BRPI0815539A2 - Método para controlar o fluxo de entrada de petróleo brto, gás natural e/ou de outros efluentes. - Google Patents
Método para controlar o fluxo de entrada de petróleo brto, gás natural e/ou de outros efluentes.Info
- Publication number
- BRPI0815539A2 BRPI0815539A2 BRPI0815539-9A2A BRPI0815539A BRPI0815539A2 BR PI0815539 A2 BRPI0815539 A2 BR PI0815539A2 BR PI0815539 A BRPI0815539 A BR PI0815539A BR PI0815539 A2 BRPI0815539 A2 BR PI0815539A2
- Authority
- BR
- Brazil
- Prior art keywords
- brto
- oil
- control
- natural gas
- input flow
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/02—Down-hole chokes or valves for variably regulating fluid flow
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Feedback Control In General (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP07114565 | 2007-08-17 | ||
| PCT/EP2008/060750 WO2009024545A1 (en) | 2007-08-17 | 2008-08-15 | Method for controlling production and downhole pressures of a well with multiple subsurface zones and/or branches |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| BRPI0815539A2 true BRPI0815539A2 (pt) | 2015-02-10 |
| BRPI0815539B1 BRPI0815539B1 (pt) | 2018-10-16 |
| BRPI0815539B8 BRPI0815539B8 (pt) | 2019-08-20 |
Family
ID=38698789
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI0815539A BRPI0815539B8 (pt) | 2007-08-17 | 2008-08-15 | método para controlar o fluxo de entrada de petróleo bruto, gás natural e/ou de outros efluentes. |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US8290632B2 (pt) |
| AU (1) | AU2008290585B2 (pt) |
| BR (1) | BRPI0815539B8 (pt) |
| CA (1) | CA2692996C (pt) |
| GB (1) | GB2464009B (pt) |
| WO (1) | WO2009024545A1 (pt) |
Families Citing this family (34)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011037914A2 (en) | 2009-09-22 | 2011-03-31 | Schlumberger Canada Limited | Inflow control device and methods for using same |
| US8924029B2 (en) * | 2011-02-23 | 2014-12-30 | Honeywell International Inc. | Apparatus and method for increasing the ultimate recovery of natural gas contained in shale and other tight gas reservoirs |
| US9085966B2 (en) * | 2012-02-27 | 2015-07-21 | Saudi Arabian Oil Company | Method for transient testing of oil wells completed with inflow control devices |
| RU2577257C2 (ru) * | 2012-11-19 | 2016-03-10 | Инвенсис Системз, Инк. | Система испытания скважины на чистую нефть и газ |
| BR112015014665B1 (pt) | 2012-12-21 | 2021-11-09 | Seabed Separation As | Separador inclinado para separar substâncias de poço de óleo, método para operar um separador inclinado para separar substâncias de poço de óleo, uso de um separador inclinado, e, sistema separador para separar substâncias de poço de óleo |
| US9103184B2 (en) | 2013-03-08 | 2015-08-11 | Tejas Research & Engineering, Llc | Inflow control valve |
| US10337283B2 (en) * | 2013-03-29 | 2019-07-02 | Schlumberger Technology Corporation | Optimum flow control valve setting system and procedure |
| US10072485B2 (en) * | 2014-02-12 | 2018-09-11 | Rockwell Automation Asia Pacific Business Center Pte. Ltd. | Systems and methods for localized well analysis and control |
| BR112017006134B1 (pt) * | 2014-09-25 | 2021-07-13 | Total S.A. | Produção de hidrocarbonetos com separador de teste |
| US20160333685A1 (en) * | 2015-05-16 | 2016-11-17 | Phase Dynamics, Inc. | Apparatuses and Methods for Detecting Faults in Pipeline Infrastructure Using Well Measurement Data |
