BRPI0919264A2 - forging processes of a thermomechanical part of beta or alpha / beta titanium alloy, fabrication of a thermomechanical part made of titanium alloy, thermomechanical part, and turbocharger - Google Patents
forging processes of a thermomechanical part of beta or alpha / beta titanium alloy, fabrication of a thermomechanical part made of titanium alloy, thermomechanical part, and turbochargerInfo
- Publication number
- BRPI0919264A2 BRPI0919264A2 BRPI0919264A BRPI0919264A BRPI0919264A2 BR PI0919264 A2 BRPI0919264 A2 BR PI0919264A2 BR PI0919264 A BRPI0919264 A BR PI0919264A BR PI0919264 A BRPI0919264 A BR PI0919264A BR PI0919264 A2 BRPI0919264 A2 BR PI0919264A2
- Authority
- BR
- Brazil
- Prior art keywords
- thermomechanical part
- titanium alloy
- beta
- thermomechanical
- turbocharger
- Prior art date
Links
- 230000000930 thermomechanical effect Effects 0.000 title 3
- 229910001040 Beta-titanium Inorganic materials 0.000 title 1
- 229910001069 Ti alloy Inorganic materials 0.000 title 1
- 229910045601 alloy Inorganic materials 0.000 title 1
- 239000000956 alloy Substances 0.000 title 1
- 238000005242 forging Methods 0.000 title 1
- 238000004519 manufacturing process Methods 0.000 title 1
- 238000000034 method Methods 0.000 title 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J1/00—Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
- B21J1/04—Shaping in the rough solely by forging or pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21K—MAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
- B21K3/00—Making engine or like machine parts not covered by sub-groups of B21K1/00; Making propellers or the like
- B21K3/04—Making engine or like machine parts not covered by sub-groups of B21K1/00; Making propellers or the like blades, e.g. for turbines; Upsetting of blade roots
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C14/00—Alloys based on titanium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/16—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of other metals or alloys based thereon
- C22F1/18—High-melting or refractory metals or alloys based thereon
- C22F1/183—High-melting or refractory metals or alloys based thereon of titanium or alloys based thereon
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Forging (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR0856337A FR2936172B1 (en) | 2008-09-22 | 2008-09-22 | PROCESS FOR FORGING A THERMOMECHANICAL PIECE OF TITANIUM ALLOY |
| PCT/FR2009/051780 WO2010031982A1 (en) | 2008-09-22 | 2009-09-22 | Method for forging a titanium alloy thermomechanical part |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BRPI0919264A2 true BRPI0919264A2 (en) | 2015-12-15 |
Family
ID=40821901
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI0919264A BRPI0919264A2 (en) | 2008-09-22 | 2009-09-22 | forging processes of a thermomechanical part of beta or alpha / beta titanium alloy, fabrication of a thermomechanical part made of titanium alloy, thermomechanical part, and turbocharger |
Country Status (9)
| Country | Link |
|---|---|
| US (1) | US20110192509A1 (en) |
| EP (1) | EP2344290B1 (en) |
| JP (1) | JP2012502803A (en) |
| CN (1) | CN102159340B (en) |
| BR (1) | BRPI0919264A2 (en) |
| CA (1) | CA2737412A1 (en) |
| FR (1) | FR2936172B1 (en) |
| RU (1) | RU2510680C2 (en) |
| WO (1) | WO2010031982A1 (en) |
Families Citing this family (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2979702B1 (en) | 2011-09-05 | 2013-09-20 | Snecma | PROCESS FOR THE PREPARATION OF TESTS WITH MECHANICAL CHARACTERIZATION OF A TITANIUM ALLOY |
