[go: up one dir, main page]

BE624459A - - Google Patents

Info

Publication number
BE624459A
BE624459A BE624459DA BE624459A BE 624459 A BE624459 A BE 624459A BE 624459D A BE624459D A BE 624459DA BE 624459 A BE624459 A BE 624459A
Authority
BE
Belgium
Prior art keywords
gas
turbine
installation
expansion
exhaust gas
Prior art date
Application number
Other languages
French (fr)
Publication of BE624459A publication Critical patent/BE624459A/fr

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C1/00Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid
    • F02C1/04Gas-turbine plants characterised by the use of hot gases or unheated pressurised gases, as the working fluid the working fluid being heated indirectly
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02CGAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
    • F02C6/00Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
    • F02C6/003Gas-turbine plants with heaters between turbine stages

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Control Of Turbines (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  Installation de turbine à   datent    de   gaie   
 EMI1.1 
 L'invention se rapporte à une installation ëotptrtatit une-turbine à détente de gaz, avec une   surchauffe     indépendante,   du gaz sous pression constante, précédant la détente et un 
 EMI1.2 
 préchauffage du gaz sous la Même pression, avant cette bu--gh4ut- fog au moyen du gaz d'échappement de la turbine  Ce type 4'1n. lallation est connu. Suivant l'invention, le rendement fcheff- #> j mi que et les possibilité de réglage de l'installation peuvent   être   améliorées de manière à obtenir une solution,   qui   du point de vue énergétique, ne peut pratiquement plus   être améliorée.   
 EMI1.3 
 



  Pour résoudre le problème énoncé 01wdt$su'J ou pré" pose suivant l'invention, de prévoir une surchauffe tuttilmé-' diaire entre les différents étages de la détente  Do cette m** j nier., l'augmentation d'entropie lors de la dotent* est stnti- blement plus importante. On peut prévoir une seule surchAuffe intermédiaire, mais plusieurs surchauffes conviennent terore Mieux, La ou les surchauffes intermédiaires   s'effectuent   en particulier sur la température   d'entrée   dans la turbine* 

 <Desc/Clms Page number 2> 

 
Plue il y a surchauffes   intermédiaires,   d'autant plus élevée est, pour une température   finals   constante de   sur    chauffe T1 (c'est-à-dire pour une même température   d'entré*   à la turbine)

   la température de début de chauffe du gas. Dans des installations suivant l'invention, on peut également  sui- vant la méthode connue, faire précéder le réchauffement du   @   gax par le gaz d'échappement de la turbine, d'une compression avec refroidissement intermédiaire.

   On peut   procéder &   un ou à plusieurs refroidissements   intermédiaires*   C'est en   particu-   lier le cas, quand cornas dans le procédé connu,   on   fait suivre le   réchauffement   du gaz par le gaz d'échappement de la turbin., du côté échappement, d'une transmission de la chaleur   résidu-     elle   de ce gaz d'échappement, à au moins un consommateur de chaleur indépendant de l'installation, par exemple à des corps de chauffe séparés. 



   Suivant   1' invention,   le rendement thermique de l'ins-   tallatitn   se rapproche très fort de celui du cycle   idéal # th =   1 - To/T1 ou TO est la température au début du préchauffage ou bien de la compression et T1 la température d'entrée dans la turbine, en supposant une variation de pression   isotherme.   



  Dans cas conditions, il faut signaler, que le cycle qui peut être   réalité   avec l'installation suivant   l'invention,   est   'qui-   valent au cycle de Carnet, quand l'échange de chaleur entre l'arrivée et la sortie   de*, la   chaleur se fait à 100%. Suivant l'invention, on est indépendant des conditions de pression, comme on peut le voir dans la formule donnant le rendement, indiquée plus haut. Quand la pression   d'entrée à   la turbine subit des fluctuations, la puissance de la turbine peut être maintenue constante, si par exemple, on fait varier la tempe" rature du gaz avant la turbine, par exemple par le réglage de la surenauffe indépendante signalée plus haut, ou en réglant la pression finale de compression. 



