AU2009281696A1 - Mining system - Google Patents
Mining system Download PDFInfo
- Publication number
- AU2009281696A1 AU2009281696A1 AU2009281696A AU2009281696A AU2009281696A1 AU 2009281696 A1 AU2009281696 A1 AU 2009281696A1 AU 2009281696 A AU2009281696 A AU 2009281696A AU 2009281696 A AU2009281696 A AU 2009281696A AU 2009281696 A1 AU2009281696 A1 AU 2009281696A1
- Authority
- AU
- Australia
- Prior art keywords
- ore
- conveyor
- pit
- mobile
- mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000005065 mining Methods 0.000 title claims description 33
- 238000000034 method Methods 0.000 claims description 38
- 238000009412 basement excavation Methods 0.000 claims description 26
- 238000012545 processing Methods 0.000 claims description 9
- 238000012546 transfer Methods 0.000 claims description 9
- 230000008602 contraction Effects 0.000 claims description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 14
- 229910052742 iron Inorganic materials 0.000 description 7
- 239000000463 material Substances 0.000 description 6
- 230000032258 transport Effects 0.000 description 5
- 238000005422 blasting Methods 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- 238000012876 topography Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 239000002360 explosive Substances 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000005549 size reduction Methods 0.000 description 2
- PAWQVTBBRAZDMG-UHFFFAOYSA-N 2-(3-bromo-2-fluorophenyl)acetic acid Chemical compound OC(=O)CC1=CC=CC(Br)=C1F PAWQVTBBRAZDMG-UHFFFAOYSA-N 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000005019 pattern of movement Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/26—Methods of surface mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C27/00—Machines which completely free the mineral from the seam
- E21C27/20—Mineral freed by means not involving slitting
- E21C27/24—Mineral freed by means not involving slitting by milling means acting on the full working face, i.e. the rotary axis of the tool carrier being substantially parallel to the working face
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Refuse Collection And Transfer (AREA)
Description
WO 2010/017581 PCT/AU2009/001024 MINING SYSTEM The present invention relates to open pit mining of ore that contains valuable metals. 5 The present invention relates particularly, although by no means exclusively to mining of iron ore. Conventional open pit mining of iron ore comprises 10 progressively drilling and blasting sections of an ore body so that the ore can be picked up by shovels or other suitable excavators and transported from a pit on haulage trucks. It is known to mine iron ore in large blocks using a series of benches so that various mining 15 activities can be carried out concurrently in a pit. A bench, which may be for example 40-200 m long by 20-100 m deep by 10-15 m high and containing many thousands of tonnes of ore and/or other material, is first drilled to form a pattern of "blast" holes. The material removed 20 during the course of drilling the blast holes is analysed, for example by chemical analysis, to determine whether, on average, the ore is (a) high grade, (b) low grade or (c) waste material. The cut-off between high and low grades is dependent on a range of factors and may vary from mine 25 to mine and in different sections of mines. The bench of ore is blasted using explosives, typically ANFO (ammonium nitrate/fuel oil) based, that are dispensed in specially designed bulk dispensing trucks which can regulate the explosive density prior to loading down the blast holes. 30 The blasted material is picked up by earth moving vehicles in the form of excavators such as electric rope shovels, diesel hydraulic excavators, or front end loaders and placed into haulage vehicles such as trucks and transported from the mine pit. The ore is processed 35 outside the mine pit depending on the grade determination. For example, waste ore is used as mine fill, low grade ore is stockpiled or used to blend with high grade ore, and WO 2010/017581 PCT/AU2009/001024 -2 high grade ore is processed further as required to form a marketable product. Because conventional open pit mining uses blasting, 5 care must be taken in drilling and blasting in the vicinity of proposed walls of the mine to minimise blast induced damage. The slopes of the walls must take account of such damage and cable bolting is often employed to provide additional slope stability. The slope of the wall 10 of a mine may be staggered in a series of steps known as "berm". Some of these berms are wide enough to provide for a haulage road to be established passing up the wall of the mine. Typically, such haulage roads progressive wind their way up the wall in a series of switch backs. 