[go: up one dir, main page]

BE664816A - - Google Patents

Info

Publication number
BE664816A
BE664816A BE664816DA BE664816A BE 664816 A BE664816 A BE 664816A BE 664816D A BE664816D A BE 664816DA BE 664816 A BE664816 A BE 664816A
Authority
BE
Belgium
Prior art keywords
indicator
arms
rod
foot
shaped
Prior art date
Application number
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Publication of BE664816A publication Critical patent/BE664816A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1808Holders for bricklayers' lines, bricklayers' bars; Sloping braces
    • E04G21/1833Line-holders for setting-out builders' work, e.g. foundations

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Binders And Loading Units For Sheaves (AREA)
  • Supports For Plants (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  ' ' La présente invention concerne un procédé de cons-   truction   et des dispositifs indicateurs et de marquage à   utili-   
 EMI1.1 
 sor :dars ce procédé et elle a une app..catinr: particulièrement   importante ,   mais non exolusive , dans la fabrication des maisons constituées de briques et/ou de blocs. 



   Suivant l'invention, dans un de ses aspects, on pré- voit un procédé pour marquer sur le sol les limites d'une   construction   à édifier, ce procédé comprenant les étapes qui consistent   à   marquer chaque point de l'édifice à construire au moyen d'un bloc qui porte   à   sa surface supérieure ou dans sa surface supérieure des moyens de mise en place pour rece- voir 'de façon amovible un guide ou autre dispositif.indica- teur et qui est décalé d'une certaine distance vers   l'extérieur '   du coin. Le dispositif de mise en   place   comprend de préfé-   rence   une embase dans la surface supérieure du bloc. Il est préférable que le bloc soit coulé in situ dans le sol. 



   Lorsque   les   niveaux des blocs diffèrent sur un sol   @   inégal ou en pente ,il est préférable que les niveaux   diffè-        . rent de multiples entiers de 1'épaisseur d'un cours ou lit normal de briques ou de blocs ,par exemple, ou autres élé- ments du matériau de construction. 



   Suivant une forme de réalisation préférée de   l'inven-   tion,le procédé comprend en outre l'étape consistant à faire coopérer par saillie et engagement dans l'embase du dispositif de 'mise en place de chaque coin ,un dispositif indicateur ,ayant des bras qui s'étendent parallèlement aux deux parois qui doivent former les coins du bâtiment. 

 <Desc/Clms Page number 2> 

 



   L'invention, prévoit aussi ,pour être utilise dans la coulée in   situ   du bloc dans le sol, un dispositif comprenant un élément ayant deux parties en forme de tiges qui partent de celui-ci en sens opposés l'un par rapport à l'autre , l'une de ces parties en forme de tiges étant confor- mée pour lui permettre   d'être   poussée dans   le-   sol par l'ex- trémité , cet élément étant d'une forme, au moins sur la partie de'sa longueur qui est la plus proche de la partie en forme-de tige, propre   à   permettre à cet élément de fournir un noyau pour un moule, et pour permettre à l'élément d'être retiré par le bout ,d'un article moulé autour de cette par- tie après que l'article ait fait prise,

   et la partie en forme de tige étant d'une forme qui   .r.mette   à la partie en forme de tige d'être retirée à travers l'article avec l'élément en   question.   



   L'invention prévoit en outre l'emploi,dans le procédé exposé dans l'avant-dernier paragraphe, d'un dispositif indicateur comprenant deux bras reliés ensemble et s'étendant l'un en sens transversal de l'autre , et une partie en moyeu formée à la jonction des bras ,cette partie comprenant une partie saillante ou présentant une embase pour une liaison par saillie et embase ,comme indiqué précédemment. 



   Dans un tel indicateur, les bras sent munis de chevilles   à   des distances choisies à l'avance du point de jonction des bras ,ces chevilles s'étendant en sens opposé par rapport à cette partie.Aux bras peuvent être fixés deux autres bras qui s'étendent parallèlement l'un à l'autre et qui font saillie chacun perpendiculairement au bras sur lequel il est monté. Dans un tel indicateur, chacun des autres bras possède des chevilles qui s'étendent latéralement à intervalles réguliers suivant la longueur, l'écartement des chevilles cor- respondant à l'épaisseur de chaque lit ou cours de briques ou blocs. 

 <Desc/Clms Page number 3> 

 



   L'invention prévoit encore la combinaison avec un indicateur tel que décrit ci-dessus d'une tige en forme de T ou de nivelette , comprenant une 'branche et une pièce trans- versale , l'indicateur et la partie extrême de la nivelette éloignée de la pièce transversale étant formés de façon que l'indicateur donne le moyen de mettre en place la nivelette. 



   On décrira maintenant l'invention avec plus de détails ,à titre d'exemple , en se référant aux dessins joints au présent mémoire dans lesquels : 
Figure 1 montre un dispositif de marquage à utiliser pour marquer des emplacements spécifiques. 



   Figure 2 montre un premier dispositif indicateur à utiliser dans le marquage des positions des assises'de fonda  tion et des lits ou cours de base de maçonnerie à cavités. 



   Figure 3 représente en plan la manière dont les in- dicateurs montrés à la figure 2 sont utilisés. 