| US10280722B2 (en) | 2015-06-02 | 2019-05-07 | Baker Hughes, A Ge Company, Llc | System and method for real-time monitoring and estimation of intelligent well system production performance |
| US9864353B2 (en) * | 2015-06-18 | 2018-01-09 | Schlumberger Technology Corporation | Flow balancing for a well |
| BR112018001291A2 (pt) | 2015-09-02 | 2018-09-11 | Halliburton Energy Services Inc | sistema para uso com um furo de poço e dispositivo de detecção de pressão para uso em um furo de poço |
| US10605075B2 (en) * | 2015-10-29 | 2020-03-31 | Sensia Netherlands B.V. | Systems and methods for acquiring multiphase measurements at a well site |
| NO344235B1 (en) | 2018-01-05 | 2019-10-14 | Roxar Software Solutions As | Well flow simulation system |
| US11180976B2 (en) | 2018-12-21 | 2021-11-23 | Exxonmobil Upstream Research Company | Method and system for unconventional gas lift optimization |
| US11441395B2 (en) | 2019-05-16 | 2022-09-13 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling |
| US11499423B2 (en) | 2019-05-16 | 2022-11-15 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration |
| US11326423B2 (en) * | 2019-05-16 | 2022-05-10 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings |
| US12260158B2 (en) * | 2019-06-03 | 2025-03-25 | Schlumberger Technology Corporation | Flow control device openings for completion design |
| US20220228465A1 (en) * | 2019-07-02 | 2022-07-21 | Landmark Graphics Corporation | Multi-agent, multi-objective wellbore gas-lift optimization |
| US10982516B2 (en) | 2019-09-03 | 2021-04-20 | Saudi Arabian Oil Company | Systems and methods for operating downhole inflow control valves to provide sufficient pump intake pressure |
| US11821289B2 (en) | 2019-11-18 | 2023-11-21 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis |
| US11339636B2 (en) | 2020-05-04 | 2022-05-24 | Saudi Arabian Oil Company | Determining the integrity of an isolated zone in a wellbore |
| US11441390B2 (en) | 2020-07-07 | 2022-09-13 | Saudi Arabian Oil Company | Multilevel production control for complex network of wells with smart completions |
| US11859473B2 (en) * | 2020-11-10 | 2024-01-02 | Saudi Arabian Oil Company | Automatic in-situ gas lifting using inflow control valves |
| CN112580851B (zh) * | 2020-11-17 | 2024-06-18 | 西安中控天地科技开发有限公司 | 丛式井场抽油机井群错峰开井间抽运行调度方法 |
| US11867034B2 (en) * | 2021-06-17 | 2024-01-09 | Halliburton Energy Services, Inc. | Systems and methods for automated gas lift monitoring |
| CN113417612A (zh) * | 2021-08-05 | 2021-09-21 | 中国石油天然气股份有限公司 | 一种井下节流施工作业方法及井下节流器 |
| CN118159715A (zh) * | 2021-10-12 | 2024-06-07 | 斯伦贝谢技术有限公司 | 用于获得流入量和测量地面地层流体参数的地面井测试设施和电缆地层测试仪与主动循环系统的组合 |
| US20230151732A1 (en) * | 2021-11-12 | 2023-05-18 | Ideal Completion Services Llc | Flowback monitoring system and methods |
| US12085687B2 (en) | 2022-01-10 | 2024-09-10 | Saudi Arabian Oil Company | Model-constrained multi-phase virtual flow metering and forecasting with machine learning |
| US20230313647A1 (en) * | 2022-03-31 | 2023-10-05 | Halliburton Energy Services, Inc. | Methods to dynamically control fluid flow in a multi-well system, methods to dynamically provide real-time status of fluid flow in a multi-well system, and multi-well fluid flow control systems |
| US20240279993A1 (en) * | 2023-02-22 | 2024-08-22 | Halliburton Energy Services, Inc. | Control of well system using autonomous wellbore tractor |