| RU2469122C1 (en) * | 2011-10-21 | 2012-12-10 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный авиационный технический университет" | Method of thermomechanical treatment of workpieces from two-phase titanium alloys |
| FR2982279B1 (en) * | 2011-11-08 | 2013-12-13 | Snecma | PROCESS FOR MANUFACTURING A PIECE PRODUCED IN A TITANIUM ALLOY TA6ZR4DE |
| CN102517530B (en) * | 2011-12-16 | 2013-09-11 | 陕西宏远航空锻造有限责任公司 | Hot working method for improving structure property of Ti5553 titanium alloy |
| JP6324736B2 (en) * | 2014-01-23 | 2018-05-16 | 株式会社日立製作所 | Forging method and apparatus |
| FR3024160B1 (en) * | 2014-07-23 | 2016-08-19 | Messier Bugatti Dowty | PROCESS FOR PRODUCING A METAL ALLOY WORKPIECE |
| FR3027921B1 (en) * | 2014-10-31 | 2025-12-05 | Snecma | Titanium-based alloys with improved mechanical properties |
| CN109722564A (en) * | 2019-01-10 | 2019-05-07 | 青海聚能钛金属材料技术研究有限公司 | Ti-6242 titanium alloy and preparation method thereof |
| CN109722565A (en) * | 2019-01-10 | 2019-05-07 | 青海聚能钛金属材料技术研究有限公司 | High temperature resistant titanium alloy and its preparation method and application |
| CN111842747B (en) * | 2020-06-17 | 2022-07-22 | 西部超导材料科技股份有限公司 | Forging method of large-size TA15 titanium alloy special-shaped forging stock |
| CN113976658B (en) * | 2021-10-22 | 2024-06-25 | 西部金属材料股份有限公司 | Preparation method of ultra-large titanium alloy pipe |
| CN114178453B (en) * | 2021-11-04 | 2023-08-18 | 大冶特殊钢有限公司 | Radial forging method of high-alloy square billet |
Family Cites Families (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2070055B (en) * | 1980-02-14 | 1983-04-13 | Rolls Royce | Forging a ti-base alloy |
| JPS57202935A (en) * | 1981-06-04 | 1982-12-13 | Sumitomo Metal Ind Ltd | Forging method for titanium alloy |
| JPS58145323A (en) * | 1982-02-22 | 1983-08-30 | Toshiba Corp | Forging method of titanium alloy |
| JPH0289532A (en) * | 1988-09-27 | 1990-03-29 | Sumitomo Metal Ind Ltd | Isothermal forging method for ti alloy |
| JP3367392B2 (en) * | 1997-08-28 | 2003-01-14 | 住友金属工業株式会社 | Manufacturing method of titanium slab |
| JP3559717B2 (en) * | 1998-10-29 | 2004-09-02 | トヨタ自動車株式会社 | Manufacturing method of engine valve |
| US6332935B1 (en) * | 2000-03-24 | 2001-12-25 | General Electric Company | Processing of titanium-alloy billet for improved ultrasonic inspectability |
| FR2836640B1 (en) * | 2002-03-01 | 2004-09-10 | Snecma Moteurs | THIN PRODUCTS OF TITANIUM BETA OR QUASI BETA ALLOYS MANUFACTURING BY FORGING |
| US6884279B2 (en) * | 2002-07-25 | 2005-04-26 | General Electric Company | Producing metallic articles by reduction of nonmetallic precursor compounds and melting |
| RU2229952C1 (en) * | 2002-11-15 | 2004-06-10 | Федеральное государственное унитарное предприятие "Московское машиностроительное производственное предприятие "Салют" | Method for forming blanks of titanium alloys |
| US6754954B1 (en) * | 2003-07-08 | 2004-06-29 | Borgwarner Inc. | Process for manufacturing forged titanium compressor wheel |
| RU2246556C1 (en) * | 2004-01-22 | 2005-02-20 | Федеральное государственное унитарное предприятие "Всероссийский научно-исследовательский институт авиационных материалов" (ФГУП "ВИАМ") | Method for production of strained feed from titanium-based alloy and product made from the same |
| US20080035250A1 (en) * | 2006-08-09 | 2008-02-14 | United Technologies Corporation | Grain refinement of titanium alloys |
| CN100567534C (en) * | 2007-06-19 | 2009-12-09 | 中国科学院金属研究所 | Thermal processing and heat treatment method of a high-temperature titanium alloy with high thermal strength and high thermal stability |
-
2008
- 2008-09-22 FR FR0856337A patent/FR2936172B1/en active Active
-
2009
- 2009-09-22 EP EP09748827.4A patent/EP2344290B1/en active Active