   Figure 4 montre un second indicateur   à   utiliser dans la pose des briques. 



   Figure 5 montre un indicateur et une nivelette à utiliser pour marquer les positions des assises'de.fondation et des niveaux des fondations , et 
Figure 6 montre en perspective la façon dont l'ina- dicateur et les nivelettes sorit utilisés pour déterminer les niveaux des fondations. 



   En se reportant d'abord à la figure 1, on voit que le dispositif de marquage comprend une tige 10 et un élément conique 11 terminé à son sommet par un disque 12. Le disque présente un bossage 13 avec une vis de réglage 14 qui permet   à   l'élément conique et au disque   d'être   fixés en une posi- tion   quelconqu@   choisie sur la longueur de la tige 10. La tige 10 présente une pièce transversale 15 près de son extrémité supérieure. 

 <Desc/Clms Page number 4> 

 



   Pour marquer la position d'un bâtiment rectangulaire, par exemple, quatre de ces dispositifs de marquage seront utilisés , un pour chaque coin de l'édifice et ils seront 1 disposés de telle façon que les lignes imaginaires qui relient entre elles les dispositifs de marquage définissent un rectan- gle dont chaque coté est disposé extérieurement à une distan- ce de deux   :pieds   de la paroi correspondante de   l'édifice.   



  Ainsi, la distance entre deux éléments de chaque paire de dispositifs de marquage est d'une longueur supérieure de 4 pieds à la longueur de la paroi qui s'étend de façon générale entre les deux dispositifs. La hauteur de la tige se règle en la poussant plus ou moins dans le sol et en la retirant plus ou moins de   celui-ci ,  les pièces transversales 15 étant utilisées pour déterminer les niveaux nécessaires. 



   Lorsqu'on a décidé de la position approximative du dispositif de Marquage ,on fait un petit trou autour de la position ,trou qui peut avoir 'par exemple une profondeur de 9 pouces. On   me@     alors -en     lace   les dispositifs de marquage et la hauteur du disque 12 et l'élément conique,.12 se règlent au moyen de la vis de réglage 14 de telle façon que le disque 12 soit en. alignement avec le niveau général du sol. L'espace entre l'élément contenue 11 et les côtés et le fond du trou est alors rempli de béton 16 auquel on permettra de faire prise avant de retirer le dispositif de marquage. 



   Dans l'étape suivante de la construction, on place dans chacun des quatre blocs de béton un indicateur tel que celui que montre la figure 2. L'indicateur comprend une partie en moyeu conique 20 qui est conformé pour s'adapter dans le trou laissé dans le bloc de béton 16 par l'élément conique 11 du dispositif de marquage et qui possède deux bras s'étendant latéralement 21 disposés perpendiculairement l'un à l'autre. 

 <Desc/Clms Page number 5> 

 



   Dans la présente construction, chacun de ces bras a une longueur de 3 pieds et 8 pouces ,en mesurant à partir de l'axe de la partie èn moyeu et présente quatre chevilles 
22, 23, 24, 25 disposées respectivement à des distances de 
1 pied 6 pouces, 2 pieds, 2 pieds 11 pouces   et 3   pieds 5pouces de l'axe de la partie en forme de moyeu 20. 



   L'agencement des indicateurs dans les blocs 16 est tel que le montre la figure 3 ,les deux,bras 21 de chaque indicateur s'étendant respectivement parallèlement aux deux parois ou murs qui s'étendent à partir de l'indicateur. Des ficelles ou cordeaux 26, 27 sont alors posés pour s'étendre parallèlement aux quatre murs de l'édifice en utilisant les chevilles 22, 25 sur les bras , c'est-à-dire les chevilles qui sont respectivement la plus proche et la plus éloignée du moyeu. Ces ficelles indiquent les limites latérales de l'assise'de fondation ou soubassement en béton.

   Lorsque le bé- ton du soubassement a séché, les ficelles sont enlevées pour être mises dans la position indiquée par 28, 29 s'étendant entre la seconde et la troisième cheville 23, 24 des bras des indicateurs ,pour définir la position des lignes de bri- ques   correspondant à   une maçonnerie à cavités de 11 pouces. 



   Lorsque le premier lit ou cours de briques a été mis en place,' les indicateurs montrés à la figure 2 sont déplacés et rempla- cés par des guides ou indicateurs tels que ceux que montre la      figure 4. 



   L'indicateur montré à la figure 4 possède une partie en moyeu conique   30 ,  et deux bras horizontaux 31, 32 perpendiculaires l'un à l'autre ,comme les indicateurs montrés à la figure   3. Deux   bras verticaux 33, 34 sont fixés respecti- vement aux deux bras horizontaux 31, 32 et chacun des bras verticaux possède des chevilles 35 qui partent latéralement 

 <Desc/Clms Page number 6> 

 de ces bras à des intervalles de 3 pouces de leur longueur. 



   En supposant qu'un seul lit ou cours de briques ait été posé, t un cordeau ou ficelle est disposé entre les secondes chevilles à partir de la base des bras vertioaux ,comme indiqué   à   la figure 3, en sorte que les ficelles ou cordeaux s'étendent parallèlement aux murs.   Chaque   ficelle ou cordeau donne ainsi le niveau du lit de briques suivant. Lorsqu'on a posé chacun des lits de briques, on déplace vers le haut   jusqu'aux   che- villes suivantes les ficelles ou les cordeaux. On comprendra que pour des maçonneries de briques normales, les chevilles seront écartées de 3 pouces suivant la longueur des bras verti- caux. 