15 The time taken for haulage of blasted ore increases with the depth of the pit. The present invention is an alternative mining method to the above-described method. 20 The mining method of the present invention may be used as the only method of mining in a mine pit or as one of several mining methods in a mine pit. 25 According to the present invention there is provided a method of mining ore in a mine pit that comprises the steps of: (a) mining ore from a floor of a mine pit and/or 30 collecting ore on the pit floor using at least one mobile excavation machine; (b) transporting mined and/or collected ore within the mine pit on at least one mobile flexible conveyor; and 35 (c) transporting ore that has been transported along the flexible conveyor from within the pit to outside the WO 2010/017581 PCT/AU2009/001024 -3 pit on at least one ladder conveyor that extends up the wall of the pit. The method may comprise transferring ore that has 5 been transported up the wall of the pit along the ladder conveyor onto at least one main conveyor and transporting the ore along the main conveyor to a processing plant and/or a load-out station. 10 The term "mobile excavation machine" is understood herein to mean any machine that is capable of moving over a pit floor and mining ore that forms the pit floor and/or collecting ore on the pit floor. It is noted that the pit floor is unlikely to be a flat surface and typically will 15 be an uneven surface with loose rocks on the floor. The mobile excavation machine may be a continuous surface miner. 20 The continuous surface miner may comprise, by way of example, a drum that carries a plurality of cutting elements, such as cutter picks, and is rotatable about a horizontal axis and cuts into and thereby mines material that forms a pit floor as the surface miner advances 25 across the pit floor. The mobile excavation machine may be any other type of continuous surface miner. The continuous surface miner may excavate ore to a depth in a range of 300-600 mm and at a rate of at least 30 900 tph (more typically at least 1200 tph) and travel at a speed of at least 5 m/min (more typically at least 10 m/min). The term "mobile flexible conveyor" is understood 35 herein to mean a conveyor that is both mobile and flexible and can move across the floor of the mine pit in a linear WO 2010/017581 PCT/AU2009/001024 -4 and a non-linear manner and can continue to operate while moving across the pit floor. The term "mobile flexible conveyor" does not include 5 conveyors that persons in the mining industry refer to as "shiftable" or "movable" conveyors. A "shiftable" or "movable" conveyor is a conveyor that can be repositioned in a mine after a period of mining has been completed. In other words, the conveyor is not mobile in the sense that 10 it can move continuously, for example, to keep pace with a mobile excavation machine or other mobile machine while continuing to operate to transport mined and/or collected ore along the conveyor. 15 Typically, the mobile flexible conveyor has to meet any one or more of three basic requirements, namely (a) be sufficiently mobile to keep pace with an associated mobile excavation machine or other mobile machine while operating and transporting ore on the conveyor, (b) allow lateral, 20 flexible movement while operating and transporting ore on the conveyor and, by way of example be capable of moving up or down steps of up to 400 mm in a pit floor, and (c) allow lengthwise extension and contraction while operating and transporting ore on the conveyor. 25 The mobile flexible conveyor may be of a type described in Australian patent 767395 in the name of Michael Pietsch. The disclosure in the Australian patent is incorporated herein by cross-reference. 30 The method may comprise transferring mined and/or collected ore directly from the mobile excavation machine to the mobile flexible conveyor. 35 The method may comprise transferring mined and/or collected ore from the mobile excavation machine to a mobile feed system, such as a mobile hopper or a mobile WO 2010/017581 PCT/AU2009/001024 -5 crusher, and then transferring ore from the mobile feed system to the mobile flexible conveyor. The method may comprise continuously mining and/or 5 collecting ore from the pit floor with the mobile excavation machine, and moving (a) the mobile flexible conveyor or (b) the mobile feed system/mobile flexible conveyor assembly to track the movement of the mobile excavation machine, and continuously transferring mined 10 and/or collected ore from the mobile excavation machine to the mobile flexible conveyor or the mobile feed system/mobile flexible conveyor assembly. The method may comprise transferring mined and/or 15 collected ore from the mobile excavation machine to form a pile of ore on the pit floor. The method may comprise transferring ore away from the ore pile on the mobile flexible conveyor. 