Services, Inc. | Method, system and tool for reservoir evaluation and well testing during drilling operations |
| GB2416559B (en) | 2001-09-20 | 2006-03-29 | Baker Hughes Inc | Active controlled bottomhole pressure system & method |
| US7027968B2 (en) * | 2002-01-18 | 2006-04-11 | Conocophillips Company | Method for simulating subsea mudlift drilling and well control operations |
| US6904981B2 (en) | 2002-02-20 | 2005-06-14 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
| US7185719B2 (en) | 2002-02-20 | 2007-03-06 | Shell Oil Company | Dynamic annular pressure control apparatus and method |
| US6755261B2 (en) * | 2002-03-07 | 2004-06-29 | Varco I/P, Inc. | Method and system for controlling well fluid circulation rate |
| US6892812B2 (en) | 2002-05-21 | 2005-05-17 | Noble Drilling Services Inc. | Automated method and system for determining the state of well operations and performing process evaluation |
| US6820702B2 (en) | 2002-08-27 | 2004-11-23 | Noble Drilling Services Inc. | Automated method and system for recognizing well control events |
| US6814142B2 (en) * | 2002-10-04 | 2004-11-09 | Halliburton Energy Services, Inc. | Well control using pressure while drilling measurements |
| US20050092523A1 (en) * | 2003-10-30 | 2005-05-05 | Power Chokes, L.P. | Well pressure control system |
| US7407019B2 (en) | 2005-03-16 | 2008-08-05 | Weatherford Canada Partnership | Method of dynamically controlling open hole pressure in a wellbore using wellhead pressure control |
| US7836973B2 (en) | 2005-10-20 | 2010-11-23 | Weatherford/Lamb, Inc. | Annulus pressure control drilling systems and methods |
| BRPI0706315B1 (pt) * | 2006-01-05 | 2018-02-06 | Prad Research And Development Limited | "método para determinar a existência de um evento de controle de poço" |
| US7610251B2 (en) | 2006-01-17 | 2009-10-27 | Halliburton Energy Services, Inc. | Well control systems and associated methods |
| CA2648024C (en) * | 2006-04-03 | 2012-11-13 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for sand and inflow control during well operations |
| GB2456438B (en) * | 2006-10-23 | 2011-01-12 | Mi Llc | Method and apparatus for controlling bottom hole pressure in a subterranean formation during rig pump operation |
| US20090159334A1 (en) | 2007-12-19 | 2009-06-25 | Bp Corporation North America, Inc. | Method for detecting formation pore pressure by detecting pumps-off gas downhole |
| AU2009222010B2 (en) * | 2008-03-03 | 2015-06-25 | Intelliserv International Holding, Ltd | Monitoring downhole conditions with drill string distributed measurement system |
| US8631877B2 (en) * | 2008-06-06 | 2014-01-21 | Schlumberger Technology Corporation | Apparatus and methods for inflow control |
| US8286704B2 (en) * | 2008-10-30 | 2012-10-16 | Schlumberger Technology Corporation | Coiled tubing conveyed combined inflow and outflow control devices |
-
2010
- 2010-01-05 AU AU2010340366A patent/AU2010340366B2/en not_active Ceased
- 2010-01-05 GB GB1114621.4A patent/GB2480940B/en active Active
- 2010-01-05 NO NO20111522A patent/NO346117B1/no unknown
- 2010-01-05 WO PCT/US2010/020122 patent/WO2011084153A1/en not_active Ceased
- 2010-01-05 BR BRPI1006616A patent/BRPI1006616B8/pt not_active IP Right Cessation
- 2010-01-05 US US13/392,900 patent/US9279298B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| GB201114621D0 (en) | 2011-10-05 |
| US20120165997A1 (en) | 2012-06-28 |
| WO2011084153A1 (en) | 2011-07-14 |
| US9279298B2 (en) | 2016-03-08 |
| NO346117B1 (no) | 2022-02-28 |
| BRPI1006616B1 (pt) | 2019-08-20 |
| AU2010340366A1 (en) | 2011-09-15 |
| NO20111522A1 (no) | 2011-11-03 |
| GB2480940A (en) | 2011-12-07 |
| GB2480940B (en) | 2015-10-07 |
| BRPI1006616A2 (pt) | 2016-04-19 |
| AU2010340366B2 (en) | 2014-10-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI1006616B8 (pt) | método de controle de poço | |
| CO6602124A2 (es) | Sistema y metodo para optimizar la velocidad de perforacion | |
| MX338446B (es) | Perforación con presión gestionada con la compensación de la elevación del equipo de perforación. | |