   La hauteur des bras verticaux peut être de 8 pieds en sorte de guider la construction jusqu'au niveau du premier plancher et on peut ajouter des rallonges si c'est nécessaire. 



   Des arceaux métalliques peuvent être enfoncés dans le sol pour être disposés par dessus les bras horizontaux des indi- cateurs lorsqu'il est nécessaire d'empêcher que ces   indi@a-     par @ teurs soient dérangés /accident.   



   La description qui précède se rapporte   à   un emplacement dont le sol est à un même niveau. 



   Dans les emplacements où le sol est irrégulier, les hauteurs des blocs 16 peuvent différer les unes par rapport aux autres. Par exemple, lorsque le site est en pe d'une extrémité de la construction proposée à l'autre, la hauteur des blocs l'un par rapport   à   l'autre   différera   de pouces ou de multiples de 3 pouces   lorsqu'on   réalise   ur-.   construction en briques normale, 3 pouces étant la hauteur occupée par chaquelit ou cours de briques normal .

   Comme il est peu économique que le dessus de la fondation de béton ait un niveau constant sur toute son étendue en un pareil emplacement, on échelonne le dessus de la fondation suivant   la:   

 <Desc/Clms Page number 7> 

 pratique ordinaire en considérant à nouveau des échelons de 3 pouces ou de multiples de 3 pouces pour diminuer autant que possible le creusement du sol. 



   Dans le présent procédé, les hauteurs de ces éche-   lons   peuvent être établies et vérifiées de façon exacte en se reportant aux;hauteurs des blocs   16.Dans   ce but, chaque bras 21 de chaque   indicateur   possède, entre ses chevilles 23 et 24t des moyens de mise en place de l'embase d'une nive- lette   40.Dans   le présent cas, le dispositif de mise en place comprend une glissière 41 et la nivelette possède une base 42 qui peut être fixée dans la glissière. La nivelette a un pied extensible télescopiquement 43 dont la partie inférieure est fixée à la base 42.

   La partie supérieure du pied est formée avec des trous 44 à des intervalles de 3 pouces sur sa   'longueur,   et un verrou libérable 45 sur la partie inférieure présente une saillie qui s'étend à travers un trou de la partie inférieure et qui vient en alignement avec l'un ou l'autre des trous 44 de la partie supérieure en sorte de pouvoir régler la longueur du pied par échelons de 3 pouces. 



   La pièce transversale 46 de la nivelette est montée de façon à pouvoir tourner sur le pied pour avoir un mouvement de pivotement autour de l'axe longitudinal du pied.La nivelette 
40 peut être utilisée sur l'un ou l'autre bras de l'indica-   teur.   



   On a prévu aussi une nivelette 50 (voir figure 4) qui a un pied extensible 51 semblable   à   celui de chaque nive- lette   40 ,  la partie inférieure du pied 51 étant montée sur un bloc ou talon 52. La longueur du pied 51 peut être réglée par échelons de 3 pouces. 



   Dans l'emploi de l'appareil, en sereportant à la figure 4, les blocs 16 se trouvent   à des   hauteurs différentes 

 <Desc/Clms Page number 8> 

 comme décrit précédemment suivant la nature de l'emplacement, les niveaux différant seulement de 3 pouces. Les nivelettes 
40 sont allongées en sorte que les pièces transversales de toutes les nivelettes 40 se trouvent au   mené   niveau et   dé-        finissent un plan horizontal.

   Ensuite, pour chaque étendue des fondations entre deux indicateurs, on utilise les ni- velettes 50 en association avec les nivelettes 40 des indi- cateurs pour régler et vérifier les niveaux des échelons. fouille du   'En   pratique, lorsque la/soubassement d'une section 54 entre deux échelons a été   creusée,section   qui sera par exemple de 
3 pouces plus élevée que la section 55 qui   s'étend   jusqu'au bloc 16, un piquet (non montré) sera enfoncé dans le sol dans la tranche pour la section 54, et une nivelette 50 réglée pour avoir une longueur de 3 pouces de moins que celle de la nivelette de gauche 40 montrée à la figure   4 ,  est posée sur le dessus du piquet.

   On enfonce le piquet dans le sol jusqu'à ce que les dessus aes trois nivelettes soient   exattement   dans un plan commun pour un observateur qui se trouve en aligne- ment avec les trois nivelettes. La nivelette 50 est alors enlevée et la section 54 est remplie de béton jusqu'au niveau du dessus du piquet. On peut utiliser plus d'un piquet si on le désire. On répète le processus pour chaque échelon, le ni- veau de chaque échelon étant vérifié directement par rapport aux niveaux établis par les nivelettes 40. 



