BR8303289U - Precast reinforced concrete structure for covering large spans with continuous scissor beam - Google Patents
Precast reinforced concrete structure for covering large spans with continuous scissor beamInfo
- Publication number
- BR8303289U BR8303289U BR8303289U BR8303289U BR8303289U BR 8303289 U BR8303289 U BR 8303289U BR 8303289 U BR8303289 U BR 8303289U BR 8303289 U BR8303289 U BR 8303289U BR 8303289 U BR8303289 U BR 8303289U
- Authority
- BR
- Brazil
- Prior art keywords
- parts
- splice
- scissor beam
- site
- continuous
- Prior art date
Links
- 239000011150 reinforced concrete Substances 0.000 title 1
- 238000001035 drying Methods 0.000 abstract 1
- 239000011440 grout Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 239000002994 raw material Substances 0.000 abstract 1
- 238000003466 welding Methods 0.000 abstract 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
"ESTRUTURA PRé-MOLDADA DE CONCRETO ARMADO PARA COBERTURA DE GRANDES VãOS COM VIGA-TESOURA CONTìNUA". Patente de Modelo de utilidade para uma viga-tesoura pré-moldada continua 2 com emenda executada no local da obra 1, constituída por duas partes 8 produzidas em fábricas transportadas separadas até o local da obra e emendadas 1 formando a partir deste procedimento uma peça única 2. A emenda 1 poderá ser executada de três maneiras distintas de acordo com a matéria prima e mão-de-obra disponíveis na região: Primeira; emenda 1 por adição de graute entre as duas partes 8 da viga-tesoura 2, onde existem os insertos 10 necessários para efetivar a emenda(engaste) 1. Segunda; emenda 1 pela colocação de parafusos 15 em flanges 12 existentes no topo das duas partes 8 da viga-tesoura 2 transformando-as em peça única. Terceira; emenda 1 pela execução de solda entre as chapas 18 existentes no topo das duas partes 8 da viga-tesoura 2, tornando-as peça única, que após a secagem do acabamento 20 do local da solda 19 estará pronta para ser montada. Este sistema tem a vantagem que as peças 8 podem ser transportadas até o local da obra por equipamentos comuns (carretas) e após a emenda 1 são montadas com a utilização de apenas um quindaste para elevação."PRE-FRAMED CONCRETE ARMED STRUCTURE FOR COVERING LARGE SPANTS WITH CONTINUOUS SCREW". Utility Model Patent for a continuous precast scissor beam 2 with splicing performed on site 1, consisting of two parts 8 produced in factories transported separately to the site and spliced 1 forming from this procedure a single part 2. Amendment 1 may be implemented in three different ways according to the raw materials and labor available in the region: First; splice 1 by adding grout between the two parts 8 of the scissor beam 2, where there are the inserts 10 necessary to effect splice 1. Second; 1 by placing screws 15 on flanges 12 on top of the two parts 8 of scissor beam 2 into one piece. Third; splice 1 by welding between the plates 18 at the top of the two parts 8 of the scissor beam 2, making them one-piece, which after drying the finish 20 of the weld site 19 is ready to be assembled. This system has the advantage that parts 8 can be transported to the job site by standard equipment (wagons) and after splice 1 are assembled using only one lifting crane.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BR8303289U BR8303289U (en) | 2003-11-10 | 2003-11-10 | Precast reinforced concrete structure for covering large spans with continuous scissor beam |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| BR8303289U BR8303289U (en) | 2003-11-10 | 2003-11-10 | Precast reinforced concrete structure for covering large spans with continuous scissor beam |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BR8303289U true BR8303289U (en) | 2005-07-05 |
Family
ID=34705973
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BR8303289U BR8303289U (en) | 2003-11-10 | 2003-11-10 | Precast reinforced concrete structure for covering large spans with continuous scissor beam |
Country Status (1)
| Country | Link |
|---|---|
| BR (1) | BR8303289U (en) |
-
2003
- 2003-11-10 BR BR8303289U patent/BR8303289U/en not_active Application Discontinuation
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105696817B (en) | A kind of multilayer cold formed steel is integral prefabricated to assemble house and its joining method | |
| BR0006981A (en) | Prefabricated beam in two halves and roof structure | |
| CN103276893A (en) | Novel composite structure for supporting rigid building template and construction method | |
| GB1115227A (en) | Forming a prefabricated truss deck | |
| BR8303289U (en) | Precast reinforced concrete structure for covering large spans with continuous scissor beam | |
| CN204492333U (en) | A kind of assembling fire wall | |
| CA2574722A1 (en) | System for reinforcing a building structural component | |
| CN106836641A (en) | Side sticking steel plate formula Combined concrete coupling beam | |
| CN207420026U (en) | Part bracing means is poured after a kind of superimposed sheet | |
| CN204418558U (en) | A kind of separate type precast hollow landing | |
| CN205576737U (en) | Trompil steel pipe steel and concrete composite beam bridge structure | |
| CN205776901U (en) | The connecting structure of L-type shear wall edge member | |
| CN204326556U (en) | A kind of large-span truss for both wired upper bridge constructions is safe guarding shed | |
| CN105155675B (en) | A kind of node structure of steel bar girder floor plates integral installation | |
| CN204252020U (en) | Bridge engineering coping construction bracket | |
| CN220790599U (en) | Wall column template | |
| CN205822778U (en) | Stiff giant column screw-free aluminum alloy template system | |
| CN208934397U (en) | A kind of Steel-wood forming board support device of the big section concrete structure of super thick | |
| CN202492952U (en) | Prefabricated floor support plate | |
| SU1428825A1 (en) | Three-ply wall panel | |
| CN210887673U (en) | Steel construction building assembled aerated concrete shear force wall body | |
| CN209924134U (en) | a house building | |
| BR8000528U (en) | Precast wall | |
| CN106738230A (en) | A kind of production method of fabricated shear wall component | |
| CN106493837B (en) | A kind of general side mode being used to prepare fabricated shear wall component |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B11A | Dismissal acc. art.33 of ipl - examination not requested within 36 months of filing | ||
| B11Y | Definitive dismissal acc. article 33 of ipl - extension of time limit for request of examination expired |