- 2009-09-22 JP JP2011527386A patent/JP2012502803A/en active Pending
- 2009-09-22 RU RU2011115813/02A patent/RU2510680C2/en active
- 2009-09-22 US US13/120,048 patent/US20110192509A1/en not_active Abandoned
- 2009-09-22 CN CN200980137246.0A patent/CN102159340B/en active Active
- 2009-09-22 WO PCT/FR2009/051780 patent/WO2010031982A1/en not_active Ceased
- 2009-09-22 BR BRPI0919264A patent/BRPI0919264A2/en not_active IP Right Cessation
- 2009-09-22 CA CA2737412A patent/CA2737412A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| CN102159340A (en) | 2011-08-17 |
| JP2012502803A (en) | 2012-02-02 |
| CN102159340B (en) | 2014-08-27 |
| EP2344290A1 (en) | 2011-07-20 |
| US20110192509A1 (en) | 2011-08-11 |
| CA2737412A1 (en) | 2010-03-25 |
| RU2011115813A (en) | 2012-10-27 |
| WO2010031982A1 (en) | 2010-03-25 |
| RU2510680C2 (en) | 2014-04-10 |
| EP2344290B1 (en) | 2021-07-21 |
| FR2936172A1 (en) | 2010-03-26 |
| FR2936172B1 (en) | 2012-07-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI0919264A2 (en) | forging processes of a thermomechanical part of beta or alpha / beta titanium alloy, fabrication of a thermomechanical part made of titanium alloy, thermomechanical part, and turbocharger | |
| BRPI1013084A2 (en) | fatigue resistant cast titanium alloy articles | |
| ES2670297T8 (en) | Processing of alpha/beta titanium alloys | |
| PL2619341T3 (en) | A method of producing fasteners from an alpha / beta titanium alloy | |
| BRPI0616916A2 (en) | metallic titanium or a titanium alloy, ti powder or ti based alloy powder, and | |
| EP2443449A4 (en) | Determination of coronary artery disease risk. | |
| HUE037427T2 (en) | Machining path for titanium and titanium alloys | |
| BR112012002124A2 (en) | treatment of crohn's disease with laquinimode. | |
| BR112012002571A2 (en) | titanium ore treatment | |
| BR112012018084A2 (en) | secondary titanium alloy and secondary titanium alloy manufacturing process | |
| BRPI0912151A2 (en) | resorbable magnesium alloy | |
| BRPI1014048A2 (en) | combustion method, method for affecting the oxidation state of metal species, and furnace. | |
| BRPI0909179A2 (en) | Pharmaceutical composition and method of treatment of an autoimmune disease. | |
| BRPI1016194A2 (en) | Insecticidal composition comprising a spinosine and a metal oxide. | |
| HUE061548T2 (en) | Methods and compositions for the treatment of complement-related disorders | |
| UA109892C2 (en) | METHOD OF THERMOMECHANICAL PROCESSING OF TITANIUM ALLOY (OPTIONS) | |
| EP2508643A4 (en) | Titanium alloy part and method of manufacturing same | |
| BR112013006741A2 (en) | Manufacturing method of quasi-beta titanium alloy forgings | |
| BRPI1012342A2 (en) | wear resistant alloy | |
| BRPI0919278A2 (en) | process for manufacturing a titanium alloy | |
| BR112012001761A2 (en) | compound of formula i, pharmaceutical compound and method of treating a metal-mediated condition in an individual | |
| EP2225101A4 (en) | NANOSTRUCTURED REFRACTORY METALS, METAL CARBIDE, AND COATINGS AND PARTS MANUFACTURED THEREFROM | |
| BR112012016917A2 (en) | aluminum alloy molding part with high mechanical strength and hot deformation | |
| BRPI0814836A2 (en) | Metal and alloy production method by carbothermal reduction of metal oxides | |
| BRPI1011535A2 (en) | treatment of insulin resistant disorders. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B08F | Application fees: application dismissed [chapter 8.6 patent gazette] |
Free format text: REFERENTE AS 6A E 7A ANUIDADES. |
|
| B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2376 DE 19-07-2016 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013. |