   Comme la pièce transversale de chaque nivelette 40 peut tourner autour de l'axe longitudinal de son pied, les nivelettes 40 peuvent être utilisées aussi pour vérifier des niveaux en des points autres qu'entre des indicateurs voisins, par exemple dans le sens diagonal du site. On comprendra qu'au lieu d'avoir des montures à pivotement entre la pièce trans- versale et le pied de la nivelette 40,la nivelette tout   entiè-   re peut être capable de tourner par rapport à l'indicateur 

 <Desc/Clms Page number 9> 

 ou bien le pied peut comprendre des parties susceptibles de      tourner l'une par rapport à l'autre. 



   Après que le soubassement ait été construit comme décrit précédemment et que la maçonnerie ait été édifiée à un niveau commun entre les deux blocs formant ooin, les indi-   cateurs   montrés à la figure 4 peuvent être Utilisés comme précédemment. 



   On comprendra que l'emploi des dispositifs de mar- quage et des indicateurs tel que décrit ci-dessus permettra de poser la maçonnerie de façon précise en utilisant des maçons relativement peu exercés. 



   Il sera évident aussi que la liaison à embase et   à   saillie entre les indicateurs ou les dispositifs de marquage et les blocs de béton peut être inversée, c'est-à-dire que les blocs peuvent porter la saillie et que les indicateurs ou dispositifs de marquage peuvent porter les embases ,bien qu'un tel agencement soit moins commode que celui qui a été décrit   ci.dessus.   



   Le procédé a été décrit pour des maçonneries à ca-   vités   de 11 pouces ) c'est-à-dire pour des murs doubles construits chacun de briques de 9 pouces de longueur sur 41/2 pouces de largeur   et 2 -   pouces   d'épaisseur ,   avec une cavité d'une largeur de 2 pouces entre les deux parties du   mur ,  mais on comprendra que le procédé s'applique aussi bien à l'érection de bâtiments construits à partir de matériaux quelconques et à la construction d'édifices à partir de blocs de toutes dimensions normales prédéterminées.



   <Desc / Clms Page number 1>
 



  The present invention relates to a method of construction and to indicating and marking devices for use.
 EMI1.1
 sor: dars this process and it has an application..catinr: particularly important, but not exclusive, in the manufacture of houses made of bricks and / or blocks.



   According to the invention, in one of its aspects, there is provided a method for marking on the ground the limits of a building to be erected, this method comprising the steps of marking each point of the building to be constructed by means of of a block which carries on its upper surface or in its upper surface positioning means for removably receiving a guide or other indicating device and which is offset a certain distance towards the end. outside 'of the corner. The delivery device preferably comprises a base in the upper surface of the block. It is preferable that the block is cast in situ in the ground.



   When the levels of the blocks differ on uneven or sloping ground, it is preferable that the levels differ. rent integer multiples of the thickness of a normal course or bed of bricks or blocks, for example, or other elements of the building material.



   According to a preferred embodiment of the invention, the method further comprises the step of causing, by protrusion and engagement in the base of the device for positioning each wedge, to cooperate with an indicator device, having arms which extend parallel to the two walls which are to form the corners of the building.

 <Desc / Clms Page number 2>

 



   The invention also provides, for use in the in situ casting of the block in the ground, a device comprising an element having two rod-shaped parts which extend therefrom in opposite directions relative to one another. another, one of these rod-shaped parts being shaped to allow it to be pushed into the ground by the end, this element being of a shape, at least on the part of its length which is closest to the rod-shaped portion suitable for enabling that element to provide a core for a mold, and to allow the element to be removed from the tip, of an article molded around of this part after the article has taken,

   and the rod-shaped portion being of a shape which allows the rod-shaped portion to be pulled out through the article with the member in question.



   The invention further provides for the use, in the method described in the penultimate paragraph, of an indicating device comprising two arms connected together and extending one in transverse direction from the other, and a part in a hub formed at the junction of the arms, this part comprising a projecting part or having a base for a connection by projection and base, as indicated above.



   In such an indicator, the arms are provided with ankles at distances chosen in advance from the point of junction of the arms, these ankles extending in the opposite direction with respect to this part. To the arms can be attached two other arms which s 'extend parallel to each other and each project perpendicular to the arm on which it is mounted. In such an indicator, each of the other arms has pegs which extend laterally at regular intervals along the length, the spacing of the pegs corresponding to the thickness of each bed or yard of bricks or blocks.

 <Desc / Clms Page number 3>

 



   The invention also provides for the combination with an indicator as described above of a T-shaped or leveling rod, comprising a branch and a cross piece, the indicator and the end part of the remote level. of the transverse piece being formed so that the indicator provides the means to set up the level.



   The invention will now be described in more detail, by way of example, with reference to the drawings attached to this specification in which:
Figure 1 shows a marking device to be used to mark specific locations.



   Figure 2 shows a first indicating device for use in marking the positions of foundation courses and basic cavity masonry beds or courses.



   Figure 3 shows a plan of how the indicators shown in Figure 2 are used.



   Figure 4 shows a second indicator for use in laying bricks.



   Figure 5 shows an indicator and leveler to be used to mark the positions of foundation courses and foundation levels, and
Figure 6 shows in perspective how the indicator and levelers are used to determine foundation levels.



   Referring first to Figure 1, it can be seen that the marking device comprises a rod 10 and a conical element 11 terminated at its top by a disc 12. The disc has a boss 13 with an adjusting screw 14 which allows the conical member and the disc to be secured at any selected position along the length of the rod 10. The rod 10 has a cross member 15 near its upper end.

