[go: up one dir, main page]

AU2019264625B2 - Dowel sleeve - Google Patents

Dowel sleeve Download PDF

Info

Publication number
AU2019264625B2
AU2019264625B2 AU2019264625A AU2019264625A AU2019264625B2 AU 2019264625 B2 AU2019264625 B2 AU 2019264625B2 AU 2019264625 A AU2019264625 A AU 2019264625A AU 2019264625 A AU2019264625 A AU 2019264625A AU 2019264625 B2 AU2019264625 B2 AU 2019264625B2
Authority
AU
Australia
Prior art keywords
sleeve
formwork
dowel
flange
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
AU2019264625A
Other versions
AU2019264625A1 (en
Inventor
Greg Stephen MASON
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Illinois Tool Works Inc
Original Assignee
Illinois Tool Works Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2018904421A external-priority patent/AU2018904421A0/en
Application filed by Illinois Tool Works Inc filed Critical Illinois Tool Works Inc
Priority to GB2106799.6A priority Critical patent/GB2593100B/en
Priority to PCT/US2019/061727 priority patent/WO2020106572A1/en
Publication of AU2019264625A1 publication Critical patent/AU2019264625A1/en
Application granted granted Critical
Publication of AU2019264625B2 publication Critical patent/AU2019264625B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/10Packing of plastic or elastic materials, e.g. wood, resin
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/10Packing of plastic or elastic materials, e.g. wood, resin
    • E01C11/106Joints with only prefabricated packing; Packings therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • E01C11/04Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
    • E01C11/14Dowel assembly ; Design or construction of reinforcements in the area of joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/48Dowels, i.e. members adapted to penetrate the surfaces of two parts and to take the shear stresses
    • E04B1/483Shear dowels to be embedded in concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/20Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups of material other than metal or with only additional metal parts, e.g. concrete or plastics spacers with metal binding wires

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

#$%^&*AU2019264625B220250626.pdf##### C:\Interwovn\NRPortbl\DCC\TXB\19537744 l.docx-l4/l/2019 ABSTRACT A sleeve for a dowel, wherein the sleeve is adapted to clip on to formwork through which the dowel is inserted. The sleeve may include a flange for abutting against the formwork, a sleeve portion extending from the flange, an upper rib supporting the sleeve portion relative to the flange and a lower rib supporting the sleeve portion relative to the flange. C:\Interwoven\NRPortbl\DCC\TXB\19537744_L.docx-14/11/2019 2019264625 14 Nov 2019 ABSTRACT A sleeve for a dowel, wherein the sleeve is adapted to clip on to formwork through which the dowel is inserted. The sleeve may include a flange for abutting against the formwork, a sleeve portion extending from the flange, an upper rib supporting the sleeve portion relative to the flange and a lower rib supporting the sleeve portion relative to the flange. C:\Interwoven\NRPortbl\DCC\TXB\19537744_L.docx-14/11/2019 2019264625 14 Nov 2019 ABSTRACT A sleeve for a dowel, wherein the sleeve is adapted to clip on to formwork through which the dowel is inserted. The sleeve may include a flange for abutting against the formwork, a sleeve portion extending from the flange, an upper rib supporting the sleeve portion relative to the flange and a lower rib supporting the sleeve portion relative to the flange. FIG. 11 6/16 FIG. 10 56 58 68 68 60 62 70 74 58 72 56 60 20 20 19 26 46 25 1 4 N ov 2 01 9 60 20 D D D 68 56 D I V 56 60 S 62 D D FIG. 10 4 6/16 D FIG. 11 4 4 I V 4 D D 70 72 58 58 4 D D D 68 4 4 74 D. 1 4 D D 2019264625 14 Nov 2019 60 20 D D D 68 56 D I V 56 60 S 62 D D FIG. 10 4 6/16 D FIG. 11 4 4 I V 4 D D 70 72 58 58 4 D D D 68 4 4 74 D. 1 4 D D 2019264625 14 Nov 2019