Family Cites Families (46)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4636934A (en) * | 1984-05-21 | 1987-01-13 | Otis Engineering Corporation | Well valve control system |
| GB9025230D0 (en) * | 1990-11-20 | 1991-01-02 | Framo Dev Ltd | Well completion system |
| NO320593B1 (no) * | 1997-05-06 | 2005-12-27 | Baker Hughes Inc | System og fremgangsmate for produksjon av formasjonsfluid i en undergrunnsformasjon |
| US6367566B1 (en) * | 1998-02-20 | 2002-04-09 | Gilman A. Hill | Down hole, hydrodynamic well control, blowout prevention |
| CA2290050A1 (en) * | 1998-11-23 | 2000-05-23 | Halliburton Energy Services, Inc. | Intelligent down hole testing system |
| US6330913B1 (en) * | 1999-04-22 | 2001-12-18 | Schlumberger Technology Corporation | Method and apparatus for testing a well |
| GB9916022D0 (en) * | 1999-07-09 | 1999-09-08 | Sensor Highway Ltd | Method and apparatus for determining flow rates |
| US7073594B2 (en) * | 2000-03-02 | 2006-07-11 | Shell Oil Company | Wireless downhole well interval inflow and injection control |
| EG22420A (en) * | 2000-03-02 | 2003-01-29 | Shell Int Research | Use of downhole high pressure gas in a gas - lift well |
| US6478091B1 (en) * | 2000-05-04 | 2002-11-12 | Halliburton Energy Services, Inc. | Expandable liner and associated methods of regulating fluid flow in a well |
| US20020049575A1 (en) * | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
| US7062420B2 (en) * | 2000-10-04 | 2006-06-13 | Schlumberger Technology Corp. | Production optimization methodology for multilayer commingled reservoirs using commingled reservoir production performance data and production logging information |
| GB0024378D0 (en) * | 2000-10-05 | 2000-11-22 | Expro North Sea Ltd | Improved well testing system |
| US6937923B1 (en) * | 2000-11-01 | 2005-08-30 | Weatherford/Lamb, Inc. | Controller system for downhole applications |
| NO314701B3 (no) * | 2001-03-20 | 2007-10-08 | Reslink As | Stromningsstyreanordning for struping av innstrommende fluider i en bronn |
| GB2376488B (en) * | 2001-06-12 | 2004-05-12 | Schlumberger Holdings | Flow control regulation method and apparatus |
| US6857475B2 (en) * | 2001-10-09 | 2005-02-22 | Schlumberger Technology Corporation | Apparatus and methods for flow control gravel pack |
| US6561041B1 (en) * | 2001-11-28 | 2003-05-13 | Conocophillips Company | Production metering and well testing system |
| US6508312B1 (en) * | 2002-02-13 | 2003-01-21 | Frank's Casing Crew And Rental Tools, Inc. | Flow control apparatus and method |
| US7370705B2 (en) * | 2002-05-06 | 2008-05-13 | Baker Hughes Incorporated | Multiple zone downhole intelligent flow control valve system and method for controlling commingling of flows from multiple zones |
| US6854522B2 (en) * | 2002-09-23 | 2005-02-15 | Halliburton Energy Services, Inc. | Annular isolators for expandable tubulars in wellbores |
| US20040062658A1 (en) * | 2002-09-27 | 2004-04-01 | Beck Thomas L. | Control system for progressing cavity pumps |
| US7668694B2 (en) * | 2002-11-26 | 2010-02-23 | Unico, Inc. | Determination and control of wellbore fluid level, output flow, and desired pump operating speed, using a control system for a centrifugal pump disposed within the wellbore |
| US7303010B2 (en) * | 2002-10-11 | 2007-12-04 | Intelligent Robotic Corporation | Apparatus and method for an autonomous robotic system for performing activities in a well |