   L'installation suivant l'invention constitue en par- ticulier une installation avec turbine à détente du gax   de/la   

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 distribution z grande distance, avec détente du gaz de cette 
 EMI3.2 
 distribution à la pression du réseau d'utilisation. 
 EMI3.3 
 La figure 1 du dessin représente oohématiqu*4%nt un 
 EMI3.4 
 exemple de réalisation de l'installation suivant l'invention} 
 EMI3.5 
 la figure 2 montre le diagramme T - e du cycle corrèspcadans 
 EMI3.6 
 (diagramme température-entropie). 
 EMI3.7 
 De la canalisation de distribution 10, le Cas pasa<! par la canalisation 11 au préchauffer de gaz 12, qui est chauf- té par le gaz d'échappement de la turbine;

   le &I préchauffe est amené par la canalisation 13 dans Io réchuuffour de gaz 14t qui est chauffe indépendamment, par exeaple par combustion de gaz amené par la canalisation 20 - l'air a# combustion 'tant amené par la canalisation 21 "- le gaz ree<tauff9<pa8se  lors par la canalisation 15 dani 1f turbine a ga* 16< qui comporte quatre étages avec trois surchauffeurs intermédiaires 17 A, lue I,e gaz amené par la canalisation 20 peut provenir de la cana- lisation 10. Après détente à la pression ! it18at1(nJ 11 gaz passa - en tant que gaz d'écuappemeut .de la turbine  # par le 
 EMI3.8 
 préchauffeur 13, dans lequel il transmet ',{   chaleur au gaz 
 EMI3.9 
 pris sur la dérivation do la çaa1a.ti9 10.

   Le g s /d'éohap- penent du reohauffaur 14 peut servir gu precuffa.dfair de combustion du rechauffeur, < " 'S La figure 2 montre, comment 1. aa,pau8". la "ra. pérature TQ à Te en passant dans le précUauffeuj' 42e - chauffé au moyen du gaz d'échappement d* la turbine*, pu.1s 9011- ment le gaz passe de Tz A T dans le r6Qv.t't.w:- indépendant 14s puis est détendu dans la turbine & gag 16  vec trois sur- chauffes intermédiaire dans les isur chauffa or 6 17 à' 19. Après passage dans le préchn.utteur 12, le sa. d)6ch4pp-cment; sort à la température ±# -... 



  A



   <Desc / Clms Page number 1>
 



  Turbine installation in cheerful date
 EMI1.1
 The invention relates to an installation ëotptrtatit a gas expansion turbine, with independent superheating, gas under constant pressure, preceding the expansion and a
 EMI1.2
 preheating of the gas under the same pressure, before this bu - gh4ut- fog by means of the exhaust gas of the turbine This type 4'1n. the allation is known. According to the invention, the efficiency fcheff- #> j mi that and the possibility of adjusting the installation can be improved so as to obtain a solution which, from an energy point of view, can practically no longer be improved.
 EMI1.3
 



  In order to solve the problem stated in accordance with the invention, to provide a total overheating between the different stages of the expansion Do this m ** j deny. The increase in entropy during this time. The endowment * is stagnantly greater. A single intermediate superheat can be provided, but several superheats are suitable. Better still, The intermediate superheat (s) take place in particular on the inlet temperature in the turbine *

 <Desc / Clms Page number 2>

 
The greater the intermediate overheating, the higher is, for a constant final overheating temperature T1 (i.e. for the same inlet temperature * to the turbine)

   the gas heating start temperature. In plants according to the invention, it is also possible, according to the known method, to precede the heating of the @ gax by the exhaust gas from the turbine, by compression with intermediate cooling.

   One or more intercoolings can be carried out. This is in particular the case, when, in the known process, the heating of the gas is followed by the exhaust gas of the turbine., On the exhaust side, transmission of the waste heat from this exhaust gas to at least one heat consumer independent of the installation, for example to separate heating bodies.