Description

6/16 6/16 14 Nov 2019 2019264625 14 Nov 2019
56 56
70 70
72 2019264625
72
74 74
58 58 60 60 20 20
FIG. FIG. 10 10
56 56
68 68 68 68
1 62 62 V 60V 60 D D D 4 58 58 4 D
D D D D 4 I D
D D I 4 D 4 D
D.
4 4 D 4 S
FIG. FIG. 11
2019264625 22 May 2025
-1- - 1 -
DOWEL SLEEVE DOWEL SLEEVE
Field of the Field of the Invention Invention
55 Thepresent The present invention inventionrelates relates to to aa formwork system formwork system and, and, more more specifically,butbutnotnot specifically, 2019264625
exclusively, to exclusively, to aa formwork formworksystem system for for forming forming concrete concrete panels panels of a pathway, of a pathway, footpath, footpath,
sidewalk sidewalk oror thelike. the like.
Background Background totothe the Invention Invention 10 10
It is known to use a plastic concrete shuttering system for forming concrete slabs or It is known to use a plastic concrete shuttering system for forming concrete slabs or
panels, such as in a pathway, footpath, side wall or the like. In particular, there is a concrete panels, such as in a pathway, footpath, side wall or the like. In particular, there is a concrete
formworksystem formwork system available available under under the the trade trade markmark "K-Form" "K-Form" which provides which provides screed screed rails rails having aacross-sectional having cross-sectional shape shapegenerally generallyofofan an inverted inverted T. T. However, However, the applicant the applicant has has 15 15 identifiedthat identified thatexisting existing formwork formworksystems systems useuse metallic metallic dowels dowels which which are are prone prone to corrosion. to corrosion.
The corrosion can lead to failure of the dowels resulting in adjacent panels no longer being The corrosion can lead to failure of the dowels resulting in adjacent panels no longer being
kept level, kept level, or or at atleast leastinin deterioration of of deterioration appearance appearancewhere where the the corrosion corrosion becomes visible. becomes visible.
Furthermore, the applicant has identified that it would be desirable for there to be provided Furthermore, the applicant has identified that it would be desirable for there to be provided
a formwork a system formwork system with with improved improved cost-effectiveness. cost-effectiveness.
20 20 Examplesofofthe Examples thepresent presentinvention inventionseek seektotoavoid avoidororatatleast least ameliorate ameliorate one oneorormore more disadvantagesof disadvantages of existing existing concrete concrete formwork systems. formwork systems.
Summary Summary ofofthe theInvention Invention 25 25 In accordance with one aspect of the present invention, there is provided a sleeve for a dowel, In accordance with one aspect of the present invention, there is provided a sleeve for a dowel,
whereinthe wherein the sleeve sleeve is is adapted adapted to to clip clip on to formwork on to throughwhich formwork through which thethe dowel dowel is inserted, is inserted,
whereinthe wherein thesleeve sleeveincludes includesa aflange flangefor forabutting abuttingagainst againstthe theformwork, formwork, a sleeve a sleeve portion portion
extending from the flange, an upper rib supporting the sleeve portion relative to the flange extending from the flange, an upper rib supporting the sleeve portion relative to the flange
30 30 andand a lower a lower ribrib supporting supporting thethe sleeve sleeve portion portion relativetotothe relative theflange, flange,and andwherein whereinthetheflange flange includes an upper includes an upper flange flange portion portion for for engagement engagementwith with an an upper upper railofofthe rail theformwork formworkandand a a
lower flangeportion lower flange portion having having resilient resilient clipsclips for clipping for clipping behindbehind a lower arail lower railformwork. of the of the formwork.
2019264625 22 May 2025
-2- -2-
Preferably, the Preferably, the sleeve sleeve includes includes aa flange flange for forabutting abuttingagainst againstthe theformwork, formwork, a a sleeve sleeve
portion extending from the flange, an upper rib supporting the sleeve portion relative to the portion extending from the flange, an upper rib supporting the sleeve portion relative to the
flange anda alower flange and lower ribrib supporting supporting the sleeve the sleeve portion portion relative relative to the to the flange. flange. More preferably, More preferably,
the flange the flange includes includesananupper upper flange flange portion portion for for engagement engagement with with an an rail upper upper of rail the of the 55 formwork formwork and and a lower a lower flange flange portion portion having having resilient resilient clips clips forfor clipping clipping behind behind a lower a lower railrail 2019264625
of of the the formwork. formwork.
Even more Even more preferably, preferably, thethe sleeve sleeve includes includes surrounds surrounds aroundaround the resilient the resilient clips clips
preventing dislodgement preventing dislodgementofofthe theupper upperflange flangeportion portionfrom fromthe theupper upperrail rail of of the the formwork. formwork.
10 10 Preferably, the Preferably, the sleeve sleeve includes includes crushable crushable internal internallateral lateralmovement voids located movement voids located at at opposed sides opposed sides of of a cavity a cavity for for receiving receiving the dowel. the dowel.
Preferably, the sleeve includes an expansion void. Preferably, the sleeve includes an expansion void.
15 15 Preferably, the Preferably, the sleeve sleeve portion portion includes internal ribs includes internal ribs which provide interference which provide interference on on insertion ofthe insertion of thedowel. dowel.
In a preferred In a preferred form, form, the the sleeve sleeve includes includescentering centeringribs ribswhich, which,when when the the sleeve sleeve is is
20 clipped 20 clipped on on to to thethe formwork, formwork, protrude protrude into into a dowel a dowel slot slot of formwork of the the formwork to prevent to prevent lateral lateral
misalignment of the sleeve and the slot. misalignment of the sleeve and the slot.
In accordancewith In accordance withanother another aspect aspect of the of the present present invention, invention, there there is provided is provided a a concrete footpath formwork concrete footpath formwork system system including including a sideform a sideform for forming for forming adjacent adjacent concrete concrete
25 panels 25 panels of of a footpath, a footpath, a dowel a dowel adapted adapted to extend to extend through through the sideform the sideform for transferring for transferring loadload
betweenthe between theadjacent adjacentconcrete concretepanels, panels,andand a sleeve a sleeve forfor receiving receiving thethe dowel, dowel, wherein wherein the the sleeve is adapted sleeve is adaptedtotoclip cliponon to to thethe sideform. sideform.
There is also disclosed a dowel for controlling relative level between adjacent panels, There is also disclosed a dowel for controlling relative level between adjacent panels,
30 wherein 30 wherein thethe dowel dowel is formed is formed of corrosion-free of corrosion-free material material so so asas totoavoid avoidcorrosion corrosionofofthe the dowel. dowel.
Preferably, the adjacent panels are concrete panels. Preferably, the adjacent panels are concrete panels.
Preferably, the dowel is formed of material which is non-metallic. Preferably, the dowel is formed of material which is non-metallic.
35 35 Preferably, the Preferably, the dowel is formed dowel is of aa polymer formed of material. polymer material.
2019264625 22 May 2025
-3- -3-
Preferably, wherein the dowel is formed of a plastic material. Preferably, wherein the dowel is formed of a plastic material.
In In one form, the one form, the dowel dowelisis formed formedofofa ametal metalmaterial materialportion portioncovered coveredinin a a polymer polymer
55 material material portion.More portion. More preferably, preferably, thethe polymer polymer material material portion portion seals seals within within itselfthe itself the metal metal material portion in an air-tight seal. 2019264625
material portion in an air-tight seal.
Preferably, the Preferably, the dowel is formed dowel is frommaterial formed from materialtotoavoid avoidcorrosion corrosionfrom fromoxidation oxidationofof the dowel. the dowel.
10 10 Preferably, the Preferably, the dowel is substantially dowel is substantially planar. planar. More preferably,the More preferably, thedowel dowelisisininthe the form form ofofa aplate. plate.
Preferably, opposed Preferably, edgesofof the opposed edges the dowel dowelare are tapered tapered inwardly inwardlytoward towarda acentral central axis axis of of
15 15 thethe dowel, dowel, thethe centralaxis central axislying lyingwithin withina aplane planeofofthe thedowel. dowel.More More preferably, preferably, tapering tapering of of
said said opposed edgesofofthetheplate opposed edges platedowel dowel is is configured configured to allow, to allow, in situ, in situ, lateralmovement lateral movement between the adjacent concrete panels once the panels contract during drying of the concrete. between the adjacent concrete panels once the panels contract during drying of the concrete.
In aa preferred In preferred form, form, the the dowel has aa cross-ribbed dowel has cross-ribbed structure structure on on an upper surface an upper surface and and 20 on a lower surface to increase structural rigidity. 20 on a lower surface to increase structural rigidity.
Preferably, Preferably, the the dowel dowel has has rounded corners. More rounded corners. Morepreferably, preferably,the the rounded roundedcorners cornersare are radiused. radiused.
25 25 Preferably, the Preferably, the dowel hasrounded dowel has roundededges. edges.More More preferably, preferably, the the rounded rounded edgesedges are are radiused. radiused.
Preferably, the Preferably, the dowel dowel has has a a flange flange arranged arranged to toabut abutagainst againsta a sideform sideformthrough throughwhich which
the dowel the is inserted. dowel is inserted. More Morepreferably, preferably,the theflange flangeextends extendsinina aplane planeperpendicular perpendiculartotothe the 30 plane 30 plane of of thethe plate plate dowel. dowel. EvenEven more more preferably, preferably, the flange the flange is adapted is adapted to against to seal seal against the the
sideform sideform soso as as to to prevent prevent ingress ingress of concrete of concrete to a joint to a joint between between adjacentadjacent concrete concrete panels. panels.
In a preferred form, the dowel is adapted for use in a non-industrial application. In a preferred form, the dowel is adapted for use in a non-industrial application.
35 35 It is preferred that the dowel is adapted for being cast into a concrete footpath so as It is preferred that the dowel is adapted for being cast into a concrete footpath so as
to transfer load between adjacent concrete panels of the footpath. to transfer load between adjacent concrete panels of the footpath.
There is There is also also disclosed disclosed aa concrete footpath formwork concrete footpath formworksystem system including including a dowel a dowel for for
- 44 -
transferring transferring load betweenadjacent adjacent concrete panels, wherein the dowel is a asdowel as 2019264625 22 May
load between concrete panels, wherein the dowel is a dowel
described above. described above.
There is There is also also disclosed a concrete disclosed a footpath formwork concrete footpath formwork system system including including a sideform a sideform
55 forfor forming forming adjacent adjacent concrete concrete panels panels of aoffootpath a footpath andand a dowel a dowel adapted adapted to extend to extend through through 2019264625
the sideform the for transferring sideform for transferring load load between the adjacent between the adjacent concrete concrete panels, panels, wherein the dowel wherein the dowel is is aadowel dowel as as described described above. above.
Preferably, the sideform is formed as a unitary panel having one or more ribs between Preferably, the sideform is formed as a unitary panel having one or more ribs between
10 opposed 10 opposed faces faces to to facilitatecrushing facilitate crushingofofthe the sideform sideforminin response responseto to expansion expansionofofthe the concrete concrete panels. panels.
Morepreferably, More preferably,the thesideform sideformpanel panelisissubstantially substantially planar planar and andarranged arrangedtotoextend extend perpendicular to a surface of the footpath. perpendicular to a surface of the footpath.
15 15 There is There is also also disclosed disclosed an an articulating articulatingdowel dowel system, system, including including aa dowel dowel and a dowel and a dowel
sleeve, sleeve, wherein the dowel wherein the dowelincludes includesa cam a cam portion portion located located within within the the sleeve sleeve to allow to allow the the
dowel dowel toto pivot pivot relative relative to to thethe dowel dowel sleeve. sleeve.
20 20 Preferably, the Preferably, the cam portion has cam portion has aa forward forwardrounded rounded parttotofacilitate part facilitate pivoting of the pivoting of the
dowel relative to dowel relative to the the dowel sleeve, and dowel sleeve, andaarearward rearwardtapered taperedpart partextending extending rearwardly rearwardly andand
tapering inwardly tapering fromthe inwardly from therounded roundedpart parttotolimit limit pivotal pivotal movement movement of of thedowel the dowel relativetoto relative
the dowel sleeve. More preferably, the rounded part and the tapered part define a pivot with the dowel sleeve. More preferably, the rounded part and the tapered part define a pivot with
upper and upper and lower lowerstops stops to to allow limited upward allow limited anddownward upward and downward pivoting pivoting of the of the dowel dowel relative relative
25 to to 25 thedowel the dowel sleeve. sleeve.
Preferably, the Preferably, the dowel is formed dowel is fromcorrosion-free formed from corrosion-free material. material.
In a preferred form, the sleeve is adapted to clip on to a sideform for forming adjacent In a preferred form, the sleeve is adapted to clip on to a sideform for forming adjacent
30 30 concretepanels. concrete panels.
There is There is also also disclosed a concrete disclosed a footpath formwork concrete footpath formwork system system including including a sideform a sideform
for for forming adjacent concrete forming adjacent concretepanels panelsofofaa footpath, footpath, aa dowel doweladapted adaptedtotoextend extendthrough through thethe
sideform fortransferring sideform for transferring load loadbetween between the the adjacent adjacent concrete concrete panels, panels, and aand a sleeve sleeve for for 35 receiving 35 receiving thethe dowel, dowel, wherein wherein the the dowel dowel is arranged is arranged to pivot to pivot upwardly upwardly and/orand/or downwardly downwardly
relative to the sleeve. relative to the sleeve.
2019264625 22 May 2025
-5- -5-
