[go: up one dir, main page]

AU2011260627A1 - A vehicle combination for transporting rails - Google Patents

A vehicle combination for transporting rails Download PDF

Info

Publication number
AU2011260627A1
AU2011260627A1 AU2011260627A AU2011260627A AU2011260627A1 AU 2011260627 A1 AU2011260627 A1 AU 2011260627A1 AU 2011260627 A AU2011260627 A AU 2011260627A AU 2011260627 A AU2011260627 A AU 2011260627A AU 2011260627 A1 AU2011260627 A1 AU 2011260627A1
Authority
AU
Australia
Prior art keywords
vehicle
crane
load
carrier
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
AU2011260627A
Other versions
AU2011260627B2 (en
Inventor
Alois Eder
Peter Hechenberger
Markus Reitmeyer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Robel Bahnbaumaschinen GmbH
Original Assignee
Robel Bahnbaumaschinen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robel Bahnbaumaschinen GmbH filed Critical Robel Bahnbaumaschinen GmbH
Publication of AU2011260627A1 publication Critical patent/AU2011260627A1/en
Application granted granted Critical
Publication of AU2011260627B2 publication Critical patent/AU2011260627B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/36Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
    • B66C23/50Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes mounted on railway vehicles, e.g. breakdown cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Jib Cranes (AREA)
  • Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)
  • Body Structure For Vehicles (AREA)

Abstract

A vehicle train (1) serves for transporting rails (2) and to deposit them on a track (6), wherein the rails are mounted on a loading platform (8) of a first vehicle (3) having a load crane (9), and the rails are deposited on a coupled second vehicle (4). Each vehicle (3, 4) is assigned a load carrier (11, 12) which serves as an upper boundary with respect to a vertical, is positioned centrally with respect to a lateral direction of the vehicle, runs in a longitudinal direction (10) of the vehicle and has first and second carrier ends (16, 17) with respect to said longitudinal direction (10). A crane rail (19) which runs in the longitudinal direction of the vehicle and has the purpose of displacing the load crane (9) is provided on each load carrier, wherein a crane rail bridge (20) for connecting the two crane rails (19) is arranged between the two adjoining load carriers (11, 12). The crane rail bridge (20) is of variable design with respect to a bridge length (21) which runs in the longitudinal direction of the vehicle. The load carrier (11) of the first vehicle (3) is respectively connected at the first and second carrier ends (16, 17) to the vehicle frame (13) by a frame carrier (18), wherein the two frame carriers (18) are spaced apart from one another at a distance (a) which corresponds at least to a length (b) of the rails (2) which are to be transported.