 <Desc / Clms Page number 4>

 



   To mark the position of a rectangular building, for example, four of these marking devices will be used, one for each corner of the building and they will be 1 arranged so that the imaginary lines that connect the marking devices to each other define a rectangle, each side of which is disposed externally at a distance of two: feet from the corresponding wall of the building.



  Thus, the distance between two elements of each pair of marking devices is 4 feet longer than the length of the wall which generally extends between the two devices. The height of the rod is adjusted by pushing it more or less into the ground and withdrawing it more or less from it, the cross pieces 15 being used to determine the necessary levels.



   When the approximate position of the Marking Device has been decided, a small hole is made around the position, which hole may be, for example, 9 inches deep. We @ then lace the marking devices and the height of the disc 12 and the conical element, .12 are adjusted by means of the adjusting screw 14 so that the disc 12 is in. alignment with the general level of the ground. The space between the contained element 11 and the sides and the bottom of the hole is then filled with concrete 16 which will be allowed to set before removing the marking device.



   In the next stage of construction, an indicator like the one shown in Figure 2 is placed in each of the four concrete blocks. The indicator includes a tapered hub portion 20 which is shaped to fit into the hole left. in the concrete block 16 by the conical element 11 of the marking device and which has two arms extending laterally 21 arranged perpendicular to one another.

 <Desc / Clms Page number 5>

 



   In the present construction, each of these arms is 3 feet 8 inches in length, measuring from the centerline of the hub portion and has four pegs.
22, 23, 24, 25 respectively arranged at distances of
1 foot 6 inches, 2 feet, 2 feet 11 inches, and 3 feet 5 inches from the axis of the hub-shaped portion 20.



   The arrangement of the indicators in the blocks 16 is as shown in Figure 3, the two arms 21 of each indicator respectively extending parallel to the two walls or walls which extend from the indicator. Twines or cords 26, 27 are then laid to extend parallel to the four walls of the building using the pegs 22, 25 on the arms, that is to say the pegs which are respectively the closest and the further from the hub. These strings indicate the lateral limits of the foundation course or concrete plinth.

   When the concrete of the bedrock has dried, the strings are removed to be put in the position indicated by 28, 29 extending between the second and the third peg 23, 24 of the indicator arms, to define the position of the control lines. bricks corresponding to 11 inch cavity masonry.



   When the first bed or course of bricks has been placed, the indicators shown in Figure 2 are moved and replaced by guides or indicators such as those shown in Figure 4.



   The indicator shown in Figure 4 has a conical hub portion 30, and two horizontal arms 31, 32 perpendicular to each other, like the indicators shown in Figure 3. Two vertical arms 33, 34 are attached respectively. - Event with two horizontal arms 31, 32 and each of the vertical arms has pegs 35 which go laterally

 <Desc / Clms Page number 6>

 of these arms at 3 inch intervals of their length.



   Assuming that only one bed or brick yard has been laid, a line or string is placed between the second pegs from the base of the vertical arms, as shown in Figure 3, so that the strings or lines are 'extend parallel to the walls. Each string or line thus gives the level of the next bed of bricks. When each of the brick beds has been laid, the strings or cords are moved upwards to the next anchors. It will be understood that for normal brick masonry, the anchors will be spaced 3 inches apart along the length of the vertical arms.



   The height of the vertical arms can be 8 feet to guide the construction to the level of the first floor and you can add extensions if necessary.



   Metal poles can be driven into the ground to be placed over the horizontal arms of the indicators when it is necessary to prevent these indicators from being disturbed / accidental.



   The above description relates to a location where the floor is at the same level.



   In locations where the ground is uneven, the heights of the blocks 16 may differ from each other. For example, when the site is at pe from one end of the proposed construction to the other, the height of the blocks relative to each other will differ by inches or multiples of 3 inches when performing ur- . normal brick construction, 3 inches being the height occupied by each regular brickwork or course.

   As it is uneconomical for the top of the concrete foundation to have a constant level over its entire extent in such a location, the top of the foundation is staggered according to:

 <Desc / Clms Page number 7>

 ordinary practice, again considering 3 inch rungs or multiples of 3 inches to reduce digging as much as possible.



   In the present method, the heights of these rungs can be established and verified exactly by referring to the heights of the blocks 16. For this purpose, each arm 21 of each indicator has, between its pegs 23 and 24t, means for placing the base of a level 40. In the present case, the positioning device comprises a slide 41 and the level has a base 42 which can be fixed in the slide. The level has a telescopically extendable foot 43, the lower part of which is fixed to the base 42.

   The upper portion of the foot is formed with holes 44 at 3 inch intervals along its length, and a releasable latch 45 on the lower portion has a protrusion which extends through a hole in the lower portion and comes in. alignment with one or the other of the holes 44 of the upper part so as to be able to adjust the length of the foot in steps of 3 inches.



   The transverse piece 46 of the leveler is mounted so as to be able to turn on the foot in order to have a pivoting movement about the longitudinal axis of the foot.
40 can be used on either arm of the indicator.