| EP2216502B1 (en) * | 2003-05-31 | 2017-10-04 | OneSubsea IP UK Limited | Apparatus and method for recovering fluids from a well and/or injecting fluids into a well |
| GB2405419B (en) * | 2003-09-01 | 2006-03-08 | Maxwell Downhole Technology Lt | Downhole tool & method |
| US20050263287A1 (en) * | 2004-05-26 | 2005-12-01 | Schlumberger Technology Corporation | Flow Control in Conduits from Multiple Zones of a Well |
| US7290606B2 (en) * | 2004-07-30 | 2007-11-06 | Baker Hughes Incorporated | Inflow control device with passive shut-off feature |
| DE602005006305T2 (de) * | 2004-11-01 | 2009-06-25 | Shell Internationale Research Maatschappij B.V. | Verfahren und system zur dosierung der produktion von ölbohrlöchern |
| US7455114B2 (en) * | 2005-01-25 | 2008-11-25 | Schlumberger Technology Corporation | Snorkel device for flow control |
| CN101233527B (zh) * | 2005-07-27 | 2012-07-04 | 埃克森美孚上游研究公司 | 与从地下岩层抽取碳氢化合物相关的井建模 |
| WO2007018858A2 (en) * | 2005-07-27 | 2007-02-15 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
| WO2007018860A2 (en) * | 2005-07-27 | 2007-02-15 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
| CA2648024C (en) * | 2006-04-03 | 2012-11-13 | Exxonmobil Upstream Research Company | Wellbore method and apparatus for sand and inflow control during well operations |
| CA2645902C (en) | 2006-04-07 | 2014-05-20 | Shell Canada Limited | Method for optimising the production of a cluster of wells |
| EA200802115A1 (ru) | 2006-04-07 | 2009-02-27 | Шелл Интернэшнл Рисерч Маатсхаппий Б.В. | Способ измерения производительности нефтяных скважин |
| US7660648B2 (en) * | 2007-01-10 | 2010-02-09 | Halliburton Energy Services, Inc. | Methods for self-balancing control of mixing and pumping |
| US7620481B2 (en) * | 2007-01-10 | 2009-11-17 | Halliburton Energy Services, Inc. | Systems for self-balancing control of mixing and pumping |
| US7832473B2 (en) * | 2007-01-15 | 2010-11-16 | Schlumberger Technology Corporation | Method for controlling the flow of fluid between a downhole formation and a base pipe |
| US8131470B2 (en) * | 2007-02-26 | 2012-03-06 | Bp Exploration Operating Company Limited | Managing flow testing and the results thereof for hydrocarbon wells |
| US7711486B2 (en) * | 2007-04-19 | 2010-05-04 | Baker Hughes Incorporated | System and method for monitoring physical condition of production well equipment and controlling well production |
| US20080308274A1 (en) * | 2007-06-16 | 2008-12-18 | Schlumberger Technology Corporation | Lower Completion Module |
| US7789145B2 (en) * | 2007-06-20 | 2010-09-07 | Schlumberger Technology Corporation | Inflow control device |
| US7640975B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Flow control for increased permeability planes in unconsolidated formations |
| US8037940B2 (en) * | 2007-09-07 | 2011-10-18 | Schlumberger Technology Corporation | Method of completing a well using a retrievable inflow control device |
| US7971637B2 (en) * | 2009-02-26 | 2011-07-05 | Devin International, Inc. | Dual mini well surface control system |
-
2008
- 2008-08-15 CA CA2692996A patent/CA2692996C/en active Active
- 2008-08-15 GB GB0922712.5A patent/GB2464009B/en active Active
- 2008-08-15 BR BRPI0815539A patent/BRPI0815539B8/pt active IP Right Grant
- 2008-08-15 WO PCT/EP2008/060750 patent/WO2009024545A1/en not_active Ceased
- 2008-08-15 AU AU2008290585A patent/AU2008290585B2/en active Active
-
2010