Description

1/7 A vehicle combination for transporting rails [01] The invention relates to a vehicle combination for transporting rails and laying the same upon a track, wherein the rails are stored on a loading platform of a first vehicle having a load crane, and the rail laying is carried out on a second vehicle coupled to the former. [02] According to EP 0 721 026 B1, a vehicle combination of this type is already known in which the first vehicle is designed as a flat wagon while the second vehicle has an upwardly recessed frame under which there is a work area open towards the track. A gantry crane is mobile on running rails along both vehicles in order to transport materials such as rails, for example, from the loading platform to the work area and lay them down there. [03] AT 009 393 U1 describes a track maintenance construction train, consisting of vehicles coupled to one another, which has lifting devices for transporting cargo, the lifting devices being designed for displacement in the longitudinal direction of the vehicle between a loading space on one vehicle and a work space provided on the other vehicle.
2/7 [04] It is the object of the present invention to create a vehicle combination of the type mentioned at the beginning which, in an advantageous manner, enables working operations to be carried out in manifold ways. [05] According to the invention, this object is achieved with a vehicle combination of the specified kind by means of the features cited in the characterising part of claim 1. [06] A design of this manner enables an unobstructed mobility of the load crane, together with the rail to be unloaded, along practically the entire length of the vehicle combination, i.e. even on track construction sites which are located in a track curve or in which a track superelevation exists. [07] Additional advantages of the invention become apparent from the dependent claims and the drawing description. [08] The invention will be described in more detail below with reference to an embodiment represented in the drawing in which [09] Fig. 1 is a side view - shown in two parts due to space restrictions - of a vehicle combination designed according to the invention, and Fig. 2 shows a cross-section of the vehicles.
3/7 [10] A vehicle combination 1, visible in Figs. 1 and 2, for transporting rails 2 consists of a first vehicle 3 and, coupled to the same, a second vehicle 4 which are mobile together via on-track undercarriages 5 on a track 6 and have work cabins 7 arranged at each end. Provided on a vehicle frame 13 of the first vehicle 3 is a loading platform 8 on which the rails 2 (or also other work materials) are stored during transport, which then are laid down in the track 6 in the region of the second vehicle 4 with the aid of a load crane 9 to be described in more detail below. [11] Associated with each of the vehicles 3, 4 is a beam-shaped load carrier 11, 12, extending in a longitudinal direction 10 of the vehicle, which serves as an upper boundary of the vehicle - with regard to a vertical and is positioned centrally with regard to a transverse direction 15 of the vehicle (Fig. 2). Each load carrier 11, 12 has a first and second carrier end 16, 17 and is connected at said ends, respectively, by means of a frame carrier 18 to the vehicle frame 13 or 14 of the vehicles 3, 4. In this, the two frame carriers 18 of the first vehicle 3 are spaced from one another at a distance (a) which is configured to correspond to at least a length (b) of the rail 2 to be transported. [12] Additionally arranged on each load carrier 11 and 12 are crane rails 19 which extend in the longitudinal direction 10 of the vehicle and are provided for the longitudinally displaceable support of the load crane 9.
4/7 Located in the region between the two adjoining load carriers 11 and 12 of the two vehicles 3 and 4 is a crane rail bridge 20 which serves for articulatedly connecting the crane rails 19 of the load carriers 11 and 12 and which is further designed to be changeable with regard to a bridge length 21 extending in the longitudinal direction 10 of the vehicle. Thus, the unobstructed displaceability of the load crane 9 along the vehicle combination 1 is guaranteed even when working in a track curve. [13] As can be seen in Fig. 2, the load crane 9 has the shape of trolleys 22 which are fastened to a crane beam 23, extending in the transverse direction 15 of the vehicle, and are displaceable relative to the same in a transverse track 24. The crane beam 23, in turn, is designed for displacement in the longitudinal direction 10 of the vehicle along the crane rails 19 by means of track rollers 27 and additionally has an auxiliary rail 25 which is displaceable relative to the crane beam 23 in the transverse direction 15 of the vehicle and serves for elongating the transverse track 24. [14] As also shown in Fig. 2, the load carrier 12 of the second vehicle 4 is connected to two vehicle side walls 26 which are adjustable relative to the load carrier 12 as well as relative to one another in the transverse direction 15 of the vehicle. Thus (as shown on the left-hand side in Fig. 2), when the side wall 26 is extended and the transverse track 24 is 5/7 simultaneously extended, the corresponding trolley 22 can be moved further out in order to be able, for example, to deposit the load far enough outward even when working in a super-elevated track. The two side walls 26 delimit a work space 28 in which working personnel may be present for receiving a rail 2 brought on by the load crane 9 and for installing the same in the track 6. Thus, an interference-free rail transport and optimal safety for the working personnel is ensured even when an adjacent track is in operation. [15] In the region of the two adjoining carrier ends 16, 17 of the two load carriers 11 and 12, the associated frame carriers 18 for connection to the vehicle frames 13 or 14 are arranged spaced far enough from one another in the transverse direction 15 of the vehicle so that the crane beam 23 can pass without problems through the portal thus formed.

Claims (5)