20 The method may comprise transferring ore from the mobile flexible conveyor to at least one mobile trunk conveyor that extends along a section of the pit floor to the ladder conveyor. 25 The term "mobile trunk conveyor" is understood herein to mean a "shiftable" or "movable" conveyor as described above. 30 The mobile trunk conveyor may be located on the pit floor in a lower region of the pit. The mobile trunk conveyor may follow a linear or a non-linear path. 35 WO 2010/017581 PCT/AU2009/001024 -6 The mobile trunk conveyor may receive ore from a plurality of mobile flexible conveyors covering more than one part of the pit. 5 The method may comprise periodically adjusting the position of the mobile trunk conveyor in response to a lowering of the pit floor. 10 The term "ladder conveyor" as used herein is understood to mean a conveyor that is able to transport ore from a mine pit directly up a wall of the mine pit from the pit floor, with the wall being a steep wall at an angle of at least 200 to the horizontal. 15 The wall of the mine pit may be at least 300, in many instances at least 65" to the horizontal. The pit wall may be at least 20 m and typically at 20 least 40 m high. The ladder conveyor may be a single conveyor from the pit floor to the rim of the mine pit and extends up the pit wall without transfer points along the length of the 25 conveyor, i.e. without the ore being off-loaded at an upper end of one section of the conveyor and loaded onto a lower end of a successive section of the conveyor. The ladder conveyor may extend up the pit wall 30 without a switchback. The ladder conveyor may comprise a belt that at least substantially encloses ore being conveyed on the conveyor. 35 The method may comprise extending the ladder conveyor in response to a general lowering of the pit floor.
WO 2010/017581 PCT/AU2009/001024 -7 The main conveyor may be located on a rim of the pit or at a base of a local topography surrounding the pit and follow the topography thereof. 5 The main conveyor may receive ore from more than one part of the pit or from a series of pits. According to the present invention there is also provided a mine that comprises at least one pit having a 10 pit floor and a pit wall that defines at least a part of the pit, at least one mobile excavation machine for mining ore from the pit floor and/or collecting or on the pit floor, at least one mobile flexible conveyor for transporting mined and/or collected ore within the mine 15 pit, and at least one ladder conveyor for transporting mined and/or collected ore from the pit. The mine may comprise a main conveyor outside the pit for transporting mined and/or collected ore from the pit 20 to a processing plant or a load-out station. The mine may comprise a plurality of pits and at least one main conveyor outside the pits for transporting mined and/or collected ore from the pits to a processing 25 plant or a load-out station. The pit wall may be at least 300, in many instances at least 650 to the horizontal. 30 The pit wall may be at least 20 m and typically at least 40 m high. The ladder conveyor may be a single conveyor from the pit floor to the rim of the mine pit and extends up the 35 pit wall without transfer points along the length of the conveyor, i.e. without the ore being off-loaded at an WO 2010/017581 PCT/AU2009/001024 -8 upper end of one section of the conveyor and loaded onto a lower end of a successive section of the conveyor. The ladder conveyor may extend up the pit wall 5 without a switchback. The pit floor may be at a plurality of different levels. 10 By way of example, the mine may be an iron ore mine. The present invention is now described by way of example only with reference to the accompanying Figure which is a schematic diagram of a layout of a mine pit 15 that illustrates one embodiment of a method of mining iron ore in accordance with the present invention. The following description is in the context of mining iron ore. It is understood that the present invention is 20 not limited to mining iron ore and extends to mining other ores. It is also understood that the mine layout shown in the Figure is schematic and is intended to represent a 25 mine layout in a very general sense. With reference to the Figure, a mine pit generally identified by the numeral 3 and having a pit floor 5 is defined at least in part by mine walls 7. The mine walls 30 7 are shown as opposed straight walls for convenience only and the present invention is not limited to this arrangement. The pit floor 5 may be at one level. Alternatively, the pit floor 5 may be on multiple levels, i.e. multiple benches, which may be isolated from each 35 other or interconnected by ramps (not shown).