Preferably, the Preferably, the concrete concrete footpath footpathformwork formwork system system includes includes a seala fitted seal fitted to to the the sideform, whereinthe sideform, wherein theseal seal has has an an aperture aperture through through which whicha atongue tongueofofthe thedowel dowelinininserted inserted such that the such that the seal seal operates operates to to seal seal between betweenthe thedowel dowelandand the the sideform sideform against against concrete concrete
55 ingress. ingress. 2019264625
There is also There is also disclosed disclosedaaformwork formwork panel panel for for forming forming adjacent adjacent concrete concrete bodies, bodies,
whereinthe wherein theformwork formwork panel panel is adapted is adapted to compressible to be be compressible on expansion on expansion of the of the concrete concrete
bodies. bodies.
10 10 Preferably, the Preferably, the formwork formwork panel panel is substantially is substantially planar. planar. More preferably, More preferably, the the formwork panel formwork panel is substantially is substantially planar planar to be to inbe in a plane a plane substantially substantially perpendicular perpendicular to a travel to a travel
surface surface formed byupper formed by uppersurfaces surfacesofofthe the concrete concrete bodies. bodies.
15 15 In In aa preferred preferred form, form, the theformwork panelis formwork panel is extruded. extruded.
Preferably, the formwork panel has at least one internal void to facilitate sacrificial Preferably, the formwork panel has at least one internal void to facilitate sacrificial
compressionofofthe compression theformwork formwork panel panel on on expansion expansion of the of the concrete concrete bodies. bodies.
20 20 Preferably, Preferably, the the formwork panelhas formwork panel hasa apair pairofofopposed opposedsideform sideform walls walls connected connected by by
at at least least one sacrificial rib one sacrificial rib defining definingananinternal internal void void between between the opposed the opposed sideformsideform walls. walls.
Preferably, the formwork panel has a pair of opposed rails along at least one side of Preferably, the formwork panel has a pair of opposed rails along at least one side of
the formwork the formworkpanel, panel,thethe opposed opposed rails rails defining defining a channel a channel for slideable for slideable mounting mounting of an of an 25 accessory 25 accessory to to thethe formwork formwork panel. panel. MoreMore preferably, preferably, the channel the channel enables enables the formwork the formwork panel panel to be connected to another like formwork panel by inserting one end of a joiner plate in the to be connected to another like formwork panel by inserting one end of a joiner plate in the
channel the formwork panel and an opposite end of the joiner plate in the channel of the like channel the formwork panel and an opposite end of the joiner plate in the channel of the like
formworkpanel. formwork panel.
30 30 Preferably, the Preferably, the formwork panelhas formwork panel hasaaconstant constantcross-sectional cross-sectional shape shape along alongits its length length
and is able and is abletotobebecut cuttotolength length accordingly. accordingly.
Preferably, the Preferably, the formwork panelhas formwork panel hasananupper uppercapping, capping,thethecapping capping having having sidewalls sidewalls
and and aatop topsurface surfacearranged arranged tolevel to be be level with with upper upper surfaces surfaces of the concrete of the concrete bodies. bodies.
35 35 There is There is also also disclosed disclosed aa formwork panelfor formwork panel forforming formingadjacent adjacentconcrete concrete bodies,thethe bodies,
formworkpanel formwork panelhaving having a formwork a formwork panel panel bodybody and aand a formwork formwork panel capping panel capping arranged arranged to to
2019264625 22 May 2025
-6- - 6
be selectively be selectively moved from moved from a coupled a coupled condition condition in which in which the formwork the formwork panel capping panel capping is is coupled toto the coupled the formwork formwork panel panel bodybody to form to form a surface a surface level level with upper with upper surfaces surfaces of the of the concrete bodies and concrete bodies anda adecoupled decoupled condition condition in which in which at least at least partpart of the of the formwork formwork panelpanel
capping isis decoupled capping decoupledfrom from thethe formwork formwork panelpanel body body so so form as to as toa form a well the well between between the 55 concretebodies. concrete bodies. 2019264625
Preferably, the Preferably, the well well has has aapredetermined depth. predetermined depth.
Preferably, the Preferably, the formwork capping formwork capping is is formed formed with with a frangible a frangible part part which which is torn is torn to to 10 move 10 move the the formwork formwork panel panel capping capping from from the the coupled coupled condition condition to the decoupled to the decoupled condition. condition.
More preferably, the frangible part is located between an upper portion of the capping and a More preferably, the frangible part is located between an upper portion of the capping and a
lower portion lower portion of of thethe capping capping such such that tearing that tearing the frangible the frangible part separates part separates the upperthe upper portion portion
of of the the capping capping from the lower from the lower portion portion of of the the capping. capping.
15 15 Preferably, the Preferably, the capping includes opposed capping includes opposedarms arms extending extending laterally laterally outwardly outwardly from from
opposite sidesofofthethecapping opposite sides capping suchsuch that that distal distal ends ends of theof theare arms arms are embedded embedded in the concrete in the concrete
bodies. More bodies. More preferably, preferably, each each of the of the distal distal endsends hasenlarged has an an enlarged portionportion to facilitate to facilitate
retainment in the concrete. retainment in the concrete.
20 20 In one In one form, form,the theopposed opposed arms arms extend extend outwardly outwardly from from the the portion lower lower portion of the of the capping. capping.
Preferably, the Preferably, the arms armsare areable abletotobe be stretched stretched to to accommodate accommodate relative relative outward outward
movement/retraction movement/retraction ofofthe theconcrete concretebodies. bodies. 25 25 There is There is also also disclosed disclosed aa concrete concrete footpath footpath formwork system,including formwork system, includinga aformwork formwork panel for forming adjacent concrete panels of a footpath, and a support bracket for supporting panel for forming adjacent concrete panels of a footpath, and a support bracket for supporting
the system relative to a ground surface, wherein the formwork panel has a pair of vertically the system relative to a ground surface, wherein the formwork panel has a pair of vertically
opposed longitudinalrails, opposed longitudinal rails, and and the the support support bracket bracket has has an an engagement formationwhich engagement formation which has has
30 30 an an unlocked unlocked orientation orientation forfor insertingthe inserting theformation formationbetween between theopposed the opposed railstotoabut rails abutagainst against the formwork the paneland formwork panel anda arotated, rotated, locked lockedorientation orientation wherein whereinthe the formation formationisis locked locked by by the the rails against rails againstlateral withdrawal lateral withdrawalfrom fromthe theformwork panel. formwork panel.
Preferably, the Preferably, the formation formationisisunlocked unlocked from from the the opposed opposed railsrails by rotation by rotation of of the the 35 formation 35 formation about about a lateral a lateral axis axis of of thethe system system fromfrom the locked the locked orientation orientation to unlocked to the the unlocked orientation. orientation.
2019264625 22 May 2025
-7- -7-
Preferably, the bracket is supported relative to the ground surface by a stake, and the Preferably, the bracket is supported relative to the ground surface by a stake, and the
bracket has an aperture for receiving a stake. bracket has an aperture for receiving a stake.
55 Preferably, the Preferably, the stake stake is isthreaded. threaded. More preferably, the More preferably, the threaded threaded stake stake has has opposed opposed faces faces and the bracket and the bracket is is formed with rotationally formed with rotationally spaced engagementportions spaced engagement portionssuch such thatthe that the 2019264625
stake is able to be freely slid through the bracket and locked by rotating the stake about its stake is able to be freely slid through the bracket and locked by rotating the stake about its
longitudinal axis relative to the bracket. longitudinal axis relative to the bracket.
10 10 Preferably, the Preferably, the bracket bracket terminates terminates above above a a lower edge of lower edge of the the formwork panel. formwork panel.
Preferably, the formwork panel is formed as a unitary part. Preferably, the formwork panel is formed as a unitary part.
Preferably, the Preferably, the formwork panelhashas formwork panel a pairofofopposed a pair opposed sidewalls sidewalls formed formed integrally integrally
15 with 15 with at at leastone least onerib, rib, the the opposed sidewallsdefining opposed sidewalls definingaa void voidtherebetween. therebetween.
In a preferred In a preferredform, form,thethe bracket bracket is formed is formed as a unitary as a unitary part. part.
Preferably, the bracket has a central rib extending along the length of the bracket. Preferably, the bracket has a central rib extending along the length of the bracket.
20 20
Brief Descriptionofofthe Brief Description theDrawings Drawings
Preferred embodiments Preferred embodiments of of thethe invention invention will will be be described, described, by by wayway of non-limiting of non-limiting
example only,with example only, withreference referenceto to the the accompanying accompanying drawings drawings in in which: which:
25 25 Figure showsa atop Figure 11 shows topview viewofofa adowel; dowel; Figure showsa aperspective Figure 22 shows perspectiveview viewofofthe thedowel; dowel; Figure showsananopposite Figure 33 shows oppositeside sideperspective perspectiveview viewofofthe thedowel; dowel; Figures show 3atoto3c3cshow Figures 3a toptop andand perspective perspective views views of alternative of alternative dowels dowels having having a a different shape; different shape;
30 30 Figure showsbottom Figure 44 shows bottom detailofofaacorrosion-free detail corrosion-free plate plate dowel; dowel; Figure Figure 5 5 shows shows a cross a cross rib structure rib structure ofdowel of the the dowel in planin plan view; view;
Figure showsa asealing Figure 66 shows sealingflange flangeof of the the dowel dowelwhen when used used to to sealagainst seal againstaasideform; sideform; Figure showsa aside Figure 77 shows sideview viewofofaaclip-on clip-on cantilevered cantilevered plate plate dowel sleeve; dowel sleeve;
Figure showsa aperspective Figure 88 shows perspectiveview viewofofthe thesleeve; sleeve; 35 35 Figure showsa aside Figure 99 shows sidecutaway cutawayview view of of anan articulatingdowel articulating dowelsystem; system; Figure showsa aperspective 10shows Figure 10 perspectiveview viewofofthe thearticulating articulating dowel dowelsystem; system;
2019264625 22 May 2025
-- 88 -
Figure shows 11shows Figure 11 a side a side cross-sectionalview cross-sectional view of of an an articulatingdowel articulating dowel system system withwith
50mm vertical 50mm vertical lift; lift;
Figure showsa acam 12shows Figure 12 cam component component of the of the articulating articulating dowel dowel system; system;
Figure showsa aperspective 13shows Figure 13 perspectiveview viewofof a amulti-functional multi-functionalformwork formwork panel; panel;
55 Figure showsa across-sectional 14shows Figure 14 cross-sectionalview viewofofthe themulti-functional multi-functionalformwork formwork panel; panel; 2019264625
Figure showstwo 15shows Figure 15 two multi-functional multi-functional formwork formwork panels panels connected connected together; together;
Figure shows 16shows Figure 16 a multi-functional a multi-functional formwork formwork panel panel having having a capping a capping installedinstalled
thereon; thereon;
Figure showsjoining 17shows Figure 17 joiningofoftwo twomulti-functional multi-functionalformwork formwork panels; panels;
10 10 Figure showsa aRip-A-Strip 18shows Figure 18 Rip-A-Strip sealantwell sealant wellcapping cappingin in place; place;
Figure showsthe 19shows Figure 19 thecapping capping removed removed to form to form a well; a well;
Figure showsthe 20shows Figure 20 thewell wellfilled filled with with material; material; Figure showsstretching 21shows Figure 21 stretchingofofananarm armofofthe thecapping; capping; Figure is is Figure 2222 a a perspective perspective viewview of a of a twist twist andstake and lock lockbracket stake bracket and stake; and stake;
15 15 Figure showsthe 23shows Figure 23 thebracket bracketininananunlocked unlockedcondition; condition; Figure showsthe 24shows Figure 24 thebracket bracketininaalocked lockedcondition; condition; Figure shows 25shows Figure 25 thethe bracket bracket andand stake stake in in place place on on thethe multi-functional multi-functional formwork formwork
panel; panel;
Figure showstwo 26shows Figure 26 twojoined joinedformwork formwork panels, panels, each each having having a stake a stake andand bracket bracket fitted fitted
20 thereto; 20 thereto; Figure showsdetail 27shows Figure 27 detailof of the the multi-functional multi-functional formwork panelhaving formwork panel havingopposed opposed rails rails
downone down oneside; side; Figure Figure 2828 shows shows detail detail of bracket of the the bracket and and its its attachment attachment to the rails; to the opposed opposedand rails; and
Figures 29atoto29d Figures 29a show 29dshow a clip-onfoot a clip-on footfor forsupporting supportingthe theformwork formwork panel. panel.
25 25
Detailed Description Detailed Description
Withreference With referenceto to Figures Figures11 to to 6, 6, there there is isshown shown aa dowel dowel1010for forcontrolling controlling relative relative level between level between adjacent adjacent concrete concrete panels, panels, suchone such that that one concrete concrete panel of panel of a footpath a footpath or the like or the like
30 will 30 will staylevel stay levelwith withaaneighbouring neighbouringconcrete concretepanel panelsosoasastoto maintain maintainaa level level walking path and walking path and to avoid a tripping hazard. The dowel 10 is formed of corrosion-free material so as to avoid to avoid a tripping hazard. The dowel 10 is formed of corrosion-free material so as to avoid
corrosion of the corrosion of the dowel 10. dowel 10.
2019264625 22 May 2025
-9- -9-
Theadjacent The adjacentpanels panelsbeing being kept kept level level by the by the doweldowel 10 are10 are formed formed of concrete, of concrete,
