BR202022009801U2 - PRECAST BEAM HOUSE - Google Patents

PRECAST BEAM HOUSE Download PDF

Info

Publication number
BR202022009801U2
BR202022009801U2 BR202022009801-3U BR202022009801U BR202022009801U2 BR 202022009801 U2 BR202022009801 U2 BR 202022009801U2 BR 202022009801 U BR202022009801 U BR 202022009801U BR 202022009801 U2 BR202022009801 U2 BR 202022009801U2
Authority
BR
Brazil
Prior art keywords
house
slab
construction
concrete
walls
Prior art date
Application number
BR202022009801-3U
Other languages
Portuguese (pt)
Inventor
Nicodemos José Alves
Original Assignee
Nicodemos José Alves
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nicodemos José Alves filed Critical Nicodemos José Alves
Priority to BR202022009801-3U priority Critical patent/BR202022009801U2/en
Publication of BR202022009801U2 publication Critical patent/BR202022009801U2/en

Links

Landscapes

  • Panels For Use In Building Construction (AREA)

Abstract

Patente de modelo de utilidade a qual se refere a estruturas de obras civis para construções comerciais e residencial em geral, a qual possui velocidade e agilidade na construção, tendo em vista ser uma casa feita de concreto armado com uma estrutura de aço gago em forma de malha pop. Tem também uma estrutura em forma de perfil U onde possibilita a junção das peças através de solda elétrica, com possibilidade de variação de espessura da parede entre 0.06 cm a 0,10 cm, para possibilitar a construção de um 2º pavimento e até mesmo muros de arrimo. As partes elétricas e hidráulicas de toda a estrutura também já são embutidas nas paredes, ficando somente a parte da tubulação de esgoto a fazer posteriormente na obra. A laje da casa é uma laje de concreto maciço em forma de painel, que também é pré-fabricada e depois de curado o concreto é montado e fixado na casa, diminuindo em 15 dias a etapa de concretagem da laje e consequentemente a mão de obra.Utility model patent which refers to civil works structures for commercial and residential construction in general, which has speed and agility in construction, considering it is a house made of reinforced concrete with a stuttering steel structure in the shape of a pop mesh. It also has a structure in the shape of a U profile which allows the pieces to be joined using electric welding, with the possibility of varying the wall thickness between 0.06 cm and 0.10 cm, to enable the construction of a 2nd floor and even walls. support. The electrical and hydraulic parts of the entire structure are also built into the walls, with only the sewage pipe part remaining to be done later in the work. The slab of the house is a solid concrete slab in the form of a panel, which is also prefabricated and after curing the concrete is assembled and fixed to the house, reducing the concreting stage of the slab and consequently the labor force by 15 days. .

Description

001 Patente de modelo de utilidade a qual se refere estruturas de obras civis para construções comerciais e residenciais em geral, a qual possui velocidade e agilidade na construção, tendo em vista ser uma casa feita de concreto armado com uma estrutura de aço gago em forma de malha pop. Tem também uma estrutura em forma de perfil U onde possibilita a junção das peças através de solda elétrica, com possibilidade de variação de espessura da parede entre 0.06 cm a 0,10 cm, para possibilitar a construção de um 2° pavimento e até mesmo muros de arrimo.001 Utility model patent which refers to civil works structures for commercial and residential constructions in general, which has speed and agility in construction, considering it is a house made of reinforced concrete with a stuttering steel structure in the shape of a pop mesh. It also has a structure in the shape of a U profile which allows the pieces to be joined using electric welding, with the possibility of varying the wall thickness between 0.06 cm and 0.10 cm, to enable the construction of a 2nd floor and even walls support.

002 As partes elétricas e hidráulicas de toda a estrutura também já são embutidas nas paredes, ficando somente a parte da tubulação de esgoto a fazer posteriormente na obra. A laje da casa é uma laje de concreto maciço em forma de painel, que também é pré-fabricada e depois de curado o concreto é montado e fixado na casa, diminuindo em 15 dias a etapa de concretagem da laje e consequentemente a mão de obra.002 The electrical and hydraulic parts of the entire structure are also already built into the walls, with only the sewage pipe part remaining to be done later in the work. The slab of the house is a solid concrete slab in the form of a panel, which is also prefabricated and after curing the concrete is assembled and fixed to the house, reducing the concreting stage of the slab and consequently the labor force by 15 days. .

003 Após a instalação da laje, vem a cobertura, podendo ser feita com qualquer tipo de telha, desde a intermitente até um belo telhado colonial com telha cerâmica.003 After installing the slab, comes the roof, which can be made with any type of tile, from intermittent to a beautiful colonial roof with ceramic tiles.