   Also provided is a level 50 (see Figure 4) which has an extensible foot 51 similar to that of each level 40, the lower part of the foot 51 being mounted on a block or heel 52. The length of the foot 51 can be varied. set in 3 inch steps.



   When using the device, referring to Figure 4, the blocks 16 are at different heights.

 <Desc / Clms Page number 8>

 as previously described depending on the nature of the location, the levels differing only by 3 inches. Levels
40 are elongated so that the transverse pieces of all the levels 40 are at the level led and define a horizontal plane.

   Then, for each extent of the foundation between two indicators, the levels 50 are used in association with the levels 40 of the indicators to adjust and verify the levels of the rungs. excavation of 'In practice, when the base of a section 54 between two rungs has been excavated, a section which will for example be
3 inches higher than section 55 which extends to block 16, a stake (not shown) will be driven into the ground in the slice for section 54, and a level 50 set to be 3 inches long. less than that of the left level 40 shown in FIG. 4, is placed on top of the stake.

   The stake is driven into the ground until the tops of the three levels are exactly in a common plane for an observer who is in alignment with the three levels. The level 50 is then removed and the section 54 is filled with concrete to the level of the top of the stake. More than one stake can be used if desired. The process is repeated for each rung, the level of each rung being checked directly against the levels established by the levels 40.



   As the transverse piece of each level 40 can rotate around the longitudinal axis of its foot, the levels 40 can also be used to check levels at points other than between neighboring indicators, for example in the diagonal direction of the site. . It will be understood that instead of having pivoting mounts between the crosspiece and the foot of the level 40, the entire level may be able to rotate relative to the indicator.

 <Desc / Clms Page number 9>

 or else the foot may include parts capable of rotating with respect to one another.



   After the basement has been constructed as previously described and the masonry has been erected to a common level between the two corner blocks, the indicators shown in Figure 4 can be used as before.



   It will be understood that the use of the marking devices and indicators as described above will allow the masonry to be laid accurately using relatively untrained masons.



   It will also be evident that the base and projection connection between the indicators or marking devices and the concrete blocks can be reversed, i.e. the blocks can bear the projection and that the indicators or devices of marking can carry the bases, although such an arrangement is less convenient than that which has been described above.



   The process has been described for masonry with 11 inch cavities) that is, for double walls each constructed of bricks 9 inches long by 41/2 inches wide and 2 - inches thick. , with a cavity of a width of 2 inches between the two parts of the wall, but it will be understood that the method applies both to the erection of buildings constructed from any material and to the construction of buildings from blocks of all predetermined normal dimensions.

 

Claims (1)