howeveritit is however is possible possible that that the the dowel 10 and dowel 10 and associated associated formwork formwork system system may may be used be used for for maintainingaa level maintaining level between panelscast between panels cast from fromaa different different material. material. As As shown inFigures shown in Figures11to to 6, the 6, the dowel dowel 10 10 is is formed from material formed from material which whichisis non-metallic non-metallic and andis is preferably preferably formed of aa formed of
55 polymer polymer material material or other or other plasticplastic material material which which is is not not prone to prone to corrosion corrosion as are as are typical typical metal metal 2019264625
dowels. InInone dowels. oneparticular particularform, form,the thedowel dowel10 10 maymay be formed be formed of a of a metal metal material material portion portion
covered in a polymer material portion. In that case, the polymer material portion seals within covered in a polymer material portion. In that case, the polymer material portion seals within
itself itself the the metal materialportion metal material portionin in an an air-tight air-tight seal seal so so as as to to protect protect the the metal metal material material portion portion
from corrosion from from corrosion fromoxidation. oxidation. 10 10
Figures 3a Figures 3a to to 3c 3c show showtop topand andperspective perspectiveviews views of of alternativedowels alternative dowels10 10 having having a a different shape. different shape. Whereas thedowel Whereas the dowel1010shown shown in in Figures Figures 1 to 1 to 3 isininthe 3 is the form formofofaa six-sided six-sided shape (being rectangular at one side of the flange 18 and having a tapered portion at the other shape (being rectangular at one side of the flange 18 and having a tapered portion at the other
side of side the flange), of the flange), the thedowels dowels 10 10 shown in Figures shown in Figures 3a to 3c 3a to 3c are are four-sided. four-sided. More More
15 specifically, 15 specifically, the the four-sided four-sided dowels dowels 10 of Figures 10 of Figures 3a to 3c 3a tofront have 3c have frontsides and rear and which rear sides are which are
mutually parallel, as well as left and right sides which taper at the same angle on both sides mutually parallel, as well as left and right sides which taper at the same angle on both sides
of the flange 18. of the flange 18.
As can As canbebeseen seen in in Figures Figures 4 and 4 and 5, the 5, the dowel dowel 10 is 10 is substantially substantially planarplanar and isand is 20 generally 20 generally in in thethe form form of of a plate.Opposed a plate. Opposed edgesedges 12 of12 theofdowel the dowel 10 are10 are tapered tapered inwardly inwardly
toward a central axis of the dowel 10, the central axis lying within a plane of the dowel 10, toward a central axis of the dowel 10, the central axis lying within a plane of the dowel 10,
the central the central axis axis lying lying along the central along the central vertical vertical rib rib shown in the shown in the orientation orientation of of Figure Figure 5. 5. Tapering of the opposed edges 12 of the plate dowel 10 is configured to allow, in situ, lateral Tapering of the opposed edges 12 of the plate dowel 10 is configured to allow, in situ, lateral
movement movement between between the the adjacent adjacent concrete concrete panels panels whenwhen the panels the panels contract contract during during drying drying of of 25 thethe 25 concrete. concrete. TheThe dowel dowel 10 may 10 may have have a cross-ribbed a cross-ribbed structure structure on anonupper an upper surface surface anda and on on a lower surface lower surface to to increase increase structural structural rigidity. rigidity.
As shown As shownininFigure Figure 5, 5, thedowel the dowel 10 10 may may have have rounded rounded corners corners 14 may 14 which which be may be radiused. The radiused. dowel 10 The dowel 10 may mayalso also have have rounded rounded edges edges 16 16 (see (see Figure Figure 4) 4) which which may be may be
30 30 radiused. radiused.
Thedowel The dowel1010 maymay havehave a flange a flange 18 arranged 18 arranged to against to abut abut against a sideform a sideform 20 (see20 (see Figure 6) Figure 6) through throughwhich which the the dowel dowel 10 is10 is inserted. inserted. The flange The flange 18 extends 18 extends in in a plane a plane
2019264625 22 May 2025
- 10 - 10--
perpendicular to the plane of the plate dowel 10. The flange 18 is adapted to seal against the perpendicular to the plane of the plate dowel 10. The flange 18 is adapted to seal against the
sideform sideform 2020 so so as as to to prevent prevent ingress ingress of concrete of concrete to a joint to a joint between between adjacentadjacent concrete panels. concrete panels.
The dowel The dowelmay maybebe adapted adapted foruse for useininaa non-industrial non-industrial application application and and may be adapted may be adapted 55 forfor being being castcast intointo a concrete a concrete footpath footpath so as so as to transfer to transfer load between load between adjacent adjacent concrete panels concrete panels 2019264625
of the footpath. of the footpath.
Accordingly,there Accordingly, thereisis disclosed disclosed aa corrosion-free corrosion-freetapered taperedplate platedowel dowelload load transfer transfer
system. Thetapered system. The taperedplate platedowel dowel provides provides lateralmovement lateral movement onceonce the joint the joint contracts. contracts. The The
10 double-sided 10 double-sided cross-ribbed cross-ribbed structure structure provides provides increased increased structural structural rigidity rigidity (providing (providing
increased bendingstrength) increased bending strength) by by breaking breakingupupun-reinforced un-reinforcedhorizontal horizontalsurfaces. surfaces.Corners Cornersandand edges are edges areradiused radiusedtotoprevent prevent point point loads loads giving giving eveneven distributed distributed forces forces at dowel at the the dowel perimeter. The perimeter. Theflange flange1818onon thethe dowel dowel acts acts as as a seal a seal preventing preventing concrete concrete ingress ingress into into thethe
joint. The flange 18 may optionally incorporate a rubber seal to facilitate the sealing effect. joint. The flange 18 may optionally incorporate a rubber seal to facilitate the sealing effect.
15 15
Withreference With referenceto to Figure Figure 6, 6, there there is isshown shown aa concrete concrete footpath footpath formwork formworksystem system 22 22
including a sideform including a 20for sideform 20 for forming formingadjacent adjacentconcrete concretepanels panelsofofa afootpath footpathand anda adowel dowel1010
adapted totoextend adapted extendthrough through thethe sideform sideform 20 transferring 20 for for transferring load load between between the adjacent the adjacent
concrete panels, wherein concrete panels, the dowel wherein the dowelisisformed formedofofcorrosion-free corrosion-freematerial. material.The The sideform sideform 20 20
20 is isformed 20 formed as as a a unitarypanel unitary panelhaving havingone oneorormore moreribs ribs24 24between betweenopposed opposed faces faces 2626 totofacilitate facilitate crushing of the sideform 20 in response to expansion of the concrete panels. crushing of the sideform 20 in response to expansion of the concrete panels.
With reference to Figures 7 and 8, there is shown a sleeve 28 for a dowel 10, wherein With reference to Figures 7 and 8, there is shown a sleeve 28 for a dowel 10, wherein
the sleeve 28 is adapted to clip on to formwork through which the dowel 10 is inserted. With the sleeve 28 is adapted to clip on to formwork through which the dowel 10 is inserted. With
25 reference 25 reference to to Figure Figure 7, 7, thethesleeve sleeve2828includes includesa aflange flange3030forforabutting abuttingagainst againstthe theformwork formwork 20, aa sleeve 20, sleeve portion portion 32 32 extending fromthe extending from the flange flange 30, 30, an an upper upper rib rib 34 supporting the 34 supporting the sleeve sleeve portion 32 portion 32 relative relative to to the the flange 30 and flange 30 anda alower lowerribrib3636supporting supporting thethe sleeve sleeve portion portion 32 32 relative totothe relative theflange 30. flange 30.The Theflange flange30 30includes includesan anupper upper flange flangeportion portion38 38for forengagement engagement
with an upper rail 40 of the formwork and a lower flange portion 42 having resilient clips 44 with an upper rail 40 of the formwork and a lower flange portion 42 having resilient clips 44
30 30 forfor clippingbehind clipping behind a lower a lower rail4646ofofthe rail theformwork. formwork.
The sleeve The sleeve2828maymay include include surrounds surrounds aroundaround the resilient the resilient clips clips 44 44 preventing preventing
dislodgementofofthe dislodgement theupper upperflange flangeportion portion3838from from thethe upper upper rail4040ofofthe rail theformwork. formwork.The The
2019264625 22 May 2025
-- 11 11 --
sleeve sleeve 28 28 may includecrushable may include crushableinternal internal lateral lateralmovement voids48 movement voids 48located located at at opposed sides opposed sides
of of aa cavity cavity50 50 for forreceiving receivingthe dowel the dowel10. 10.The The sleeve sleeve 28 28 may include an may include an expansion expansionvoid voidand and the sleeve portion 32 may include internal ribs 52 which provide interference on insertion of the sleeve portion 32 may include internal ribs 52 which provide interference on insertion of
the dowel the 10. The dowel 10. Thesleeve sleeve2828includes includescentering centeringribs ribs 54 54 which, which, when whenthe thesleeve sleeve2828isis clipped clipped 55 onon to to theformwork, the formwork, protrude protrude intoa dowel into a dowel slot slot of of thethe formwork formwork to prevent to prevent lateral lateral 2019264625
misalignment of the sleeve 28 and the slot. misalignment of the sleeve 28 and the slot.
Accordingly, thereisis shown Accordingly, there showna aconcrete concrete footpath footpath formwork formwork system system 22 including 22 including a a sideform sideform 2020 for for forming forming adjacent adjacent concrete concrete panels panels of a footpath, of a footpath, a dowel a 10dowel 10toadapted adapted extend to extend
10 through 10 through thethe sideform sideform 20 for 20 for transferring transferring load load between between the adjacent the adjacent concrete concrete panels, panels, and aand a
sleeve 28 for sleeve 28 for receiving receiving the the dowel dowel10, 10,wherein wherein thethe sleeve sleeve 28 28 is adapted is adapted to clip to clip on the on to to the sideform 20. sideform 20.
Features: Features:
15 15  Fastener-less pivoting Fastener-less pivoting clip clipon on function function to toextruded extruded formwork. formwork.
 Resists sleeve Resists sleeve pull pull down bybracing down by bracingitself itself above sleeve body above sleeve bodywith withlocked lockedinin cantilevered ribs. cantilevered ribs.
 Ribs belowthe Ribs below thesleeve sleeve brace brace sleeve sleeve in in compression. compression.
 Surrounds aroundthetheclips Surrounds around clipsprevent preventsleeve sleevedislodgement dislodgement fromfrom top top pivoting pivoting
20 20 point. point.
 Incorporates 5mm Incorporates 5mm crushable crushable internal internal lateralmovement lateral movement voidsvoids and aand a 10mm 10mm expansion void. expansion void.
 Corners and Corners and edges edges are are radiused radiused to prevent to prevent point point loads even loads giving giving even distributed distributed
forces at the forces at thesleeve sleeveperimeter. perimeter. 25 25  Internal ribs provide Internal ribs provideinterference interference to the to the plate plate dowel dowel upon upon insertion insertion to prevent to prevent
accidental pull-out during concrete pouring. accidental pull-out during concrete pouring.
 Centring ribs protrude Centring ribs protrude into into the the slot slot on on formwork formworkpreventing preventinglateral lateral misalignment of the sleeve with the slot. misalignment of the sleeve with the slot.
30 30 With reference to Figures 9 to 12, there is also disclosed an articulating dowel system With reference to Figures 9 to 12, there is also disclosed an articulating dowel system
56, 56, including including aa dowel dowel 58 58 and and a a dowel sleeve 60, dowel sleeve 60, wherein wherein the the dowel 58 includes dowel 58 includes aa cam portion cam portion
62 located within 62 located within the the sleeve sleeve 60 60 to to allow the dowel allow the dowel5858totopivot pivot relative relative to to the the dowel sleeve dowel sleeve
60. 60.
2019264625 22 May 2025
- 12 - - - 12 -
Thecam The camportion portion 62 62 hashas a forward a forward rounded rounded part part 64 64Figure (see (see Figure 12) to 12) to facilitate facilitate
pivoting of pivoting of the the dowel dowel5858relative relativetoto the the dowel dowelsleeve sleeve60,60,andand a rearward a rearward tapered tapered partpart 66 66 extending rearwardly extending rearwardlyandand tapering tapering inwardly inwardly from from the rounded the rounded part 64part 64 topivotal to limit limit pivotal 55 movement movement of dowel of the the dowel 58 relative 58 relative to dowel to the the dowel sleevesleeve 60.rounded 60. The The rounded partthe part 64 and 64 and the 2019264625
tapered part tapered part 66 66 define defineaapivot pivotwith withupper upper andand lower lower stops stops to allow to allow limited limited upward upward and and downward downward pivoting pivoting of of thedowel the dowel 58 58 relative relative toto thedowel the dowel sleeve sleeve 60.TheThe 60. dowel dowel 58 be 58 may may be formed fromcorrosion-free formed from corrosion-freematerial materialsuch suchas, as, for for example, polymermaterial. example, polymer material.The The sleeve sleeve 6060
maybebeadapted may adapted to to clip clip on on to atosideform a sideform 20forming 20 for for forming adjacent adjacent concreteconcrete panels panels 68. 68. 10 Accordingly, 10 Accordingly, there there is is shown shown a concrete a concrete footpath footpath formwork formwork system system including including a sideform a sideform 20 20 for forming for adjacent concrete forming adjacent concrete panels panels 68 68 of of aa footpath, footpath, aadowel dowel 58 58 adapted adapted to to extend extend through through
the sideform the 20 for sideform 20 for transferring transferring load load between the adjacent between the adjacent concrete concrete panels panels 68, 68, and and aa sleeve sleeve 60 for receiving 60 for receiving the the dowel 58, wherein dowel 58, whereinthe thedowel dowel58 58 is is arranged arranged to to pivotupwardly pivot upwardly and/or and/or
downwardly downwardly relativetotothe relative thesleeve sleeve60. 60.With With reference reference to to Figure Figure 10, 10, thethe concrete concrete footpath footpath
15 formwork 15 formwork system system may include may include a seal a70seal 70 fitted fitted to thetosideform the sideform 20, the20, the70seal seal 70 having having an an aperture 72 through aperture 72 throughwhich which a tongue a tongue 74 74 of the of the dowel dowel 58 is58inserted is inserted suchsuch that that the seal the seal 70 70