WO 2010/017581 PCT/AU2009/001024 -9 The method of the present invention makes it possible for the angle of inclination of each mine wall 7 from the pit floor to be relatively steep, thereby minimising the loss of mined area. The angle of inclination is at least 5 200. In many situations, the angle may be at least 450*. Each mine wall 7 may comprise a series of steps or be one continuous wall. The method of the present invention makes it possible to form the mine walls 7 as steeper walls than is currently the case and, where steps are required, the 10 steps need not be as wide as is currently the case. More particularly, the method of the present invention makes it possible to form steeper mine walls 7 without the increased use of cable bolting or other mechanical means to provide additional slope stability. 15 A plurality of mobile excavation machines in the form of surface miners 11 excavates ore from the pit floor 5. It is noted that the pit floor 5 is unlikely to be a flat surface and typically it will be uneven with loose rocks 20 on the floor. By way of example, the surface miners 11 may comprise a drum that carries a plurality of cutter picks and is rotatable about a horizontal axis and cuts into and thereby mines material that forms the pit floor as the surface miner advances across the pit floor. 25 Typically, the surface miner can mine ore to a depth in a range of 300-600 mm at a rate of at least 900 tph and can travel at a speed of at least 5 m/min. The surface miners 11 make it possible to mine ore 30 directly from the pit floor 5 and avoid the need to drill and blast a mine at least in certain sections of the mine pit 3. The surface miners 11 (and other equipment) may be 35 controlled remotely or by operators on the miners. In either case, typically the paths of movement of the surface miners 11 (and other equipment) within the mine WO 2010/017581 PCT/AU2009/001024 - 10 pit 3 are in accordance with a mining plan. The paths of movement include, by way of example, a surface miner 11 advancing in one direction for a predetermined distance and mining ore from the pit floor, turning around and 5 advancing in the opposite direction for the predetermined distance and mining ore from the pit floor, and repeating this pattern of movement to mine ore from a section of the pit floor. 10 One group of the surface miners 11 shown in the Figure transfers mined ore to mobile flexible conveyors 13 directly onto the conveyors 13 or via mobile feed systems 15 located at forward ends of the conveyors 13. 15 The mobile flexible conveyors 13 may be of any suitable type. By way of example, the mobile flexible conveyors 13 may be as manufactured by International Conveying Systems International and described by way of example in Australian patent 767395. 20 The mobile feed systems 15 may be hoppers. Alternatively, or in addition, the mobile feed systems 15 may be in the form of crushers that produce at 25 least some size reduction of the ore. This group of the surface miners 11 moves continuously in defined paths of movement in accordance with the mining plan and the associated mobile flexible 30 conveyors 13 and mobile feed systems 15 track the movement of the surface miners 11 to receive mined ore from the surface miners 11. Another group of the surface miners 11 shown in the 35 Figure transfers mined ore outwardly from the surface miners 11 as the miners 11 advance and forms a pile in the form of a windrow 21 (or a series of windrows - not shown) WO 2010/017581 PCT/AU2009/001024 - 11 within the mine pit 3. The ore in the windrow is transferred via mobile feed systems 43 onto mobile flexible conveyors 13. The mobile feed systems 43 may be hoppers. Alternatively, or in addition, the mobile feed 5 systems 43 may be in the form of crushers that produce at least some size reduction of the ore. Whilst the windrow 21 is shown as a straight windrow, the present invention is not confined to this arrangement 10 and the form of the windrow or pile may be determined as required given the topography of the mine. The mobile flexible conveyors 13 make it possible to operate a mine without trucks as a main option for 15 transporting mined ore from a mine pit 3. This is a benefit in terms of operating costs, particularly in large, deep mine pits where travel distances and time from mining areas to processing plant, such as crushers or a load-out station can be significant. 20 Moreover, the use of a combination of surface miners 11 and mobile flexible conveyors 13 and mobile feed systems 15 makes it possible to form a pit floor 5 that can accommodate movement of mobile flexible conveyors 13 25 and mobile feed systems 15 across the pit floor 5. The ore is transported via the mobile flexible conveyors 13 across the pit floor 5 either (a) directly to a ladder conveyor 23 that is arranged to. transport the ore 30 from the mine 3 directly up the mine wall 7 or (b) to an internal trunk conveyor 27, i.e. a "shiftable" or "movable" conveyor that extends along the pit floor 5 adjacent the wall 7 and transports the ore to the ladder conveyor 23. 