1. A vehicle combination for transporting rails (2) and laying the same upon a track (6), wherein the rails (2) are stored on a loading platform (8) of a first vehicle (3) having a load crane (9), and the rail laying is carried out on a second vehicle (4) coupled to the former, characterized by the following features: a) associated with each vehicle (3, 4) is a load carrier (11, 12), extending in a longitudinal direction (10) of the vehicle and having a first and second carrier end (16, 17) with regard to said direction, which is positioned centrally with regard to a transverse direction (15) of the vehicle and serves as an upper boundary with regard to a vertical; b) a crane rail (19) extending in the longitudinal direction (10) of the vehicle is provided on each load carrier (11, 12) for displacement of the load crane (9), wherein a crane rail bridge (20) for connecting the two crane rails (19) is arranged between the two adjoining load carriers (11, 12); c) the crane rail bridge (20) is designed to be changeable with regard to a bridge length (21) extending in the longitudinal direction (10) of the vehicle; d) the load carrier (11) of the first vehicle (3) is connected to the vehicle frame (13) at the first and second carrier end (16, 17), respectively, by means of a frame carrier (18), wherein the two frame carriers (18) are spaced from one another at a distance (a) corresponding to at least a length (b) of the rails (2) to be transported. 7/7
2. A vehicle combination according to claim 1, characterized in that the two adjoining carrier ends (16, 17) of the two load carriers (11, 12) are connected to the vehicle frame (13, 14) in each case by means of two frame carriers (18) spaced from one another in the transverse direction (15) of the vehicle.
3. A vehicle combination according to claim 1 or 2, characterized in that the load carrier (12) of the second vehicle (4) is connected to two vehicle side walls (26) which are displaceable in the transverse direction (15) of the vehicle relative to the load carrier (12) as well as relative to one another
4. A vehicle combination according to claim 1, 2 or 3, characterized in that the load crane (9) is fastened to a crane beam (23), displaceable along the crane rail (19) and extending in the transverse direction (15) of the vehicle, and is displaceable relative to the same in a transverse track (24).
5. A vehicle combination according to claim 4, characterized in that the crane beam (23) has an auxiliary rail (25) for elongating the transverse track () the auxiliary rail (25) being displaceable relative to the crane beam (23) in the transverse direction (15) of the vehicle.
AU2011260627A 2010-06-04 2011-05-16 A vehicle combination for transporting rails Active AU2011260627B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE102010022679.3 2010-06-04
DE201010022679 DE102010022679A1 (en) 2010-06-04 2010-06-04 Vehicle combination for transporting rails
PCT/EP2011/002407 WO2011151015A1 (en) 2010-06-04 2011-05-16 Vehicle train for transporting rails

Publications (2)

Publication Number Publication Date
AU2011260627A1 true AU2011260627A1 (en) 2013-01-24
AU2011260627B2 AU2011260627B2 (en) 2015-06-04

Family

ID=44462117

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2011260627A Active AU2011260627B2 (en) 2010-06-04 2011-05-16 A vehicle combination for transporting rails

Country Status (11)

Country Link
EP (1) EP2576908B1 (en)
JP (1) JP5818880B2 (en)
CN (1) CN102933768B (en)
AU (1) AU2011260627B2 (en)
DE (1) DE102010022679A1 (en)
DK (1) DK2576908T3 (en)
ES (1) ES2594363T3 (en)
HU (1) HUE030843T2 (en)
PL (1) PL2576908T3 (en)
SI (1) SI2576908T1 (en)
WO (1) WO2011151015A1 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2997709B1 (en) * 2012-11-08 2015-04-24 Geismar Ancien Ets L TRANSPORT LOADING TRAIN
CN102936869A (en) * 2012-11-28 2013-02-20 中国北车集团沈阳机车车辆有限责任公司 Steel rail locking device and long steel rail locking vehicle
DE202013004729U1 (en) * 2013-05-18 2013-07-19 Robel Bahnbaumaschinen Gmbh Schienenladezug
FR3019792B1 (en) * 2014-04-09 2017-12-22 Transalp Renouvellement VEHICLE FOR LOADING AND UNLOADING METAL BARS SUCH AS RAILS
CN104477185B (en) * 2014-11-05 2016-09-21 中国铁路总公司 Orbit connection device and gapless line transport trainset
DE102016000408A1 (en) 2016-01-14 2017-07-20 Robel Bahnbaumaschinen Gmbh Maintenance vehicle and procedure.
DE202016000509U1 (en) * 2016-01-27 2016-03-02 Robel Bahnbaumaschinen Gmbh maintenance vehicle
AT518062B1 (en) * 2016-02-15 2017-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction vehicle for carrying out track construction work
AT15568U1 (en) * 2016-08-03 2018-01-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction vehicle for picking up and / or laying track rails
CN109204070B (en) * 2017-06-30 2021-09-21 比亚迪股份有限公司 Conductor rail moving mechanism and engineering truck with same
CN107246274B (en) * 2017-08-14 2019-02-15 中国十九冶集团有限公司 Track turnover method of formwork trolley for pipe gallery construction
CN107386020A (en) * 2017-08-21 2017-11-24 中铁上海工程局集团有限公司 One kind zig zag tunnel track-laying vehicle
DE102018003889A1 (en) 2018-05-15 2019-11-21 Robel Bahnbaumaschinen Gmbh Trackable transport cart
CN112482102B (en) * 2020-11-17 2023-03-28 中铁十七局集团有限公司铺架分公司 Prefabricated floating plate transportation positioning vehicle and positioning method thereof
CN119873621B (en) * 2025-03-17 2025-07-01 中车沈阳机车车辆有限公司 Modularized urban rail steel rail vehicle, urban rail steel rail vehicle set and rail collecting and unloading method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US397577A (en) * 1889-02-12 anderson
DE1920527A1 (en) * 1969-04-23 1970-11-05 Krupp Gmbh Gleisjoch laying crane
DE59508811D1 (en) 1995-01-03 2000-11-30 Plasser Bahnbaumasch Franz Machine and system for performing track construction work
DE19506856C2 (en) * 1995-02-14 2000-06-08 Mannesmann Ag Track-bound mobile crane
AT6158U3 (en) * 2003-01-29 2004-03-25 Plasser Bahnbaumasch Franz MACHINE FOR TREATING A TRACK
DE202004013732U1 (en) * 2004-09-03 2004-12-16 Robel Bahnbaumaschinen Gmbh maintenance vehicle
JP2006348576A (en) * 2005-06-16 2006-12-28 Sho Bond Constr Co Ltd Rail laying device in tunnel
AT9393U1 (en) 2006-06-28 2007-09-15 Robel Bahnbaumaschinen Gmbh TRAIN CONSTRUCTION FOR THE MAINTENANCE OF A TRAIL
CN101125628A (en) * 2007-09-25 2008-02-20 贵州省桥梁工程总公司 Door type floating crane
DE202009009728U1 (en) * 2009-07-15 2009-10-01 Db Gleisbau Gmbh Vehicle for carrying out construction work in the railway track area
DE202009014493U1 (en) * 2009-10-27 2010-02-04 Robel Bahnbaumaschinen Gmbh Vehicle for maintenance of a track

Also Published As

Publication number Publication date
AU2011260627B2 (en) 2015-06-04
ES2594363T3 (en) 2016-12-19
DE102010022679A1 (en) 2011-12-08
CN102933768B (en) 2015-05-20
WO2011151015A1 (en) 2011-12-08
JP5818880B2 (en) 2015-11-18
CN102933768A (en) 2013-02-13
HUE030843T2 (en) 2017-06-28
DK2576908T3 (en) 2016-10-24
JP2013528725A (en) 2013-07-11
EP2576908B1 (en) 2016-07-13
PL2576908T3 (en) 2016-12-30
SI2576908T1 (en) 2016-12-30
EP2576908A1 (en) 2013-04-10

Similar Documents

Publication Publication Date Title
AU2011260627B2 (en) A vehicle combination for transporting rails
US4249467A (en) Mobile apparatus for receiving and laying as assembled track switch or crossing section
US10808363B2 (en) Maintenance vehicle
SU1554774A3 (en) Apparatus for carrying and replacing sleepers of railway track
CZ350395A3 (en) Machine for carrying out works during track building
CN113370727A (en) New energy double-walking system rail transport equipment and use method
CN111133172A (en) Transport and transport system for tunnel buildings
CN105229232B (en) The rail luggage with the clamping device for rail section bar of rail for transporting longitudinal measure lists car
CN103469705B (en) Section of track track-laying machine and method of laying a railway track thereof
CN112252099B (en) Working vehicle for railway turnout paving and replacing and working method thereof
CZ273487A3 (en) Mobile device for removing or lying, as well as transport of track panels
CN203821184U (en) Spreader used for separating and paving roadbed slabs
EA008547B1 (en) Machine and method for transporting points
CN104695338A (en) Multi-oil-cylinder-supporting-leg combination type low-position girder transporting vehicle with girder erection supports
CN201849911U (en) Conveying device for heavy equipment
KR100711086B1 (en) Temporary equipment and improvement method for girder improvement of plate bridge for railway bridge
IT201800010926A1 (en) INTERMODAL RAILWAY WAGON
JPH10184293A (en) Transport equipment used in tunnel construction
GB2486524A (en) Method and vehicle for transporting rail track and sleepers
CN114775344A (en) Railway line component replacing operation method
JP6840160B2 (en) Track construction vehicle for track construction work
US10822210B2 (en) Rail vehicle having crane rails for a gantry crane
CN105350453B (en) Method for hoisting mountain land overhead pedestrian way
CN104195897A (en) Technology of laying transport rails with track skeletons
CN113756210B (en) Device and method for self-transporting and installing top box girders across adjacent cover girders

Legal Events

Date Code Title Description
DA3 Amendments made section 104

Free format text: THE NATURE OF THE AMENDMENT IS: AMEND THE INVENTION TITLE TO READ A VEHICLE COMBINATION FOR TRANSPORTING RAILS

FGA Letters patent sealed or granted (standard patent)