REVENDICATIONS.- 1.- Procédé pour marquer sur le sol les limites d'un édifice à construire, comprenant les étapes qui consistent à marquer chaque coin de l'édifice à construire au moyen d'un bloc qui présente sur ou dans sa surface supérieure des moyens de mise en place pour recevoir de façon amovible un guide ou autre indicateur et qui-est décalé d'une certaine distance à l'extérieur du coin. CLAIMS.- 1.- Method for marking the boundaries of a building to be constructed on the ground, comprising the steps of marking each corner of the building to be constructed by means of a block which has on or in its upper surface means of set up to removably receive a guide or other indicator and which is offset a certain distance outside the corner. 2. - Procédé suivant la revendication 1, dans lequel les moyens de mise en place comprennent une embase dans la surface supérieure du bloc. 2. - The method of claim 1, wherein the positioning means comprise a base in the upper surface of the block. 3.- Procédé suivant la revendication 1 ou la reven- dication 2 dans lequel on coule le bloc in situ dans le sol. 3. A method according to claim 1 or claim 2 wherein the block is cast in situ in the ground. 4.- Procédé suivant une quelconque des revendica- tions 1 à 3, dans lequel lorsque le sol est en pente ou inégal, les niveaux des blocs diffèrent de multiples entiers de l'épaisseur d'un lit oucours normal d'éléments du maté- riau de construction , par exemple de briques ou de blocs. 4. A method according to any one of claims 1 to 3, wherein when the ground is sloped or uneven, the levels of the blocks differ by integer multiples from the thickness of a normal bed or course of elements of the material. construction material, for example of bricks or blocks. 5.- Procédé suivant une quelconque des revendications 1 à 4, comprenant l'étape supplémentaire qui consiste à fair coopérer par saillie et embase avec les dispositifs de mise place à chaque coin , un indicateur ayant des bras qui s'é- tendent parallèlement aux deux murs qui doivent former les coins de l'édifice. 5. A method according to any one of claims 1 to 4, comprising the further step of making cooperate by projection and base with the positioning devices at each corner, an indicator having arms which extend parallel to the. two walls which must form the corners of the building. 6. - Dispositif à utiliser pour couler le bloc suivant le procédé revendiqué à la revendication 2, associ . à la revendication 3, ce dispositif comprenant un élément ayant deux parties en forme de tige qui s'¯étendent en ser opposés l'une par rapport à l'autre ,l'une des parties e@ forme de tige étant conformée pour lui permettre d'être poussée dans le sol par un bout,!'élément ayant une forme au moins au-dessus de la partie de sa longueur qui est la plus <Desc/Clms Page number 11> proche de la première partie en forme de tige, 6. - Device to be used for casting the block according to the method claimed in claim 2, associ. in claim 3, said device comprising an element having two rod-shaped parts which extend in opposing relation to each other, one of the rod-shaped parts being shaped to allow it to be pushed into the ground by one end, the element having a shape at least above the part of its length which is most <Desc / Clms Page number 11> close to the first rod-shaped part, pour permettre à l'élément de constituer un noyau pour un moule et pour permettre à l'élément d'être retiré par le bout à partir d'un article moulé autour de cette partie après que cet article ait fait prise , et la première partie en forme de tige étant d'u- , ne forme qui permette à cette partie en forme de tige d'être retirée à travers l'article avec l'élément . to allow the member to form a core for a mold and to allow the member to be tip-removed from an article molded around that part after that article has set, and the first part rod-shaped being of a shape which allows that rod-shaped portion to be pulled out through the article with the member. 7.- Dispositif suivant la revendication 6, dans le- quel les deux parties en forme de tige font corps 1'une avec l'autre et où l'élément peut coulisser le long de la tige et possède des moyens par lesquels l'élément peut être serré sur la tige en des positions choisies de l'élément le long de la tige. 7. Device according to claim 6, in which the two rod-shaped parts are integral with one another and in which the element can slide along the rod and has means by which the element. can be clamped onto the rod at selected member positions along the rod. 8.- Dispositif suivant la revendication 6 ou la re- vendication 7, dans lequel la partie donnant un noyau est conique en se rétrécissant vers l'une des parties en forme de tige. 8. A device according to claim 6 or claim 7, wherein the core portion is conical narrowing towards one of the rod-shaped portions. 9.- Indicateur à utiliser dans le procédé suivant la revendication 5, cet indicateur comprenant deux brasreliés ensemble et s'étendant transversalement l'un par rapport à l'autre ,et une partie en moyeu formée à la jonction des deux bras, cette partie présentant une saillie ou présentant une embase pour la liaison par saillie et embase.. 9. An indicator for use in the method according to claim 5, this indicator comprising two arms connected together and extending transversely with respect to one another, and a hub portion formed at the junction of the two arms, this part having a projection or having a base for the connection by projection and base. 10.- Indicateur suivant la revendication 9,dans lequel le moyeu fait saillie à angle droit par rapport au plan défini par les bras et résente une saillie propre à venir en coopération avec une embase et à se dégager de celle-ci. 10. Indicator according to claim 9, wherein the hub protrudes at right angles to the plane defined by the arms and has a clean projection to come into cooperation with a base and to be released therefrom. 11.- Indicateur suivant la revendication 9 ou la re- vendication 10, dans lequel les bras sont munis de chevilles à des distancer choisies à l'avance du point de jonction des bras ,ces chevilles s'étendant en direction opposée de cette partie. <Desc/Clms Page number 12> 11. An indicator according to claim 9 or claim 10, in which the arms are provided with pegs to be spaced apart from the point of junction of the arms, these pegs extending in the opposite direction of this part. <Desc / Clms Page number 12> 12.- Indicateur suivant l'une quelconque des reven- dications 9 à 11, dans lequel les bras portent, fixée à eux, deux autres bras qui s'étendent parallèlement l'un à l'autre et dont chacun fait saillie à angle droit par rapport au bras sur lequel il est monté. 12. Indicator according to any one of claims 9 to 11, in which the arms carry, fixed to them, two other arms which extend parallel to one another and each of which protrudes at right angles. relative to the arm on which it is mounted. 13.- Indicateur suivant la revendication 12, dans lequel chacun des autres bras possède des chevilles qui en partent latéralement à intervalles réguliers suivant leur longueur, l'écartement entre chevilles correspondent à l'é- paisseur de chaque cours ou lit de briques ou blocs. 13. Indicator according to claim 12, in which each of the other arms has pegs which leave laterally at regular intervals along their length, the spacing between pegs corresponding to the thickness of each course or bed of bricks or blocks. . 14.- Combinaison comprenant un indicateur ,comme revendiqué à la revendication 9 ou à la revendication 10 , avec une ni'-'dette en forme de T comprenant un pied et une pièce transversale, l'indicateur et la partie terminale du pied de la nivelette la plus écartée de la pièce transversale étant conformés en sorte que l'indicateur donne des moyens pour mettr.. en place la nivelette. 14. A combination comprising an indicator, as claimed in claim 9 or claim 10, with a T-shaped link comprising a foot and a cross piece, the indicator and the end portion of the foot of the. level farthest from the cross piece being shaped so that the indicator provides means to put in place the level. 15. - Combinaison suivant la revendication 14, dans laquelle le pied comprend des parties qui sont mobiles l'une par rapport à l'autre pour permettre l'extension et la con- traction du pied en longueur ,et des moyens étant prévus pour mettre en place de façon relative les différentes parties dans leura positions relatives choisies. 15. - Combination according to claim 14, wherein the foot comprises parts which are movable with respect to one another to allow the extension and the contraction of the foot in length, and means being provided to put in relative place the different parts in their chosen relative positions. 16.- Combinaison suivant la revendication 15, dans laquelle le pied peut être prolongé et contracté par éche- lons de trois pouces. 16. A combination according to claim 15, wherein the foot can be extended and contracted in three inch steps. 17.- Combinaison suivant l'une quelconque des re- vendications 14 à 16, dans laquelle la pièce transversale de la nivelette peut tourner par rapport à au moins une par - tie de son pied autour d'un axe qui s'étend dans ie sens longitudinal du pied. <Desc/Clms Page number 13> 17.- Combination according to any one of claims 14 to 16, in which the transverse part of the leveler can rotate with respect to at least part of its foot about an axis which extends in ie. longitudinal direction of the foot. <Desc / Clms Page number 13> 18. - Combinaison suivant l'une quelconque des revendications 14 à 17, dans laquelle la partie terminale du pied et de l'élément support, offre un procédé de marquage sur le sol des limites d'un édifice à construire,comprenant l'étape qui consiste à marquer chaque coin de l'édifice à construire avec un bloc qui possède à sa surface ou dans sa Surface supérieure des moyens de mise en place pour rece- voir de façon amovible un guide ou autre indicateur et qui est décalé d'une distance prédéterminée vers l'extérieur du coin. 18. - Combination according to any one of claims 14 to 17, wherein the end portion of the foot and of the support member, provides a method of marking on the ground the boundaries of a building to be constructed, comprising the step which consists in marking each corner of the building to be constructed with a block which has on its surface or in its upper surface means of installation for removably receiving a guide or other indicator and which is offset by a predetermined distance to the outside of the corner.
BE664816D 1964-06-02 1965-06-02 BE664816A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB2282864 1964-06-02
GB2930664 1964-07-17