35 WO 2010/017581 PCT/AU2009/001024 - 12 The trunk conveyor 27 may have a series of transfer stations 37 for receiving ore from the trucks and feeding ore onto the trunk conveyor 27. 5 The ladder conveyor 23 may be in a fixed location against the wall 7 or may be mounted for movement along the length of the wall 7. In the latter case, the trunk conveyor 27 is arranged to be shiftable or movable or otherwise able to be extended to accommodate the change in 10 location of the ladder conveyor 23. In both cases, the ladder conveyor 23 may be extendable in length as the pit depth increases. The ladder conveyor 23 transfers the ore via a 15 transfer point 61 onto a conveyor assembly 29 that extends along the rim of the mine pit 3 and interconnects a series of pits and/or different sections of the same pit and transports the ore to a processing plant, such as a crusher, or to a load-out station. 20 The conveyor assembly 29 may be of a type that facilitates separation of ore into two process streams, with one stream, such as a high grade ore, being transported for processing in a crusher, and the other 25 stream, such as waste ore, being transported to a stockpile for subsequent use as a fill material. It is relevant to note that the arrangement shown in the Figure represents a section of a pit only and the 30 mining method illustrated with reference to the Figure is repeated in other sections of the pit 3. It may also be the case that other mining methods are used in different sections of the pit 3. In any event, the mined ore is transported from the mine via ladder conveyors 23 and is 35 delivered to the conveyor assembly 29.
WO 2010/017581 PCT/AU2009/001024 - 13 The ladder conveyor 23 may be any suitable conveyor. By way of example, the ladder conveyor 23 may be of the type manufactured by International Conveying Systems International and described in Australian patent 767395 in 5 the name of Michael Pietsch. The mobile trunk conveyor 27 may be of any suitable type. By way of example, the mobile trunk conveyor may be the same design as the mobile flexible conveyors 13 such 10 as manufactured by International Conveying Systems International and described in Australian patent 767395, but operated in a more static mode. Many modifications may be made to the method of the 15 present invention summarised in the Figures and described above without departing from the spirit and scope of the present invention. By way of example, whilst the Figure shows surface 20 miners 11 transferring mined ore outwardly from the surface miners 11 as the miners 11 advance and forming a windrow 21 within the mine pit 3, the present invention is not so limited and the mined ore could be feed downwardly from the miners 11 and form windrows behind the miners 11. 25 By way of example, whilst the Figure shows one ladder conveyor 23, the present invention is not so limited and extends to arrangements in which there is a plurality of ladder conveyors in a pit. 30 By way of example, whilst the Figure shows a pit floor that has one level only, the present invention is not so limited and extends to mines in which the pit floor has a plurality of levels. 35 By way or example, whilst the Figure discloses the use of mobile excavation machines in the form of surface WO 2010/017581 PCT/AU2009/001024 - 14 miners 11 that mine ore from the pit floor, the present invention is not so limited and extends to the use of mobile excavation machines that collect, i.e. excavate, broken or previously mined ore on the pit floor.
Claims (19)
1. A method of mining ore in a mine pit that comprises the steps of: 5 (a) mining ore from a floor of a mine pit and/or collecting ore on the pit floor using at least one mobile excavation machine; 10 (b) transporting mined and/or collected ore within the mine pit on at least one mobile flexible conveyor; and (c) transporting ore that has been transported along the flexible conveyor from within the pit to outside the 15 pit on at least one ladder conveyor that extends up the wall of the pit.
2. The method defined in claim 1 comprises transferring ore that has been transported along the ladder conveyor 20 onto at least one main conveyor and transporting the ore to a processing plant and/or a load-out station.
3. The method defined in claim 1 or claim 2 wherein the mobile excavation machine is a continuous surface miner. 25
4. The method defined in claim 3 wherein the continuous surface miner excavates ore to a depth in a range of 300 600 mm and at a rate of at least 900 tph and travel at a speed of at least 5 m/min (more typically at least 10 30 m/min).