   According to the invention, the thermal efficiency of the installation is very close to that of the ideal cycle # th = 1 - To / T1 where TO is the temperature at the start of preheating or of compression and T1 the temperature of entry into the turbine, assuming an isothermal pressure variation.



  Under certain conditions, it should be pointed out that the cycle which can be carried out with the installation according to the invention is' equivalent to the Carnet cycle, when the heat exchange between the inlet and the outlet of *, the heat is 100%. According to the invention, the pressure conditions are independent, as can be seen in the formula giving the yield, indicated above. When the inlet pressure to the turbine undergoes fluctuations, the power of the turbine can be kept constant, for example if the temperature of the gas is varied before the turbine, for example by the adjustment of the independent supercharger indicated. higher, or by adjusting the final compression pressure.



   The installation according to the invention constitutes in particular an installation with an expansion turbine of the gax de / la.

 <Desc / Clms Page number 3>

 
 EMI3.1
 long distance z distribution, with gas expansion of this
 EMI3.2
 distribution at the pressure of the user network.
 EMI3.3
 Figure 1 of the drawing represents oohematically * 4% nt a
 EMI3.4
 embodiment of the installation according to the invention}
 EMI3.5
 figure 2 shows the diagram T - e of the cycle corresponding to
 EMI3.6
 (temperature-entropy diagram).
 EMI3.7
 From distribution line 10, Cas pasa <! through line 11 to the gas preheater 12, which is heated by the exhaust gas from the turbine;

   the & I preheat is brought by line 13 in Io gas return 14t which is heated independently, for example by combustion of gas brought by line 20 - the combustion air 'supplied by line 21 "- the gas ree < tauff9 <pa8se during pipe 15 dani 1f turbine a ga * 16 <which has four stages with three intermediate superheaters 17 A, read I, the gas supplied by pipe 20 can come from pipe 10. After expansion to the pressure! it18at1 (nJ 11 gas passed - as exhaust gas from the turbine # through the
 EMI3.8
 preheater 13, in which it transmits', {heat to gas
 EMI3.9
 taken on the derivation of the caa1a.ti9 10.

   The reheater 14 s / eohap- penent can be used as the preheater combustion precuffa.dfair, <"'S Figure 2 shows, how 1. aa, pau8". the temperature TQ to Te passing through the precuauffeuj '42e - heated by means of the exhaust gas from the turbine *, pu.1s 9011- gas passes from Tz to T in the r6Qv.t't .w: - independent 14s then is relaxed in the turbine & gag 16 with three intermediate overheats in the isur chauffa or 6 17 to '19. After passing through the prechn.utteur 12, the sa.d) 6ch4pp-cment; comes out at temperature ± # -...



  AT


    

Claims (1)

EMI4.1 EMI4.1 REV EUD 1.0 ATI ON S 1.- Installation de turbine à détente de gaz, 'qui. pré, avant la détente d'un* réchauffeur indépendant, du gax sous pression constante et avant ce réchauffeur, d'un préchauffage du gaz à la même pression, au moyon du gaz d'échappement de la turbine, caractérisée en ce que la détente se fait avec des surchauffes intermédiaires 2. - Installation de turbine à détente de gaz ;suivant la revendication 1, caractérisée en ce que, suivant le procédé ) connu, le chauffage du gaz au moyen du gaz d'échappement de la turbine est précédé d'une compression avec refroidissement in- EMI4.2 termédiaire. REV EUD 1.0 ATI ON S 1.- Installation of gas expansion turbine, 'which. pre, before the expansion of an * independent heater, of the gas under constant pressure and before this heater, of a preheating of the gas to the same pressure, by means of the exhaust gas from the turbine, characterized in that the expansion is done with intermediate overheating 2. - Gas expansion turbine installation; according to claim 1, characterized in that, according to the known method), the heating of the gas by means of the exhaust gas from the turbine is preceded by compression with cooling in - EMI4.2 intermediate. 3.- Installation de turbine à détente de gaz suivant la revendication 2, caractérisée en ce que, suivant le procédé connu, le chauffage du gaz au moyen du gaz d'échappement de la turbine, est suivi, du coté échappement, par une transmission EMI4.3 de la chaleur résiduelle de ce gaz d'échappement à au Moine un consommateur de chaleur indépendant de l'installation, par exemple à des corps de chauffe. 3.- Gas expansion turbine installation according to claim 2, characterized in that, according to the known method, the heating of the gas by means of the exhaust gas from the turbine is followed, on the exhaust side, by a transmission EMI4.3 of the residual heat from this exhaust gas to au Moine a heat consumer independent of the installation, for example to heating units.
BE624459D BE624459A (en)