Publications (1)

Publication Number Publication Date
BE664816A true BE664816A (en) 1965-10-01

Family

ID=26256135

Family Applications (1)

Application Number Title Priority Date Filing Date
BE664816D BE664816A (en) 1964-06-02 1965-06-02

Country Status (5)

Country Link
US (1) US3318004A (en)
BE (1) BE664816A (en)
ES (1) ES313709A1 (en)
FR (1) FR1452639A (en)
NL (1) NL6507013A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4095343A (en) * 1977-04-20 1978-06-20 Mcphail J C Building layout templates
US4651495A (en) * 1984-10-22 1987-03-24 Auto Leads, Inc. Block leveling and foundation making methods
FR2603876B1 (en) * 1986-09-11 1991-01-18 Otis Elevator Co PROCESS FOR THE INSTALLATION OF ELEVATOR DOORS
US4924579A (en) * 1988-05-24 1990-05-15 Carol Berendsen Layout system for construction foundation placement
GB2469031B (en) * 2009-03-30 2013-09-11 Deer Park Engineering Ltd Building construction device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1336004A (en) * 1919-08-11 1920-04-06 Henry J Victoria Building-stake
GB589049A (en) * 1944-08-01 1947-06-10 William Robertson Improvements in or relating to line holders for the use of bricklayers
GB710139A (en) * 1951-11-15 1954-06-09 Stanley Winslade Jordan Improvements in or relating to guides for use during building operations
US2872733A (en) * 1956-03-13 1959-02-10 Clarence W Chew Layout instrument
US3250009A (en) * 1964-01-07 1966-05-10 John A Oseka Line holder

Also Published As

Publication number Publication date
ES313709A1 (en) 1966-02-16
NL6507013A (en) 1965-12-03
US3318004A (en) 1967-05-09
FR1452639A (en) 1966-09-16

Similar Documents

Publication Publication Date Title
US7934351B2 (en) Method of constructing a block wall
CH682248A5 (en)
EP2642046B1 (en) Fencing system
KR101297832B1 (en) Angle controlling apparatus of retaining wall block and construction method thereof
CA2413011A1 (en) Railway track building process whereby a concrete slab roadbed is laid and track anchoring components are inserted into the slab roadbed
BE664816A (en)
EP3351705B1 (en) A swimming pool provided with a stand and a method for building same
EP2864552B1 (en) Anchoring device
EP1010817B1 (en) Foundation block
CH434335A (en) Method of construction of a passage under track and installation for the implementation of this method
BE1001360A3 (en) Deck semi-prefabricated.
CN112942468B (en) A construction method for jacking of open grooved pipelines
FR3016909A1 (en) METHOD FOR CONSTRUCTING A SELF-SUPPORTING STRUCTURE FOR A BASIN
EP0242497A1 (en) Tunnel construction process
FR2634236A1 (en) METHOD FOR REPAIRING A FOUNDATION COMPRISING DETERIORATED PILE HEADS, ESPECIALLY WOOD PILES
FR2839990A1 (en) Prefabricated Civil engineering structure for installing passage under rail track comprises portico with upper crosspiece connecting two vertical abutments extended by additional spans supported by cover plate on talus ridge
TWI313314B (en)
FR2746124A1 (en) Structural system e.g. for foundation near growing tree roots
US1637065A (en) Retaining-wall construction
FR2648841A1 (en) Underpinning method
EP3749810B1 (en) Foundation providing point bearing for a structure, and method for building such a foundation
KR101962173B1 (en) Construction method of underground structure wall
CA1149183A (en) Retaining wall system
FR3160527A1 (en) Photovoltaic energy production unit and its installation process
NL1025294C1 (en) Method is for installation of a greenhouse foundation for building columns and involves a base formation of a foundation beneath ground level