5. The method defined in any one of the preceding claims wherein the mobile flexible conveyor (a) is sufficiently mobile to keep pace with an associated mobile excavation 35 machine or other mobile machine while operating and transporting ore on the conveyor, (b) allows lateral, flexible movement while operating and transporting ore on WO 2010/017581 PCT/AU2009/001024 - 16 the conveyor and, by way of example is capable of moving up or down steps of up to 400 mm in a pit floor, and (c) allows lengthwise extension and contraction while operating and transporting ore on the conveyor. 5
6. The method defined in any one of the preceding claims comprises transferring mined and/or collected ore directly from the mobile excavation machine to the mobile flexible conveyor. 10
7. The method defined in any one of claims 1 to 6 comprises transferring mined and/or collected ore from the mobile excavation machine to a mobile feed system, such as a mobile hopper or a mobile crusher, and then transferring 15 ore from the mobile feed system to the mobile flexible conveyor.
,8. The method defined in claim 6 or claim 7 comprises continuously mining and/or collecting ore from the pit 20 floor with the mobile excavation machine and moving (a) the mobile flexible conveyor or (b) the mobile feed system/mobile flexible conveyor assembly to track the movement of the mobile excavation machine, and continuously transferring mined and/or collected ore from 25 the mobile excavation machine to the mobile flexible conveyor or the mobile feed system/mobile flexible conveyor assembly.
9. The method defined in any one of claims 1 to 6 30 comprises transferring mined and/or collected ore from the mobile excavation machine to form a pile of ore on the pit floor.
10. The method defined in claim 9 comprises transferring 35 ore away from the ore pile on the mobile flexible conveyor. WO 2010/017581 PCT/AU2009/001024 - 17
11. The method defined in any one of the preceding claims comprises transferring ore from the mobile flexible conveyor to at least one mobile trunk conveyor that extends along a section of the pit floor to the ladder 5 conveyor.
12. The method defined in claim 11 comprises transferring ore from a plurality of mobile flexible conveyors to at the mobile trunk conveyor. 10
13. The method defined in any one of the preceding claims wherein the ladder conveyor is a single conveyor from the pit floor to the rim of the mine pit and extends up the pit wall without transfer points along the length of the 15 conveyor, i.e. without the ore being off-loaded at an upper end of one section of the conveyor and loaded onto a lower end of a successive section of the conveyor.
14. A mine that comprises at least one pit having a pit 20 floor and a pit wall that defines at least a part of the pit, at least one mobile excavation machine for mining ore from the pit floor and/or collecting ore on the pit floor, at least one mobile flexible conveyor for transporting mined and/or collected ore within the mine pit, and at 25 least one ladder conveyor for transporting mined and/or collected ore from the pit.
15. The mine defined in claim 14 comprises a main conveyor outside the pit for transporting mined and/or 30 collected ore from the pit to a processing plant or a load-out station.
16. The mine defined in claim 14 or claim 15 wherein the pit wall is at least 300, in many instances at least 65* 35 to the horizontal. WO 2010/017581 PCT/AU2009/001024 - 18
17. The mine defined in claim 16 wherein the pit wall is at least 20 m and typically at least 40 m high.
18. The method defined in any one of claims 14 to 17 5 wherein the ladder conveyor is a single conveyor from the pit floor to the rim of the mine pit and extends up the pit wall without transfer points along the length of the conveyor, i.e. without the ore being off-loaded at an upper end of one section of the conveyor and loaded onto a 10 lower end of a successive section of the conveyor.