Publications (1)

Publication Number Publication Date
BE624459A true BE624459A (en)

Family

ID=196123

Family Applications (1)

Application Number Title Priority Date Filing Date
BE624459D BE624459A (en)

Country Status (1)

Country Link
BE (1) BE624459A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0596143A4 (en) * 1992-05-25 1994-12-07 Aktsionernoe Obschestvo Kryoko Gas-distributing station with energetic installation.
WO1999004170A1 (en) * 1997-07-14 1999-01-28 Ge Energy Products Germany Gmbh Gas turbine and method for operating the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0596143A4 (en) * 1992-05-25 1994-12-07 Aktsionernoe Obschestvo Kryoko Gas-distributing station with energetic installation.
WO1999004170A1 (en) * 1997-07-14 1999-01-28 Ge Energy Products Germany Gmbh Gas turbine and method for operating the same
WO1999004169A1 (en) * 1997-07-14 1999-01-28 Ge Energy Products Germany Gmbh Method and device for compressing an industrial gas

Similar Documents

Publication Publication Date Title
Wu et al. Constructal thermodynamic optimization for ocean thermal energy conversion system with dual-pressure organic Rankine cycle
US6393822B2 (en) Cooling steam supply method of a combined cycle power generation plant
CA1331522C (en) Apparatus and method for optimizing the air inlet temperature of gas turbines
US4753068A (en) Gas turbine cycle incorporating simultaneous, parallel, dual-mode heat recovery
JPS6388227A (en) Method of operating gas turbine unit
JPH0388902A (en) Gas.steam turbine complex equipment with coal-gasification apparatus
WO2011082949A3 (en) Combined cycle power plant and method of operating such power plant
Zaversky et al. The challenge of solar powered combined cycles–Providing dispatchability and increasing efficiency by integrating the open volumetric air receiver technology
FR2973073A1 (en) COMBINED CYCLE POWER PLANT
Duan et al. Study on the integration characteristics of a novel integrated solar combined cycle system
BE624459A (en)
US4057966A (en) Steam-gas power plant
RU94020620A (en) METHOD FOR REGULATING THE HEAT OF STEAM IN STEAM-GAS CYCLES
GB2484254A (en) Gas turbine apparatus with energy recovery heat exchange system
CN109538355B (en) Combined cycle power generation equipment with tower solar heating compressor inlet air
CN109139400A (en) Change the solar heat complementation combined cycle system for changing intergration model based on irradiation
RU2163684C1 (en) Off-line heat-and-power cogeneration plant
EP0101372A1 (en) Method and system with thermodynamic cycle for energy production
SU1603038A1 (en) Steam-gas turbine plant
RU2849915C1 (en) Gas turbine installation with regenerator
DE102004042048A1 (en) Thermo dynamic closed loop for e.g. steam turbine, has heat exchangers and compression piston, where loop is filled with gaseous medium and thermal energy is converted into kinetic energy by supplying heat in expansion of medium
US2499108A (en) Arrangement for the utilization of turbine exhaust gases in steam generators and air preheaters
RU2326247C1 (en) Method of combined cycle power plant operation with closed circuit of gas circulation
RU2196907C2 (en) Electric energy generating device
BE484251A (en)