004 As casas construídas no sistema convencional são construídas no local da obra, enquanto as casas de concreto treliças é projetada e fabricada na própria fábrica, logo em seguida montado no local definitivo da obra. Outra grande diferença se dá também na construção da parte estrutural da casa, como fundação, podendo ser feita encima de uma base, as casas feitas no modelo convencional são construídas com tijolos ou blocos de cimento e depois é feito o reboco, já as casas de concreto treliças são fabricadas integralmente de concreto armado e as peças já vão para o canteiro de obra rebocadas no próprio concreto no estilo decorativo grafiato. As diferenças da casa de concreto treliças em relação as casas convencionais, se dão principalmente na diminuição de mão de obra e no desperdício de material, tendo em vista que suas paredes não terem reboco de areia, são mais resistentes a umidade e prolonga por mais tempo uma possível reforma.004 Houses built using the conventional system are built at the construction site, while concrete truss houses are designed and manufactured in the factory itself, then assembled at the final construction site. Another big difference also occurs in the construction of the structural part of the house, such as the foundation, which can be built on top of a base. Houses made in the conventional model are built with bricks or cement blocks and then plastering is done, while houses made of Concrete trusses are manufactured entirely from reinforced concrete and the pieces go to the construction site plastered on the concrete itself in the grafato decorative style. The differences between concrete truss houses and conventional houses are mainly due to the reduction of labor and waste of material, considering that its walls do not have sand plaster, are more resistant to humidity and last longer possible reform.

Claims (4)

1. Caracterizado por uma estrutura em forma de perfil U onde possibilita a junção das peças através de solda elétrica.1. Characterized by a U-shaped structure that allows parts to be joined using electric welding. 2. Caracterizado por possibilitar construção variando as espessuras da parede entre 0.06 cm a 0,10 cm.2. Characterized by enabling construction varying wall thicknesses between 0.06 cm and 0.10 cm. 3. Caracterizado por partes elétricas e hidráulicas de toda a estrutura também já são embutidas nas paredes.3. Characterized by electrical and hydraulic parts of the entire structure are also already embedded in the walls. 4. Caracterizado por laje de concreto maciço em forma de painel pré-fabricado.4. Characterized by solid concrete slab in the form of a prefabricated panel.
BR202022009801-3U 2022-05-19 2022-05-19 PRECAST BEAM HOUSE BR202022009801U2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BR202022009801-3U BR202022009801U2 (en) 2022-05-19 2022-05-19 PRECAST BEAM HOUSE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BR202022009801-3U BR202022009801U2 (en) 2022-05-19 2022-05-19 PRECAST BEAM HOUSE

Publications (1)

Publication Number Publication Date
BR202022009801U2 true BR202022009801U2 (en) 2023-11-28

Family

ID=89075961

Family Applications (1)

Application Number Title Priority Date Filing Date
BR202022009801-3U BR202022009801U2 (en) 2022-05-19 2022-05-19 PRECAST BEAM HOUSE

Country Status (1)

Country Link
BR (1) BR202022009801U2 (en)

Similar Documents

Publication Publication Date Title
CN1344343A (en) Building structure and building structure system composed of foamed cement and light steel structure and forming method of structure system
WO2019239435A1 (en) Prefabricated polyethylene sandwich block and panel
CN112144674A (en) Precast concrete reversed ridge and construction method thereof
RU92037U1 (en) QUICK BUILDING BUILDING
WO1984001402A1 (en) Structural members
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN110593397A (en) Multilayer assembled plate type building
BR202022009801U2 (en) PRECAST BEAM HOUSE
CN104831857A (en) Prefabricated aerated concrete plate or block
TR200300306T2 (en) Flat under arch, double prestressed, composite, roof-ceiling construction for industrial buildings with large spans
JP4063831B2 (en) Exterior insulation prestressed building structure
CN219548070U (en) Assembled ceramic plate and gypsum pouring composite decoration integrated wall
Si Application of lightweight calcium silicate wall panel board
Kozlovská Modern methods of construction vs. construction waste
CN114592742B (en) T-shaped constructional column and ecological interior wall self-tapping screw block connection structure of assembled composite wallboard and manufacturing method
CN114809764B (en) Assembled T-shaped column and ecological interior wall self-tapping screw block connection structure and construction method
CN214884639U (en) Prefabricated light integral wallboard of cast-in-place shear wall prefabricated house
RU2812973C1 (en) Method of construction of buildings
BR102020026887A2 (en) EXPANDED POLYSTYRENE MONOLITHIC PANEL CONSTRUCTION SYSTEM
BR102022022581A2 (en) CONSTRUCTIVE SYSTEM OF EXPANDED POLYSTYRENE MONOLITHIC PANEL WITH INCLUSION OF DUCTS AND PIPES
CN207647026U (en) It is a kind of can Buried pipe drum armored concrete reversed beam
Rinku et al. Low cost housing
RU60552U1 (en) BUILDING SYSTEM
CN205276490U (en) Height is striden and low oblique roofing structure of stone shingle of striding
CN205296519U (en) Embedded prefabricated room of steel construction assembly house floor

Legal Events

Date Code Title Description
B03A Publication of a patent application or of a certificate of addition of invention [chapter 3.1 patent gazette]
B11A Dismissal acc. art.33 of ipl - examination not requested within 36 months of filing
B11Y Definitive dismissal - extension of time limit for request of examination expired [chapter 11.1.1 patent gazette]