- 2010-02-15 US US12/705,861 patent/US8290632B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| GB2464009A (en) | 2010-04-07 |
| BRPI0815539B8 (pt) | 2019-08-20 |
| CA2692996A1 (en) | 2009-02-26 |
| GB2464009B (en) | 2012-05-16 |
| CA2692996C (en) | 2016-01-12 |
| GB0922712D0 (en) | 2010-02-17 |
| AU2008290585A1 (en) | 2009-02-26 |
| WO2009024545A1 (en) | 2009-02-26 |
| AU2008290585B2 (en) | 2011-10-06 |
| BRPI0815539B1 (pt) | 2018-10-16 |
| US20100217575A1 (en) | 2010-08-26 |
| US8290632B2 (en) | 2012-10-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI0815539A2 (pt) | Método para controlar o fluxo de entrada de petróleo brto, gás natural e/ou de outros efluentes. | |
| BRPI0719858A2 (pt) | Fluido de hidrocarbonetos, e, método para produzir fluidos de hidrocarbonetos. | |
| BRPI0815839A2 (pt) | Composição de fluido hidráulico, e, método para operar uma transmissão hidráulica. | |
| BRPI1015087A2 (pt) | fluido de perfuração, e, método. | |
| BRPI0816854A2 (pt) | Aparelho regulador de fluido, e, regulador de fluido | |
| BRPI0817961A2 (pt) | Método para tratar uma formação subterrânea, e, fluido de tratamento | |
| CR10075A (es) | Bifenilcarboxamidas para combatir microorganismos. | |
| BRPI0813177A2 (pt) | Dispersão de escamas de sulfeto em sistemas de produção de gás e óleo | |
| BRPI0818772A2 (pt) | Dispositivo, método, e, meio legível por computador. | |
| BRPI0916262A2 (pt) | método para intensificar a recuperação de sulfeto valioso ou minerais preciosos, e, composição. | |
| BRPI0811857A2 (pt) | Regiões fc (scfc) de cadeia simples, polipeptídeos de aglutinação que as compreendem e métodos relacionados. | |
| BRPI0816151A2 (pt) | válvula utilizável com um poço, sistema usável com um poço, e método usável com um poço | |
| BRPI0917120A2 (pt) | método, e, meio legível por computador. | |
| BRPI0815494A2 (pt) | Método implementado por computador, e, sistema. | |
| BRPI0907473A2 (pt) | métodos, sistemas e dispositivos de separação de fluidos | |
| BRPI0822078A2 (pt) | Método, e, sistema. | |
| BRPI0813914A2 (pt) | Sistema, e, método. | |
| EP2162600A4 (en) | VARIABLE VALVE ACTUATION SYSTEM | |
| BRPI0920561A2 (pt) | válvula, e, aparelho de controle de fluido | |
| BRPI0807216A2 (pt) | Fluido de tratamento, e, método para tratar uma formação subterrânea | |
| BRPI0916942A2 (pt) | método, e, particulado do aditivo contra perda de fluido. | |
| NL1036726A1 (nl) | Safety valve torsional spring assembly and method. | |
| BRPI0810190A2 (pt) | Sistema, e, método. | |
| BRPI0906086A2 (pt) | Método, sistemas e meio legível por computador. | |
| BRPI0822751A2 (pt) | Conjunto-guia de tubulação, embarcação para assentamento de tubulações, e, método de assentamento de uma tubulação. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B07A | Application suspended after technical examination (opinion) [chapter 7.1 patent gazette] | ||
| B09A | Decision: intention to grant [chapter 9.1 patent gazette] | ||
| B16A | Patent or certificate of addition of invention granted [chapter 16.1 patent gazette] |
Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 16/10/2018, OBSERVADAS AS CONDICOES LEGAIS. |
|
| B16C | Correction of notification of the grant [chapter 16.3 patent gazette] |
Free format text: PRAZO DE VALIDADE: 10 (DEZ) ANOS CONTADOS A PARTIR DE 16/10/2018, OBSERVADAS AS CONDICOES LEGAIS. (CO) REFERENTE A RPI 2493 DE 16/10/2018, QUANTO AO ITEM (72) NOME DO INVENTOR. |