operates operates to to seal sealbetween between the the dowel 58 and dowel 58 andthe the sideform sideform2020against againstconcrete concreteingress. ingress.
Features: Features:
20 20  Corrosion-free articulating dowel system which allows for deflection control on light Corrosion-free articulating dowel system which allows for deflection control on light
duty concrete pavements when joint articulates due to tree roots or reactive soil. duty concrete pavements when joint articulates due to tree roots or reactive soil.
 Allows up toto 50mm Allows up 50mmof of simultaneous simultaneous verticallift vertical lift on onslabs slabs while while maintaining maintaining deflection control,load deflection control, loadtransfer, transfer, lateraldowel lateral dowel movement movement and expansion and expansion capabilities. capabilities.
 CAM component CAM component of dowel of dowel allowsallows dowel dowel rotation rotation while carrying while carrying load horizontally load horizontally
25 25 across joint. across joint.
 Fastener-less pivoting Fastener-less pivoting clip clipon on function function of ofsystem system to toextruded extruded formwork. formwork.
 Resists sleeve Resists sleeve pull pull down down by bracing by bracing itself itself above above sleevesleeve bodylocked body with with inlocked in cantilevered ribs. cantilevered ribs.
 Ribs below Ribs belowthe thesleeve sleeve brace brace sleeve sleeve in in compression. compression.
30 30  Surrounds aroundthe Surrounds around theclips clips prevent prevent sleeve sleeve dislodgement dislodgementfrom from toppivoting top pivotingpoint. point.  Incorporates 5mmcrushable Incorporates 5mm crushable internallateral internal lateral movement voids movement voids and and a 10mm a 10mm expansion expansion
void. void.
2019264625 22 May 2025
- 13 - - 13 -
 Centring ribs protrude Centring ribs protrude into into the the slot sloton onformwork preventinglateral formwork preventing lateral misalignment of misalignment of
the sleeve with the slot. the sleeve with the slot.
 Dowel Dowel isiskept kepthorizontal horizontal during duringconcrete concretepour pourbybycrushable crushablepositioning positioningribs ribslocated located internally in the internally in thesleeve. sleeve. 55  System System is is sealed offoff from concrete ingress with an additional seal. 2019264625
sealed from concrete ingress with an additional seal.
Withreference With referencetotoFigures Figures1313toto17, 17,there thereisisshown shown a formwork a formwork panelpanel 76forming 76 for for forming adjacent concrete adjacent concrete bodies, bodies, wherein whereinthe the formwork formwork panel panel 76 76 is is adapted adapted to to bebe compressible compressible on on expansionofofthe expansion theconcrete concretebodies. bodies.TheThe concrete concrete bodies bodies may may be in be the in theofform form of adjacent adjacent
10 concrete 10 concrete panels panels of of a footpathororthe a footpath thelike. like.
Theformwork The formwork panel panel 76 76 may may be substantially be substantially planar planar to betoin bea in a plane plane substantially substantially
perpendicular toto aa travel perpendicular travel surface surface formed formedbyby upper upper surfaces surfaces of the of the concrete concrete bodies. bodies. For For example,asasshown example, shownin in Figure Figure 14,14, thethe concrete concrete bodies bodies 68 have 68 have upperupper surfaces surfaces 78 and78 and the the 15 formwork 15 formwork panel panel 76substantially 76 is is substantially perpendicular perpendicular to atotravel a travel surface surface (e.g.footpath) (e.g. footpath)formed formed by the by the upper uppersurfaces surfaces78. 78.TheThe planar planar nature nature of the of the formwork formwork panel panel 76 is 76 is in contrast in contrast to to existing formwork existing which formwork which hasa across-sectional has cross-sectionalshape shapeininthe theform formofofananinverted invertedT. T.
The formwork The formwork panel panel 7676 may may be be extruded extruded withwith a constant a constant cross-sectional cross-sectional shape shape along along
20 its length such that the formwork panel 76 is able to be cut to length so as to suit a particular 20 its length such that the formwork panel 76 is able to be cut to length so as to suit a particular
application. The application. The formwork formwork panel panel 76 76 least has at has atoneleast one internal internal void 80 tovoid 80 to facilitate facilitate sacrificialsacrificial
compression of compression of the the formwork panel 76 formwork panel 76 on onexpansion expansionofofthe the concrete concrete bodies bodies 68. 68. The The formwork panel formwork panel 76 76 hashas a pair a pair of opposed of opposed sideform sideform walls walls 82 connected 82 connected by atoneleast one by at least
sacrificial rib sacrificial 8484defining rib definingananinternal void internal 8080between void betweenthe theopposed opposed sideform walls 82. sideform walls 82. The The 25 formwork 25 formwork panelpanel 76ahas 76 has a pair pair of opposed of opposed rails rails 86 along 86 along at least at least one side one side of formwork of the the formwork panel 76, panel 76, the the opposed rails 86 opposed rails 86 defining defining a a channel for slideable channel for slideable mounting of an mounting of an accessory accessory to to the formwork the panel formwork panel 76. 76. The The channel channel enables enables the formwork the formwork panel panel 76 76connected to be to be connected to to another like another like formwork panel7676(see formwork panel (seeFigure Figure17) 17)bybyinserting insertingone oneend endofofa ajoiner joinerplate plate 88 88 in in the channel the of the channel of the formwork panel7676and formwork panel andananopposite oppositeendend ofof thejoiner the joinerplate plate in in the the channel channel
30 30 of of thethe likeformwork like formwork panel panel 76.76.
Features: Features:
 Compressible extrudedsacrificial Compressible extruded sacrificial formwork formworkpanel panelandand capping. capping.
2019264625 22 May 2025
- 14 - - - 14 -
 Crushableupuptoto 10mm Crushable 10mm to to allow allow forfor thermal thermal expansion expansion at at joint. joint.
 Multi-functional utility Multi-functional utility channel channelwhich which allows allows for components for components to be to be attached attached continuouslyalong continuously alongthe the length. length.  Retains function Retains function as as an an expansion joint and expansion joint functionally of and functionally of components when components when cut. cut.
55 Panels can be joined with joiner plate at an y point when cut. 2019264625
 Panels can be joined with joiner plate at an y point when cut.
Theformwork The formwork panel panel 76 76 maymay alsoalso havehave an upper an upper capping capping 90,capping 90, the the capping 90 having 90 having
side walls side 92 and walls 92 andaa top topsurface surface9494arranged arrangedtotobebelevel levelwith withthe theupper upper surfaces surfaces 78 78 of of thethe
concrete bodies 68, concrete bodies 68, as as shown inFigure shown in Figure18. 18.The The capping capping 90 90 maymay be adhered be adhered to a to a top top of the of the
10 formwork 10 formwork panel panel 76shown 76 as as shown in Figures in Figures 18 to18 to or 21, 21,may or be may be resiliently resiliently clipped clipped or slid or slid on on to to
a top a top portion portion of of the theformwork panel 76 formwork panel 76as as shown shownininFigures Figures1616and and17. 17.
Withreference With referenceto to Figures Figures 18 18to to 21 21 there there is is shown shown aa formwork formwork panel panel 76 76 forfor forming forming
adjacent concrete adjacent concrete bodies bodies 68, 68, the the formwork formwork panel panel having having a formwork a formwork panelpanel body body 96 and96 a and a 15 formwork 15 formwork panel panel capping capping 90 arranged 90 arranged to betoselectively be selectively moved moved from from a a coupled coupled condition condition (see (see
Figure 18) Figure 18) in in which the formwork which the formworkpanel panel capping capping 90 90 is is coupled coupled to to theformwork the formwork panel panel bodybody
96 to 96 to form form aa surface surface level level with with upper upper surfaces surfaces 78 78 of of the theconcrete concretebodies bodies 68 68 and and aa decoupled decoupled
condition (see condition (see Figure Figure19) 19)ininwhich which at least at least part part of of the the formwork formwork panel panel capping capping 90 is 90 is decoupledfrom decoupled fromthe theformwork formwork panel panel bodybody 96assotoasform 96 so to form a well a well 98 between 98 between the concrete the concrete
20 bodies 20 bodies 68.68. TheThe wellwell 98 may 98 may have have a predetermined a predetermined depth depth being being the height the height of theofcapping the capping 90, 90, less a thickness of a floor of the capping 90. less a thickness of a floor of the capping 90.
Theformwork The formwork capping capping 90 90 maymay be formed be formed with with a frangible a frangible part part 100 100 whichwhich is torn is torn to to movethe move theformwork formwork panel panel capping capping 90 90 from from thethe coupled coupled condition condition to to thethedecoupled decoupled condition. condition.
25 TheThe 25 frangible frangible part part 100100 may may be located be located between between an portion an upper upper portion of the of the capping capping 90 90 and a and a lower portion of the capping 90 such that tearing the frangible part 100 separates the upper lower portion of the capping 90 such that tearing the frangible part 100 separates the upper
portion of portion of the the capping 90from capping 90 fromthe thelower lowerportion portionofofthe thecapping capping 90. 90. Figure Figure 18 shows 18 shows the the upper portion upper portion and andlower lowerportion portionofofthe the capping capping9090connected connected whereas whereas Figure Figure 19 shows 19 shows the the upper portion upper portion removed removedfrom from thethe lower lower portion.TheThe portion. capping capping 90 may 90 may include include opposed opposed arms arms 30 30 102102 extending extending laterally laterally outwardly outwardly from from opposite opposite sides sides of of thethecapping capping 9090 such such thatdistal that distal ends ends of the of the arms 102 are arms 102 are embedded embedded in in theconcrete the concretebodies bodies 68.68. Each Each of the of the distal distal arms arms 102102 may may
have an enlarged portion 104 to facilitate retainment in the concrete. have an enlarged portion 104 to facilitate retainment in the concrete.
2019264625 22 May 2025
- 15 - - 15 -
The opposed The opposedarms arms 102 102 maymay extend extend outwardly outwardly from from the lower the lower portion portion of capping of the the capping 90, and 90, the arms and the arms 102 102 may maybebeable abletotobebestretched stretched toto accommodate accommodate relativeoutward relative outward movement/retraction movement/retraction ofofthe theconcrete concretebodies bodies(see (seeFigure Figure21). 21).Advantageously, Advantageously, by virtue by virtue of of
the opposed the opposedarms arms102102 being being ableable to stretch to stretch in this in this way, way, theythey stretch stretch withwith joint joint opening opening
55 covering covering thethe gapgap preventing preventing epoxies epoxies from from running running downdown the joint the joint gap gap and acting and acting as a as a debris debris 2019264625
and weed and weeddeterrent. deterrent.
Features: Features:
 Flexible permanent/removable Flexible capping. permanent/removable capping.
10 10  Option Option 11 to to remain remainpermanently permanentlywith withjoint. joint.  Option Option 22to to be beripped rippedoff offjoint joint (once (once poured) poured)atattear tear points points to to allow allow scrabbling scrabblingofof joint and to create a welled rebate for use of joint sealants. joint and to create a welled rebate for use of joint sealants.
 Wings on side anchor into concrete (either side). Wings on side anchor into concrete (either side).
 Ribs stretch with Ribs stretch joint opening with joint coveringthe opening covering thegap gappreventing preventingepoxies epoxies from from running running
15 15 downjoint down joint gap gapand andact act as as aa debris debris and and weed deterrent. weed deterrent.
Turning to Figures Turning to Figures 22 22 to to 28, 28, there thereisis shown shown aaconcrete concretefootpath footpathformwork system22, formwork system 22, including including aa formwork formworkpanel panel 76 76 forfor forming forming adjacent adjacent concrete concrete panels panels of a of a footpath, footpath, and and a a support support bracket bracket 106 for supporting 106 for supporting the the system system 22 22 relative relativetoto a ground a groundsurface. The surface. Theformwork formwork
20 panel 20 panel 76 76 hashas a pair a pair of of verticallyopposed vertically opposed longitudinal longitudinal rails86, rails 86,and andthe thesupport supportbracket bracket106 106 has an has an engagement engagement formation formation 108 108 which which hasunlocked has an an unlocked orientation orientation (see Figure (see Figure 23) for23) for inserting the inserting theformation formation 108 108 between the opposed between the opposedrails rails to to abut abut against againstthe theformwork panel 76 formwork panel 76
and a rotated, locked orientation (see Figure 24) wherein the formation 108 is locked by the and a rotated, locked orientation (see Figure 24) wherein the formation 108 is locked by the
rails 86 rails 86 against againstlateral lateralwithdrawal withdrawalfrom fromthe theformwork panel 76. formwork panel 76. 25 25 The formation The formation108 108isis unlocked unlockedfrom fromthe theopposed opposedrails rails86 86by byrotation rotation of of the the formation formation
108 abouta alateral 108 about lateralaxis axisofofthe thesystem system from from the the locked locked orientation orientation to the to the unlocked unlocked orientation. orientation.
The bracket The bracket106 106isissupported supportedrelative relative to to the the ground groundsurface surfacebybya astake stake110 110and andthethe 30 bracket 30 bracket 106anhas 106 has an aperture aperture 112 112 (see (see28) Figure Figure 28) for receiving for receiving the stake. the The stake. The stake is stake is threaded threaded
(see (see Figure Figure 22) 22) and has opposed and has opposedfaces faces114, 114,the thebracket bracket106 106being beingformed formed with with rotationally rotationally
spaced engagement spaced engagement portions portions suchsuch thatthat the the stake stake 110able 110 is is able to be to be freely freely slid along slid along its its longitudinal axis longitudinal axis through through the the bracket bracket106 106and and locked locked by by rotating rotating thethe stake stake 110110 about about its its
2019264625 22 May 2025
- 16 - - - 16 -
longitudinal axisrelative longitudinal axis relativeto tothethe bracket bracket 106.106.
As can As can be be seen seen in in Figure 28, the Figure 28, the bracket bracket 106 106 terminates terminates at at aalower lower end end thereof thereofabove above
a lower a edge of lower edge of the the formwork panel76. formwork panel 76.TheThe formwork formwork panel panel 76formed 76 is is formed as a as a unitary unitary partpart
55 andand has has a pair a pair of opposed of opposed side walls side walls 82 formed 82 formed integrally integrally withone with at least at least onetheribopposed rib 84, 84, the opposed 2019264625
side side walls 82 defining walls 82 defining aa void void8080therebetween. therebetween. In the In the example example shownshown in Figure in Figure 27, the27, the
formwork panel formwork panel 76 six 76 has hassuch six ribs such84, ribscomprising 84, comprising tworibs two external external ribsinternal and four and four internal ribs. ribs.
The bracket The bracket106 106maymay itselfbe be itself formed formed as aasunitary a unitary partpart and and may ahave may have a central central rib rib 116 116 extending along extending along thethe length length of bracket of the the bracket 106. 106.
10 10 Figures 29a Figures 29a to to 29d 29dshow showa aclip-on clip-onfoot foot120 120forforsupporting supporting theformwork the formwork panel panel 76. 76. In particular, there is provided a clip-on foot 120 having a portion 122a and 122b for clipping In particular, there is provided a clip-on foot 120 having a portion 122a and 122b for clipping
on to aa bottom on to bottomtapered taperedrail rail of of the the formwork formworkpanel panel76.76.TheThe portion portion for for clipping clipping on the on to to the bottom tapered rail is formed of long upright support 122a and a short upright support 122b. bottom tapered rail is formed of long upright support 122a and a short upright support 122b.
15 15 TheThe long long upright upright support support 122a 122a hashas a strengthening a strengthening brace brace 124 124 extending extending from from thethe long long upright upright
support 122adownwardly support 122a downwardlyandand outwardly outwardly to supported to be be supported along along a horizontal a horizontal footfoot portion portion of of
the clip-on foot 120. The horizontal foot portion also has a pair of opposed notches 126 for the clip-on foot 120. The horizontal foot portion also has a pair of opposed notches 126 for
soil nailing of the formwork profile using pins. Advantageously, the clip-on foot 120 enables soil nailing of the formwork profile using pins. Advantageously, the clip-on foot 120 enables
the formwork the profiletotobebefreestanding, formwork profile freestanding,with withmultiple multiple(for (for example examplethree threeororfour) four)clip-on clip-on 20 feet 20 feettotobebefitted fittedalong alongaaspan spanofofthe the formwork. formwork.TheThe clip-on clip-on foot foot 120120 enables enables the the formwork formwork
to be to be moved moved totoaafinal final position, position, with with the the notches notches 126 being used 126 being usedfor for pinning pinningthe the formwork formwork panel 76 in position directly in the soil. panel 76 in position directly in the soil.
Features: Features:
25 25  Formwork Formwork bracing bracing andand height height adjustment adjustment system. system.
 Attachedto Attached to any any point point of of the the formwork panelutility formwork panel utility channel channel with withaa twist twist and and
lock lock CAM base. CAM base.
 Inserted and turned 45 degrees to lock. Inserted and turned 45 degrees to lock.
 Fastener-less attachment process is quick and intuitive. Fastener-less attachment process is quick and intuitive.
30 30  Central rib-based Central rib-based shape shape provides provides additional additional anchorage anchorage of the of the joint in joint in one slab one slab
(pour through). (pour through).
 Removable Removable and and reusable reusable before before second second pour pour (stop (stop pour). pour).
 Twist and lock stake lock off. Twist and lock stake lock off.
2019264625 22 May 2025
- 17 - - 17 -
System Features Overview: System Features Overview:  Application: Concrete Application: ConcretePavements Pavements (Footpaths, (Footpaths, Bikeways) Bikeways) for pedestrian for pedestrian and and light light vehicular traffic in vehicular traffic urban residential in urban residential areas, areas, parklands, parklands,commercial commercial 55 (retail) (retail) public spacesand public spaces and civilinfrastructure. civil infrastructure. 2019264625
 The system The systemhashas been been designed designed to satisfy to satisfy the requirements the requirements of Australian of Australian
Standard: AS 3727.1:2016 Standard: AS 3727.1:2016 ResidentialPavements Residential Pavements  A modular A modularsolution, solution,with withthe thecapability capabilitytotocast castaarange rangeofofslab slabthicknesses thicknesses 75mm, 100mm, 75mm, 100mm, 125mm 125mm & 150mm. & 150mm. Modular Modular sections sections are joinable are joinable to cast to cast
10 10 pavementsupuptoto(and pavements (andgreater greaterthan) than) 4m 4mininwidth. width.  A self-supporting A self-supportingdesign, design,that that is is economical economical to freight, to freight, and isand is easily easily assembled onsite. assembled on site.  Thesolution The solutionmust must be be non-corrosive non-corrosive for inuse for use in bayside bayside applications applications or or decorative pavement decorative pavementstreetscapes. streetscapes. 15 15  Mustprovide Must providefor forthermal thermalexpansion expansionand andcontraction contractiontotoa amaximum maximum joint joint gapgap
thickness of thickness of 10mm. 10mm.
 A joint system A joint whichminimises system which minimisesthe theimpact impactofofpavement pavement slab slab heaving heaving caused caused
by (1) Tree Roots or (2) Reactive Soil. by (1) Tree Roots or (2) Reactive Soil.
 A joint system A joint systemthat thatcontrols controlsdeflection deflectionunder underthetheconditions conditions slab slab heaving heaving
20 20 caused by: (1) caused by: (1) Tree Tree Roots or (2) Roots or (2) Reactive Soil Reactive Soil
While variousembodiments While various embodiments of the of the present present invention invention have have beenbeen described described above, above, it it should be understood should be understoodthat that they they have been presented have been presented by byway wayofofexample exampleonly, only,and andnot notbybyway way 25 of limitation. It will be apparent to a person skilled in the relevant art that various changes 25 of limitation. It will be apparent to a person skilled in the relevant art that various changes
in in form anddetail form and detail can can be be made madetherein thereinwithout withoutdeparting departing from from thethe spiritand spirit and scope scope of of thethe
invention. Thus,the invention. Thus, the present present invention invention should shouldnot notbe belimited limited by by any anyofof the the above abovedescribed described exemplary embodiments. exemplary embodiments.
30 30 The reference The referenceinin this this specification specification to to any any prior prior publication publication (or (orinformation information derived derived
from it), or from it), or to to any any matter matter which is known, which is is not, known, is not, and and should should not not be be taken taken asasanan acknowledgment acknowledgment or admission or admission or form or any any of form of suggestion suggestion thatprior that that that publication prior publication (or (or information derived from information derived fromit) it) or or known matterforms known matter formspart partofof the the common common general general knowledge knowledge
2019264625 22 May 2025
- 18 - - 18 -
in in the field of the field of endeavour endeavour to to which which this this specification specification relates. relates.
Throughout this specification and the claims which follow, unless the context Throughout this specification and the claims which follow, unless the context
requires otherwise, requires otherwise, the the word "comprise", and word "comprise", andvariations variations such such asas"comprises" "comprises"andand 55 "comprising", "comprising", will will be be understood understood to imply to imply the the inclusion inclusion of of a stated a stated integerororstep integer stepororgroup group 2019264625
of integersororsteps of integers stepsbut butnotnot thethe exclusion exclusion of other of any any other integer integer or stepororstep orofgroup group of integers integers or or steps. steps.
- - 19 - 22 May 2025 2019264625 22 May 2025
THE CLAIMS THE DEFINING THE CLAIMS DEFINING THE INVENTION INVENTION ARE ARE AS AS FOLLOWS: FOLLOWS:
1. 1. A sleeve for A sleeve for aa dowel, whereinthe dowel, wherein thesleeve sleeveis is adapted adapted to to clip clip on on to to formwork through formwork through
whichthe which thedowel dowelisisinserted, inserted, wherein whereinthe thesleeve sleeveincludes includesa aflange flangefor forabutting abuttingagainst againstthe the formwork, formwork, a asleeve sleeveportion portionextending extending from from thethe flange, flange, an an upper upper rib rib supporting supporting the the sleeve sleeve 2019264625
portion relative to the flange and a lower rib supporting the sleeve portion relative to the portion relative to the flange and a lower rib supporting the sleeve portion relative to the
flange, flange, and whereinthe and wherein theflange flangeincludes includesananupper upper flange flange portion portion forfor engagement engagement with with an an upper rail upper rail of of the the formwork and formwork and a lower a lower flange flange portion portion having having resilient resilient clips clips forfor clipping clipping
behind aa lower behind lower rail rail of of the theformwork. formwork.
2. 2. A sleeve A sleeve as as claimed claimedininclaim claim1,1,wherein whereinthethe sleeve sleeve includes includes surrounds surrounds around around the the resilient clips preventing dislodgement of the upper flange portion from the upper rail of the resilient clips preventing dislodgement of the upper flange portion from the upper rail of the
formwork. formwork.
3. 3. A sleeve A sleeve as as claimed claimedininclaim claim11oror2,2, wherein whereinthe thesleeve sleeveincludes includescrushable crushableinternal internal lateral lateral movement voids movement voids located located at opposed at opposed sides ofsides of afor a cavity cavity for receiving receiving the dowel.the dowel.
4. 4. A sleeve A sleeveasasclaimed claimedininany any oneone of of claims claims 1 to1 3, to wherein 3, wherein the sleeve the sleeve includes includes an an expansion void. expansion void.
5. 5. A sleeve A sleeve as as claimed claimedin in any any one oneof of claims claims 11 to to 4, 4, wherein the sleeve wherein the sleeve portion portion includes includes
internal ribs which internal ribs whichprovide provide interference interference on insertion on insertion of the of the dowel. dowel.
6. 6. A sleeve as claimed in any one of claims 1 to 5 wherein the sleeve includes centering A sleeve as claimed in any one of claims 1 to 5 wherein the sleeve includes centering
ribs which, when the sleeve is clipped on to the formwork, protrude into a dowel slot of the ribs which, when the sleeve is clipped on to the formwork, protrude into a dowel slot of the
formwork to prevent formwork to prevent lateral lateral misalignment misalignment of theand of the sleeve sleeve and the slot. the slot.
22 May 2025 2019264625 22 May 2025
- 20 -
7. 7. A concrete A concretefootpath footpathformwork formwork system system including including a sideform a sideform for forming for forming adjacent adjacent
concrete panels concrete panels ofof a a footpath, footpath, a dowel a dowel adapted adapted to extend to extend throughthrough the sideform the sideform for transferring for transferring
load between load between thethe adjacent adjacent concrete concrete panels, panels, and a sleeve and a sleeve as claimed as claimed in any oneinofany one1oftoclaims 1 to claims
6. 6.
1/16 1/16 10 14 Nov 2019
2019 10
2019264625 14 Nov
18 18 2019264625
FIG. 1 FIG. 1 10 10
.00000
10000
...... N0000000'
...... 000000'
....
00000
18 18
FIG. FIG. 2 2 10 10
18 18
NEW
FIG. FIG. 3
2/16 2/16 10 10 14 Nov 2019 2019264625 14 Nov 2019 2019264625
18 18
FIG. FIG. 3a 3a 10 10
18 18
FIG. FIG. 3b 3b 10 10
18 18
FIG. FIG. 3c 3c
3/16 3/16 14 Nov 2019 14 Nov 2019
10 10
18 18 ......\ .0000000 @@@@ 100000 .000000 2019264625
2019264625
100000 100000' " 16 16
100000'
" 16
FIG. FIG. 4 4 10 10
14 14 14 14
12 12 12 12
18 18 18 18
14 D O 14 14
0 14
FIG. FIG. 5
4/16 4/16 14 Nov 2019 2019264625 14 Nov 2019
22 22
20 20 2019264625
10 18 18 24 24
26 26
FIG. FIG. 6 6
20 20
40 40 30 30
34 34
28 28 10 10 32 32
46 46 36 36
FIG. FIG. 7
5/16 5/16 14 Nov 2019 2019264625 14 Nov 2019
38 38 28 28
84 84 2019264625
54 54 48 48 50 50
44 44
52 52 48 48 42 42 54 54
44 44
FIG. FIG. 8 8
58 58 62 60 62 60
D 1 25 4 4 D 4 D 4 56 56 4 4 4 D
I D 4 D 4 4 4 4 D 4 D
4 4 D 4 4 4 4 D 4 D
4 4 A 4 4 4 4 S A
FIG. FIG. 9
6/16 6/16 14 Nov 2019 2019264625 14 Nov 2019
56 56
70 70
72 2019264625
72
74 74
58 58 60 60 20 20
FIG. FIG. 10 10
56 56
68 68 68 68
1 62 62 V 60V 60 D D D 4 58 58 4 D
D D D D 4 I D
D D I 4 D 4 D
D.
4 4 D 4 S
FIG. FIG. 11
7/16 7/16 14 Nov 2019 2019264625 14 Nov 2019
20 20 2019264625
58 58
60 60
66 66 62 62 64 64
FIG. FIG. 12 12
90 90 106 106
DI AA
88 88
110 110
76 76
FIG. FIG. 13
8/16 8/16 14 Nov 2019
2019
78 78 78 78 2019264625 14 Nov
& 4
I I 4 4 4 80 80 4 4 2019264625
4 I 4 4 4
I 4 68 68 4 68 68 I 4 4 A 4
4 4 AD D I I
1 4 4 4 I 4 4
4 4 4 4 4
FIG. FIG. 14 14
90 90
88 88
76 76
76 76
FIG. FIG. 15
9/16 9/16 14 Nov 2019 2019264625 14 Nov 2019
90 90 2019264625
86 86
84 84 80 80 82 82
86 86
FIG. FIG. 16 16 90 90
1 90 90
88 88
ATE
76 76
76 76
FIG. FIG. 17
10/16 10/16 14 Nov 2019 2019264625 14 Nov 2019
90 90 94 94 92 92 100 100 100 100 92 92
4 4 I 4
4 I 4 2019264625
4 D 68 D 68 68 4 68
D 4 D 4 A D D 4
FIG. FIG. 18 18 104 102 104 102 102 104 102 104
4 4 D 98 98 I 4
4 4 D 4 4 D 96 I 96 4 D 4 4 A I I 4
FIG. FIG. 19 19 104 104 104 104
4 4 I I 4
D 4 D 4 4 D 96 96 4 I 4 I 4 A I I 4
FIG. FIG. 20
11/16 11/16 14 Nov 2019
2019
2019264625 14 Nov
102 102 90 90 102 102
4 4 2019264625
I 100 100
4
I 96 96
4 D
FIG. FIG. 21 21 22 22
76 76
114 114
H 86 86
108 108 106 106
86 86 AS
110 110
FIG. FIG. 22
12/16 12/16 14 Nov 2019 2019264625 14 Nov 2019
86 86
76 76 2019264625
106 106
86 86
FIG. FIG. 23 23
86 86
76 76
106 106
86 86
FIG. FIG. 24
13/16 13/16 14 Nov 2019 2019264625 14 Nov 2019
76 76 2019264625
106 106
86 86
110 110
FIG. FIG. 25 25
76 76
106 106
86 86
110 110
106 106
110 110
FIG. FIG. 26
14/16 14/16 14 Nov 2019 2019264625 14 Nov 2019 2019264625
86 86
84 84
82 82
86 86
FIG. FIG. 27 27
106 106 112 112
76 76 108 108
116 116
FIG. FIG. 28
15/16 15/16 14 Nov 2019 14 Nov 2019 2019264625
2019264625
124 124
126 126
120 120 122a 122a
FIG. FIG. 2 9a 29a
111 000
124 124
126 126
120 120 126 126 122b 122b
FIG. 9b FIG. 229b
16/16 16/16 14 Nov 2019 2019264625 14 Nov 2019 2019264625
122b 122b
126 126
126 126
120 120
FIG. FIG. 2 9c 29c
124 124
7
122a 122a
126 126
126 126
120 120
FIG. 9d FIG. 229d

Claims (7)

THE CLAIMS DEFINING THE INVENTION ARE AS FOLLOWS:
1. A sleeve for a dowel, wherein the sleeve is adapted to clip on to formwork through which the dowel is inserted, wherein the sleeve includes a flange for abutting against the formwork, a sleeve portion extending from the flange, an upper rib supporting the sleeve portion relative to the flange and a lower rib supporting the sleeve portion relative to the flange, and wherein the flange includes an upper flange portion for engagement with an upper rail of the formwork and a lower flange portion having resilient clips for clipping behind a lower rail of the formwork.
2. A sleeve as claimed in claim 1, wherein the sleeve includes surrounds around the resilient clips preventing dislodgement of the upper flange portion from the upper rail of the formwork.
3. A sleeve as claimed in claim 1 or 2, wherein the sleeve includes crushable internal lateral movement voids located at opposed sides of a cavity for receiving the dowel.
4. A sleeve as claimed in any one of claims 1 to 3, wherein the sleeve includes an expansion void.
5. A sleeve as claimed in any one of claims 1 to 4, wherein the sleeve portion includes internal ribs which provide interference on insertion of the dowel.
6. A sleeve as claimed in any one of claims 1 to 5 wherein the sleeve includes centering ribs which, when the sleeve is clipped on to the formwork, protrude into a dowel slot of the formwork to prevent lateral misalignment of the sleeve and the slot.
7. A concrete footpath formwork system including a sideform for forming adjacent concrete panels of a footpath, a dowel adapted to extend through the sideform for transferring load between the adjacent concrete panels, and a sleeve as claimed in any one of claims 1 to 6.
AU2019264625A 2018-11-19 2019-11-14 Dowel sleeve Active AU2019264625B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
GB2106799.6A GB2593100B (en) 2018-11-19 2019-11-15 Dowel sleeve
PCT/US2019/061727 WO2020106572A1 (en) 2018-11-19 2019-11-15 Dowel sleeve

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2018904421A AU2018904421A0 (en) 2018-11-19 Dowel sleeve
AU2018904421 2018-11-19

Publications (2)

Publication Number Publication Date
AU2019264625A1 AU2019264625A1 (en) 2020-06-04
AU2019264625B2 true AU2019264625B2 (en) 2025-06-26

Family

ID=70847882

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2019264625A Active AU2019264625B2 (en) 2018-11-19 2019-11-14 Dowel sleeve

Country Status (2)

Country Link
AU (1) AU2019264625B2 (en)
GB (1) GB2593100B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102024123857A1 (en) * 2024-08-21 2025-08-21 Exte Gmbh Joint profile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6502359B1 (en) * 2000-02-22 2003-01-07 Bometals, Inc. Dowel placement apparatus for concrete slabs
US20060275078A1 (en) * 2003-08-13 2006-12-07 Shaw & Sons, Inc. Plate concrete dowel system
JP2007297802A (en) * 2006-04-28 2007-11-15 Fujita Corp Dough concrete tools
US20180202145A1 (en) * 2017-01-16 2018-07-19 Midwest Concrete & Masonry Supply, Inc. Floor dowel sleeve for concrete slab seams

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6502359B1 (en) * 2000-02-22 2003-01-07 Bometals, Inc. Dowel placement apparatus for concrete slabs
US20060275078A1 (en) * 2003-08-13 2006-12-07 Shaw & Sons, Inc. Plate concrete dowel system
JP2007297802A (en) * 2006-04-28 2007-11-15 Fujita Corp Dough concrete tools
US20180202145A1 (en) * 2017-01-16 2018-07-19 Midwest Concrete & Masonry Supply, Inc. Floor dowel sleeve for concrete slab seams

Also Published As

Publication number Publication date
GB2593100A (en) 2021-09-15
GB2593100B (en) 2023-08-02
AU2019264625A1 (en) 2020-06-04
GB202106799D0 (en) 2021-06-30

Similar Documents

Publication Publication Date Title
US12291860B2 (en) Formwork panel
EP2365150B1 (en) Lost shuttering
US8186645B2 (en) Tilt-up concrete form brace
CN102245838B (en) Concrete Casting Elements
US20090158682A1 (en) Screed Rail
AU2019264625B2 (en) Dowel sleeve
AU2019264622C1 (en) Corrosion-free dowel
US20180135298A1 (en) Method and Apparatus For Reducing Propagation of Cracks in Concrete
AU2019264628B2 (en) Articulating dowel system
AU2019264630B2 (en) Capping
AU2019264629B2 (en) Formwork panel
JPS61200271A (en) Connection and pressure dispersing element for concrete structural member
WO2020106578A1 (en) Support bracket
WO2020106576A1 (en) Capping
WO2020106575A1 (en) Formwork panel
WO2020106574A1 (en) Articulating dowel system
WO2020106572A1 (en) Dowel sleeve
WO2020106571A1 (en) Corrosion-free dowel
AU2012200336A1 (en) Screed Rail
KR102828499B1 (en) Waterstop with L-shaped wings
AU2011221391A1 (en) Screed Rail
JPH0674685U (en) Gutter block that can also be used as a retaining wall

Legal Events

Date Code Title Description
MK25 Application lapsed reg. 22.2i(2) - failure to pay acceptance fee
NB Applications allowed - extensions of time section 223(2)

Free format text: THE TIME IN WHICH TO PAY THE ACCEPTANCE FEE HAS BEEN EXTENDED TO 26 OCT 2025

FGA Letters patent sealed or granted (standard patent)