| GB2483591A (en) | Water injection systems and methods | |
| BR112014032573A2 (pt) | métodos de melhorar rede de fratura hidráulica | |
| BR112017012830A2 (pt) | composições e métodos de aprimoramento de rede de fratura hidráulica | |
| BRPI1011890A8 (pt) | métodos para operar um furo de poço, para produzir fluidos a partir de um furo de poço, para produzir fluidos a partir de um poço, para formar um poço em uma formação subterrânea, e para instalar equipamento de furo abaixo em um furo de poço | |
| WO2018035400A3 (en) | Method for determining characteristics of a network of hydraulic fractures | |
| MY154155A (en) | Method for determining formation integrity and optimum drilling parameters during drilling | |
| WO2012082488A3 (en) | Controlling flow of steam into and/or out of a wellbore | |
| MX2014006013A (es) | Uso de mediciones de presion en el interior del pozo durante la perforacion para detectar y mitigar afluencias. | |
| UA104382C2 (ru) | Способ интерпретации распределенных температурных датчиков во время обработки ствола скважины | |
| EA201390132A1 (ru) | Система и способ для определения характеристик коллектора | |
| WO2010135636A3 (en) | Apparatus and method for modeling well designs and well performance | |
| BRPI0811155A2 (pt) | método de tratamento de uma formação subterrânea penetrada por um furo de poço | |
| MX2019003496A (es) | Metodo de lavado automatizado para un sistema de bomba de cavidad progresiva. | |
| BR112012011251A2 (pt) | métodos para fazer manutenção de uma formação subterrânea, e de um furo de poço, ferramenta de manutenção de furo de poço, e, aparelho de manutenção de furo de poço | |
| EA201390210A1 (ru) | Многофункциональный изолирующий инструмент и способ его использования | |
| BRPI0916278A2 (pt) | métodos para produzir hidrocarbonetos a partir de uma região de subsuperfície e para determinar um modelo de terra de superfície | |
| MX2011009663A (es) | Fluido de tratamiento de pozo. | |
| NO20076611L (no) | Fremgangsmater og anordninger for analysering og styring av forplantningen av bolger i et borehull, generert med vannhammer | |
| SA119410067B1 (ar) | التنبؤ بتوزيع مادة في مرحلة معالجة بالتصديع الهيدروليكي | |
| BR112015014310A2 (pt) | método de determinação controlada por computador de parâmetros operacionais de um modelo computacional de equipamento de furo de sondagem; dispositivo para determinação controlada por computador de parâmetros operacionais de um modelo computacional de equipamento de furo de sondagem; controlador eletrônico para controlar velocidade de acionamento rotacional de um sistema de acionamento rotacional de equipamento de furo de sondagem; e equipamento de furo de sondagem | |
| EA201391547A1 (ru) | Определение целостности скважины | |
| MY185413A (en) | Elastic pipe control and compensation with managed pressure drilling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
| B06T | Formal requirements before examination [chapter 6.20 patent gazette] | ||
| B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
| B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 05/01/2010, OBSERVADAS AS CONDICOES LEGAIS. (CO) 20 (VINTE) ANOS CONTADOS A PARTIR DE 05/01/2010, OBSERVADAS AS CONDICOES LEGAIS |
|
| B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: PRAZO DE VALIDADE: 20 (VINTE) ANOS CONTADOS A PARTIR DE 05/01/2010, OBSERVADAS AS CONDICOES LEGAIS. (CO) REFERENTE A RPI 2537 DE 20/08/2019,QUANTO AO ITEM (43) DATA DA PUBLICACAO INTERNACIONAL. |
|
| B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: REF. RPI 2537 DE 20/08/2019 QUANTO AOS INVENTORES. |
|
| B21F | Lapse acc. art. 78, item iv - on non-payment of the annual fees in time |
Free format text: REFERENTE A 14A ANUIDADE. |
|
| B24J | Lapse because of non-payment of annual fees (definitively: art 78 iv lpi, resolution 113/2013 art. 12) |
Free format text: EM VIRTUDE DA EXTINCAO PUBLICADA NA RPI 2756 DE 31-10-2023 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDA A EXTINCAO DA PATENTE E SEUS CERTIFICADOS, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |