AU2014201376A1 - A method and system for controlling the initiation of a freeze cycle pre-set time in an ice maker - Google Patents

A method and system for controlling the initiation of a freeze cycle pre-set time in an ice maker Download PDF

Info

Publication number
AU2014201376A1
AU2014201376A1 AU2014201376A AU2014201376A AU2014201376A1 AU 2014201376 A1 AU2014201376 A1 AU 2014201376A1 AU 2014201376 A AU2014201376 A AU 2014201376A AU 2014201376 A AU2014201376 A AU 2014201376A AU 2014201376 A1 AU2014201376 A1 AU 2014201376A1
Authority
AU
Australia
Prior art keywords
water
temperature
freeze
time
condenser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2014201376A
Other versions
AU2014201376B2 (en
Inventor
Daryl Erbs
Zhang Lei
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Welbilt Foodservice Companies LLC
Original Assignee
Manitowoc Foodservice Companies Inc
Manitowoc Foodservice Companies LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Manitowoc Foodservice Companies Inc, Manitowoc Foodservice Companies LLC filed Critical Manitowoc Foodservice Companies Inc
Publication of AU2014201376A1 publication Critical patent/AU2014201376A1/en
Application granted granted Critical
Publication of AU2014201376B2 publication Critical patent/AU2014201376B2/en
Ceased legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C1/00Producing ice
    • F25C1/12Producing ice by freezing water on cooled surfaces, e.g. to form slabs
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C1/00Producing ice
    • F25C1/04Producing ice by using stationary moulds
    • F25C1/045Producing ice by using stationary moulds with the open end pointing downwards
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2116Temperatures of a condenser
    • F25B2700/21163Temperatures of a condenser of the refrigerant at the outlet of the condenser
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2600/00Control issues
    • F25C2600/02Timing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25CPRODUCING, WORKING OR HANDLING ICE
    • F25C2700/00Sensing or detecting of parameters; Sensors therefor
    • F25C2700/14Temperature of water

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Production, Working, Storing, Or Distribution Of Ice (AREA)

Abstract

A novel control logic for an individual cube spray type ice machine. The duration of the freeze cycle is able to adapt to changes in inlet water temperature, changes in ambient air temperature, and the impact of warm temperatures of internal ice making parts within the ice machine due to off cycle periods. This is accomplished through a combination of starting a freeze time period only after the water temperature for the volume of water circulating over the evaporator has reached approximately 00C (32'F), and a freeze time period value that is a function of the refrigerant temperature leaving the condenser at the time where the water reaches approximately 00C (32'F). 530 Start Freeze Sequence 502 Monitor Water Sump Temperature within 504 Yes Measure Refrigerant 506 Temp Leaving Condenser Determine Remaining Freeze 508 Time from Stored Table of Time vs. Refrigerant Temp 510 Start Freeze Countdown Timer Monitor Freeze T imer Value No 514 Timer Value = 0? Yes 516- Start Harvest Sequence

Description

1 A METHOD AND SYSTEM FOR CONTROLLING THE INITIATION OF A FREEZE CYCLE PRE-SET TIME IN AN ICE MAKER BACKGROUND FIELD [0001] The present disclosure relates to a method and system for controlling a freeze cycle in an ice making machine. DISCUSSION OF THE BACKGROUND ART [0002] Inlet water temperature has a significant impact on the time required to freeze a full cube in a spray machine evaporator due to the sensible heat removal required for the entire volume of water and the relatively large volume of water relative to ice produced in each batch for a spray machine. [0003] The reference to prior art in this specification is not and should not be taken as an acknowledgment or any form of suggestion that the referenced prior art forms part of the common general knowledge in Australia or in any other country. [0004] During extended off cycles, the evaporator, pump, and various components that make up the water circulation system warm up to a much higher temperature than the average during repetitive freeze and harvest cycles. In addition, refrigerant migrates to the colder sections of the refrigeration system during off times. This results in significantly longer periods of time for the refrigeration system to chill the water volume and evaporator to the freezing point during the first freeze cycle following an off cycle when compared to repetitive freeze and harvest cycles. [0005] Conventional control strategies for spray machines set the freeze cycle time to a fixed value once a thermostat detects the evaporator temperature has reached a predetermined value. This results in partially formed ice cubes during the first cycle following an off cycle, or when the inlet water is higher than average.
2 [0006] Thus, there is a need for a method and system that controls a freeze cycle of an ice making machine that may have enhanced efficiency and reduced energy usage. [0007] The present disclosure also provides many additional alternatives or advantages, which shall become apparent as described below. [0008] In the specification the term "comprising" shall be understood to have a broad meaning similar to the term "including" and will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. This definition also applies to variations on the term "comprising" such as "comprise" and "comprises". SUMMARY [0009] A method and system of the present disclosure monitors the water temperature in a sump and refrigerant temperature exiting a condenser so that a start time of a freeze cycle/sequence is delayed until the water temperature reaches a predetermined value and a freeze cycle time period value based upon the temperature of the refrigerant is attained, thereby producing ice much more efficiently and saving energy. [0010] The duration of the freeze cycle is able to adapt to changes in inlet water temperature, changes in ambient air temperature, and the impact of warm temperatures of internal ice making parts within the ice machine due to off cycle periods. This is accomplished through a combination of starting a freeze time period only after the water temperature for the volume of water circulating over the evaporator has reached approximately 0 0 C (32"F), and a freeze time period value that is a function of the liquid temperature leaving the condenser at the time where the water reaches approximately 0 0 C (32"F).
3 [0011] In an embodiment of an ice making machine of the present disclosure, a heat exchange system comprises an evaporator and a condenser configured to make ice pieces with water applied to the evaporator during a freeze cycle. A controller controls a start time and an end time of the freeze cycle so that the start time begins only if a temperature of the water is 0 0 C (32'F) or lower and the end time is based on a temperature of refrigerant exiting the condenser when the start time begins. [0012] In another embodiment of the ice making machine according to the present disclosure, the end time is determined from a table of time versus condenser refrigerant exit temperatures at a time when the water is approximately 0 0 C (32'F). [0013] In another embodiment of the ice making machine according to the present disclosure, the heat exchanger system further comprises one or more sprayers that spray the water on the evaporator. [0014] In another embodiment of the ice making machine according to the present disclosure, a first temperature sensor is located in the water and a second temperature sensor is located to sense the temperature of the refrigerant exiting the condenser. The start and end times are determined based on temperatures sensed by the first and second temperature sensors. [0015] In another embodiment of the ice making machine according to the present disclosure, a processor and program module are associated with the controller. The processor executes instructions of the program module to determine the start time and the end time of the freeze cycle. [0016] An embodiment of a method for making ice with an ice making machine of the present disclosure, the method comprises: configuring an evaporator and a condenser to make ice pieces with water applied to the evaporator during a freeze cycle; 4 controlling a start time of the freeze cycle to begin only if a temperature of the water is 0 0 C (32'F)32 degrees F or lower; and controlling an end time of the freeze cycle based on a temperature of refrigerant exiting the condenser when the start time begins. [0017] In another embodiment of the method of ice making according to the present disclosure, the method further comprises: determining the end time from a table of time versus condenser refrigerant exit temperatures at a time when the water is approximately 0 0 C (32'F). [0018] In another embodiment of the method of ice making according to the present disclosure, the method further comprises: locating a first temperature sensor to sense a temperature of the water; and locating a second temperature sensor to sense a temperature of refrigerant exiting the condenser. The start and end times are determined based on the temperatures sensed by the first and second temperature sensors. [0019] In another embodiment of the method of ice making according to the present disclosure, the method further comprises: executing instructions of a program module to determine the start time and end time of the freeze cycle. [0020] In another embodiment of the method of ice making according to the present disclosure, the method further comprises: spraying the water on the evaporator. [0021] Further objects, features and advantages of the present disclosure will be understood by reference to the following drawings in which like reference numbers refer to like elements. BRIEF DESCRIPTION OF THE DRAWINGS [0022] Fig. 1 is a schematic representation of a spray-type ice making machine according to the present disclosure.
5 [0023] Fig. 2 is a schematic representation of a cross-sectional view along line 2-2 of Fig. 1; [0024] Fig. 3 is a schematic representation of water being sprayed during a freeze cycle on an evaporator of the ice making machine of Fig. 1. [0025] Fig. 4 is a block diagram of a computer system for control of freeze cycles of the ice making machine of Fig. 1. [0026] Fig. 5 is a logic or flow diagram for control of the freeze cycles of the ice making machine of Fig. 1. [0027] Fig. 6 is a schematic representation depicting a temperature sensor disposed at the exit of a condenser of the ice making machine of Fig. 1. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT [0028] The impact of the warm internal components and refrigerant migration following an off cycle is eliminated by starting the freeze cycle period at a 0 0 C (32"F) water condition, which makes the first freeze cycle and all subsequent freeze cycles have essentially the same temperature conditions at the start of the timed freeze period. [0029] The use of the refrigerant temperature leaving the condenser at the point in time that the water has reached 0 0 C (32 0 F)means that the effect of the evaporator load has been standardized, and so the condenser leaving temperature is almost entirely due to the ambient temperature for the condenser cooling medium (air or water) and the relative efficiency of the condenser. The evaporator heat removal capacity is strongly correlated to the liquid temperature, since it represents the enthalpy of the refrigerant entering the evaporator, and the time required to freeze a full cube in the evaporator once the water has reached 0 0 C (32"F) is directly related to the enthalpy of the entering refrigerant. This relationship provides an accurate method for setting freeze time from the point where the water has reached 0 0 C (32"F). [0030] Referring to Fig. 1, an ice making machine 100 includes a freeze cycle/sequence controller of the present disclosure. The ice making machine 100 makes and stores ice.
6 [0031] Referring to Fig. 2, ice making machine 100 comprises a door 105 in a closed position, an ice storage area 110 and an ice making system 115. Ice storage area 110 has a bin 120 that holds ice cubes. Ice making system 115 makes ice cubes, and dispenses the ice cubes into bin 120. Ice making machine 100 comprises an evaporator 2, spray assembly 3, water temperature sensor 4 and water trough or sump 130. [0032] Referring to Fig. 3 there is shown an illustrative diagram of ice making system 115 of ice making machine 100 during a freeze cycle. Ice making system 115 has a housing 117 enclosing a housing volume 116. Housing 117 has an opening 119 therethrough covered by gate 125. Housing 117 has a bottom portion that forms a sump 130 and a drain 135. Temperature sensor 4 is located in sump 130. A top portion of housing 117 forms cups 140. Each of cups 140 surrounds an interior volume. Housing 117 has a water inlet 145 having apertures 146 that receives water from a water supply through a water supply tube 150. Water supply tube 150 has a valve 151, for example, a solenoid valve that opens to allow water from a water supply to flow through supply tube 150, and closes to block water from flowing through supply tube 150. The water supply, for example, is a public water supply. [0033] A pump 155 is disposed in housing volume 116. Pump 155 has a pump chamber 165 and a pump tube 170. Pump tube 170 is connected to pump tube outlets 175. Pump tube outlets 175 are connected to a mount 180 positioning pump tube outlets 175 in housing volume 116 above a baffle 185. [0034] Ice making system 115 has a heat exchange system that performs a vapor compression cycle in thermal communication with housing 117. The heat exchange system includes an evaporator 2 having an evaporator tube 190, a compressor (not shown), a condenser 604 (see Fig. 6) and a thermal expansion 7 valve (not shown). The evaporator tube 190 is in thermal communication with the interior volume of cups 140. [0035] As shown in Fig. 6, condenser 604 has a liquid line 600 leaving condenser 604, wherein a temperature sensor 620 (shown in Fig. 4) is disposed under insulation sleeve (black foam) 608 disposed before condenser coil 602. [0036] During a freeze cycle, a controller 107 activates pump 155 that generates suction drawing water 160 in sump 130 into pump chamber 165. Pump 155 generates a flow of the water from pump chamber 165 to pump tube 170, for example, by an impeller in pump chamber 165 operated by a motor. The flow in pump tube 170 is directed to pump tube outlets 175, so that the flow generates a spray out of pump tube outlets 175 into cups 140. Controller 107 activates the heat exchange system to flow cooled refrigerant through evaporator tube 190 during the freeze cycle. The evaporator tube 190 is in thermal communication with the interior volume of cups 140 to cool the interior volume of cups 140. At least a portion of the water from the spray dispensed by pump tube outlets 175 freezes in the interior volume of cups 140 forming ice cubes 192. The remaining water from the spray dispensed by pump tube outlets 175 that does not freeze in cups 140 falls away from cups 140 due to gravity onto baffle 185 into sump 130 or directly into sump 130. After a predetermined time period, controller 107 deactivates pump 155 so that water is no longer sprayed into cups 140 and controller 107 deactivates the heat exchange system to stop flow of cooled refrigerant through evaporator tube 190 ending the freeze cycle. Valve 151 is closed to block water from flowing through supply tube 150 during the freeze cycle. [0037] Referring to Fig. 4, a system 400 comprises a computer 405 coupled to a network 420, e.g., the Internet. Computer 405 may be a part of controller 107 or separate from controller 107. In either case, connections between controller 107 and computer 405 allow the freeze cycle sequence to operate.
8 [0038] Computer 405 includes a user interface 410, a processor 415, and a memory 425. Computer 405 may be implemented on a general-purpose microcomputer. Although computer 405 is represented herein as a standalone device, it is not limited to such, but instead can be coupled to other devices (not shown) via network 420. [0039] Processor 415 is configured of logic circuitry that responds to and executes instructions. [0040] Memory 425 stores data and instructions for use by processor 415. Memory 425 may be implemented in a random access memory (RAM), a hard drive, a read only memory (ROM), or a combination thereof. One of the components of memory 425 is a program module 430. [0041] Program module 430 contains instructions for controlling processor 415 to execute for control of the methods described herein, in particular, the control of freeze cycles of ice making machine 100. Program module 430 includes a table 440 of time versus refrigerant temperature (e.g., a look-up table) and a freeze countdown timer 445. The term "module" is used herein to denote a functional operation that may be embodied either as a stand-alone component or as an integrated configuration of a plurality of sub-ordinate components. Thus, program module 430 may be implemented as a single module or as a plurality of modules that operate in cooperation with one another. Moreover, although program module 430 is described herein as being installed in memory 425, and therefore being implemented in software, it could be implemented in any of hardware (e.g., electronic circuitry), firmware, software, or a combination thereof. [0042] User interface 410 includes an input device, such as a keyboard or speech recognition subsystem, for enabling a user to communicate information and command selections to processor 415. User interface 410 also includes an output device such as a display or a printer. A cursor control such as a mouse, track-ball, 9 or joy stick, allows the user to manipulate a cursor on the display for communicating additional information and command selections to processor 415. [0043] Processor 415 outputs, to user interface 410, a result of an execution of the methods described herein. Alternatively, processor 415 could direct the output to a remote device (not shown) via network 420. [0044] While program module 430 is indicated as already loaded into memory 425, it may be configured on a storage medium 435 for subsequent loading into memory 425. Storage medium 435 can be any conventional storage medium that stores program module 430 thereon in tangible form. Examples of storage medium 435 include a floppy disk, a compact disk, a magnetic tape, a read only memory, an optical storage media, universal serial bus (USB) flash drive, a digital versatile disc, or a zip drive. Alternatively, storage medium 435 can be a random access memory, or other type of electronic storage, located on a remote storage system and coupled to computer 405 via network 420. [0045] Referring to Fig. 5, the controller operated freeze sequence according the present disclosure uses processor 415 to execute instructions of program module 430 to control the freeze cycle with steps 530. At the start of freeze cycle, processor 415 initiates the freeze cycle sequence. At step 502, processor 415 monitors the sump water temperature as sensed by temperature sensor 205 of the water in the sump 130. At step 504, processor 415 checks to determine if the water temperature in the sump 130 is about 32F or less. If the water temperature in sump 130 is higher than 32F, then processor 415 returns to step 502. If the water temperature in sump 130 is less than or equal to 32F, then at step 506 processor 415 checks the temperature of the refrigerant leaving the condenser as monitored by condenser temperature sensor 620. At step 508, processor 415 uses the condenser temperature to determine a remaining freeze time from table 440 of time versus refrigerant temperature (i.e. a freeze time period value that is a function of the refrigerant temperature leaving the condenser at the time where the water reaches 10 approximately 0 0 C (32'F). Once the water temperature in sump 130 is equal to or less than 0 0 C (32'F), then processor 415 at step 510 starts freeze countdown timer from the freeze time value determined from look-up table 440. Processor 415 then at step 512 monitors the freeze countdown timer value. At step 514, if the freeze timer value is not equal to a time out value, e.g., zero, steps 512 and 514 are repeated when the countdown freeze timer value is equal to zero, processor 415 at step 516 stops the freeze cycle and starts the harvest cycle or sequence. [0046] Specific data for the relationship between freeze period time and condenser leaving refrigerant temperature will be provided from test data showing the variation in time required for the water to reach 0 0 C (32'F) from the start of the freeze operation for both first cycles following an extended off period, and subsequent freeze cycles during continuous freeze and harvest operation, over a range of ambient and inlet water conditions. [0047] While we have shown and described several embodiments in accordance with our invention, it is to be clearly understood that the same may be susceptible to numerous changes apparent to one skilled in the art. Therefore, we do not wish to be limited to the details shown and described but intend to show all changes and modifications that come within the scope of the appended claims.

Claims (10)

1. An ice making machine comprising: a heat exchange system comprising an evaporator and a condenser configured to make ice pieces with water applied to said evaporator during a freeze cycle; and a controller that controls a start time and an end time of the freeze cycle, wherein the start time begins only if a temperature of said water is 0 degrees Celsius (32 degrees F) or lower and the end time is based on a temperature of refrigerant exiting said condenser when the start time begins.
2. The ice making machine of claim 1, wherein the end time is determined from a table of time versus condenser refrigerant exit temperatures at a time when the water is approximately 0 degrees Celsius (32 degrees F) .
3. The ice making machine of claim 1 or claim 2, wherein said heat exchanger system further comprises one or more sprayers that spray the water on the evaporator.
4. The ice making machine of any one of claims 1 to 3, further comprising a first temperature sensor located in the water and a second temperature sensor located to sense the temperature of the refrigerant exiting the condenser, and wherein the start and end times are determined based on temperatures sensed by the first and second temperature sensors.
5. The ice making machine of any one of claims 1 to 4, further comprising a processor and program module associated with the controller, wherein the processor executes instructions of the program module to determine the start time and the end time of the freeze cycle. 12
6. A method of controlling ice making of an ice making machine comprising: configuring an evaporator and a condenser to make ice pieces with water applied to said evaporator during a freeze cycle; controlling a start time of the freeze cycle to begin only if a temperature of said water is 0 degrees Celsius (32 degrees F) or lower; and controlling an end time of the freeze cycle based on a temperature of refrigerant exiting said condenser when the start time begins.
7. The method of claim 6, further comprising: determining the end time from a table of time versus condenser refrigerant exit temperatures at a time when the water is approximatelyO degrees Celsius (32 degrees F).
8. The method of claim 6 or claim 7, further comprising: locating a first temperature sensor to sense a temperature of the water; locating a second temperature sensor to sense a temperature of refrigerant exiting the condenser, and wherein the start and end times are determined based on the temperatures sensed by the first and second temperature sensors.
9. The method of any one of claims 6 to 8, further comprising: executing instructions of a program module to determine the start time and end time of the freeze cycle.
10. The method of any one of claims 6 to 9, further comprising: spraying the water on the evaporator.
AU2014201376A 2013-03-15 2014-03-11 A method and system for controlling the initiation of a freeze cycle pre-set time in an ice maker Ceased AU2014201376B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361793912P 2013-03-15 2013-03-15
US61/793,912 2013-03-15

Publications (2)

Publication Number Publication Date
AU2014201376A1 true AU2014201376A1 (en) 2014-10-02
AU2014201376B2 AU2014201376B2 (en) 2016-07-14

Family

ID=50276979

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2014201376A Ceased AU2014201376B2 (en) 2013-03-15 2014-03-11 A method and system for controlling the initiation of a freeze cycle pre-set time in an ice maker

Country Status (7)

Country Link
US (1) US20140260349A1 (en)
EP (1) EP2778570A3 (en)
KR (1) KR20140113885A (en)
CN (1) CN104048459A (en)
AU (1) AU2014201376B2 (en)
IN (1) IN2014DE00734A (en)
TW (1) TW201447203A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TR201710070A1 (en) * 2017-07-07 2019-01-21 Vestel Beyaz Esya Sanayi Ve Ticaret Anonim Sirketi Working method for refrigeration devices.
US10801768B2 (en) * 2018-08-06 2020-10-13 Haier Us Appliance Solutions, Inc. Ice making assemblies for making clear ice
KR102696156B1 (en) * 2018-12-12 2024-08-19 엘지전자 주식회사 Ice machine
CN110631299B (en) * 2019-09-24 2021-08-24 合肥美的电冰箱有限公司 Ice maker and control method and device thereof
CN116911074B (en) * 2023-09-11 2024-01-16 潍柴动力股份有限公司 Method and device for determining opening time of pre-cooling bin of frozen sand mold and pre-cooling bin

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55146369A (en) * 1979-05-02 1980-11-14 Sanyo Electric Co Ice making machine
US4257237A (en) * 1979-05-15 1981-03-24 King-Seeley Thermos Co. Electrical control circuit for ice making machine
US4373345A (en) * 1981-04-08 1983-02-15 Lewis Tyree Jr Ice-making and water-heating
JP2503424B2 (en) * 1986-07-17 1996-06-05 株式会社豊田自動織機製作所 Method of controlling evaporation temperature in refrigeration cycle
US4774814A (en) * 1986-09-05 1988-10-04 Mile High Equipment Company Ice making machine
US4947653A (en) * 1989-06-26 1990-08-14 Hussmann Corporation Ice making machine with freeze and harvest control
US5090210A (en) * 1990-03-12 1992-02-25 Sanyo Electric Co., Ltd. Control system for ice making apparatuses
JP2854078B2 (en) * 1990-03-12 1999-02-03 三洋電機株式会社 Operation control device for ice machine
JP3071073B2 (en) * 1993-07-23 2000-07-31 三洋電機株式会社 Ice machine
US5653114A (en) * 1995-09-01 1997-08-05 Nartron Corporation Method and system for electronically controlling the location of the formation of ice within a closed loop water circulating unit
US5878583A (en) * 1997-04-01 1999-03-09 Manitowoc Foodservice Group, Inc. Ice making machine and control method therefore
JP2002277121A (en) * 2001-03-19 2002-09-25 Sanyo Electric Co Ltd Cell type ice maker
US6601399B2 (en) * 2001-07-09 2003-08-05 Hoshizaki Denki Kabushiki Kaisha Ice making machine
US7281386B2 (en) * 2005-06-14 2007-10-16 Manitowoc Foodservice Companies, Inc. Residential ice machine
KR101156905B1 (en) * 2009-09-30 2012-06-21 웅진코웨이주식회사 Ice-maker and controlling method thereof

Also Published As

Publication number Publication date
CN104048459A (en) 2014-09-17
AU2014201376B2 (en) 2016-07-14
EP2778570A2 (en) 2014-09-17
KR20140113885A (en) 2014-09-25
IN2014DE00734A (en) 2015-06-19
EP2778570A3 (en) 2016-08-17
TW201447203A (en) 2014-12-16
US20140260349A1 (en) 2014-09-18

Similar Documents

Publication Publication Date Title
CN107726712B (en) Refrigerator control method and refrigerator using the same
JP3636602B2 (en) refrigerator
EP3540342B1 (en) Refrigerator and method for controlling refrigerator
US10323874B2 (en) Attachment system for an ice maker
CN113720078B (en) Refrigerator and refrigerator control method
US20140260349A1 (en) Method and system for controlling the initiation of a freeze cycle pre-set time in an ice maker
KR20160053502A (en) Defrost device, refrigerator having the device and control method thereof
US20170219277A1 (en) Refrigerator and method of controlling the same
CN109764632B (en) Refrigerator and refrigeration control method and device thereof
CN109764631B (en) Refrigerator and refrigeration control method and device thereof
EP3759408B1 (en) Refrigerator and controlling method for the same
CN110873504B (en) Refrigerator defrost control method and refrigerator
CN109923357A (en) Refrigerator and its control method
JP5417397B2 (en) refrigerator
US20150362246A1 (en) Refrigerator appliance and a method for operating a refrigerator appliance
CN114294890B (en) Refrigerator and ice making control method thereof
WO2020142931A1 (en) Refrigerator and method and device for controlling refrigeration thereof
CN115773620B (en) Refrigerator control method, storage medium and refrigerator
US20180329437A1 (en) Systems and methods for refrigerator control
KR20060003397A (en) Water supply control device and water supply control method of automatic ice maker
JPH10205980A (en) refrigerator
US20140190188A1 (en) Refrigerator appliance
WO2005038364A1 (en) Cooling storage chamber and cooling equipment
CN111503966A (en) Refrigerator and ice making method and device thereof
CN113366269A (en) Refrigeration device with parallel-connected evaporators and operating method therefor

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)
MK14 Patent ceased section 143(a) (annual fees not paid) or expired