19. The method defined in any one of claims 14 to 18 comprises a plurality of pits and at least one main conveyor outside the pits for transporting mined and/or 15 collected ore from the pits to a processing plant or a load-out station.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2009281696A AU2009281696A1 (en) | 2008-08-11 | 2009-08-11 | Mining system |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AU2008904110 | 2008-08-11 | ||
| AU2008904110A AU2008904110A0 (en) | 2008-08-11 | Mining System | |
| PCT/AU2009/001024 WO2010017581A1 (en) | 2008-08-11 | 2009-08-11 | Mining system |
| AU2009281696A AU2009281696A1 (en) | 2008-08-11 | 2009-08-11 | Mining system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AU2009281696A1 true AU2009281696A1 (en) | 2010-02-18 |
Family
ID=41668571
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AU2009281696A Abandoned AU2009281696A1 (en) | 2008-08-11 | 2009-08-11 | Mining system |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US20110227396A1 (en) |
| CN (1) | CN102119260A (en) |
| AU (1) | AU2009281696A1 (en) |
| BR (1) | BRPI0917527A2 (en) |
| CA (1) | CA2733639A1 (en) |
| CL (1) | CL2011000311A1 (en) |
| WO (1) | WO2010017581A1 (en) |
| ZA (1) | ZA201101050B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2979940B1 (en) * | 2011-09-13 | 2013-10-04 | Rene Brunone | METHOD FOR OPERATING AN OPEN SKY MINE |
| CN102777184B (en) * | 2012-08-08 | 2015-12-09 | 中联重科物料输送设备有限公司 | The mining system in mine and method |
| US10208592B2 (en) * | 2015-12-02 | 2019-02-19 | Joy Global Underground Mining Llc | Longwall optimization control |
| AU2019306743B2 (en) * | 2018-07-19 | 2024-12-05 | Underground Extraction Technologies Pty Ltd | Recovering conveyor systems and continuous miners from mined plunge tunnels in underground mines |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB728155A (en) * | 1951-08-17 | 1955-04-13 | Pohlig J Ag | Improvements in or relating to conveying equipment |
| US4103972A (en) * | 1973-12-03 | 1978-08-01 | Kochanowsky Boris J | Open pit mine |
| US4150852A (en) * | 1977-05-18 | 1979-04-24 | Mccoy Charles M | Method of strip mining |
| JPS5423001A (en) * | 1977-07-22 | 1979-02-21 | Mitsubishi Mining & Cement Co | Opencut mining method and apparatus |
| US4225186A (en) * | 1979-02-01 | 1980-09-30 | Stratton John R | Horizontal mining machine and method of slot mining |
| DE3207419C1 (en) * | 1982-03-02 | 1983-07-28 | Mannesmann AG, 4000 Düsseldorf | Direct fall dispensers, in particular for use in a system for two-stage or multi-stage dismantling in non-continuous opencast mining technology |
| US4609097A (en) * | 1983-08-17 | 1986-09-02 | Continental Conveyor And Equipment Company, Inc. | High angle conveyor |
| US4842130A (en) * | 1984-11-13 | 1989-06-27 | D M Enterprises Inc. | Belt bender |
| GB8423420D0 (en) * | 1984-09-17 | 1984-10-24 | Doyle G H | Excavator with cutting wheel assembly |
| US4765461A (en) * | 1985-05-23 | 1988-08-23 | Minenco Pty. Limited | Mobile elevator conveyor |
| US5427439A (en) * | 1994-06-14 | 1995-06-27 | Atlantic Richfield Company | Surface mining conveyor system |
| DE19901287C2 (en) * | 1999-01-15 | 2003-10-16 | Man Takraf Foerdertechnik Gmbh | Deck belt conveyors |
| AUPQ401299A0 (en) * | 1999-11-12 | 1999-12-09 | Pietsch, Michael | Continous haulage system |
-
2009
- 2009-08-11 CN CN2009801312756A patent/CN102119260A/en active Pending
- 2009-08-11 WO PCT/AU2009/001024 patent/WO2010017581A1/en not_active Ceased
- 2009-08-11 AU AU2009281696A patent/AU2009281696A1/en not_active Abandoned
- 2009-08-11 US US13/058,510 patent/US20110227396A1/en not_active Abandoned
- 2009-08-11 CA CA2733639A patent/CA2733639A1/en not_active Abandoned
- 2009-08-11 BR BRPI0917527A patent/BRPI0917527A2/en not_active Application Discontinuation
-
2011
- 2011-02-09 ZA ZA2011/01050A patent/ZA201101050B/en unknown
- 2011-02-11 CL CL2011000311A patent/CL2011000311A1/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| CA2733639A1 (en) | 2010-02-18 |
| CL2011000311A1 (en) | 2011-07-15 |
| WO2010017581A1 (en) | 2010-02-18 |
| ZA201101050B (en) | 2012-04-25 |
| US20110227396A1 (en) | 2011-09-22 |
| BRPI0917527A2 (en) | 2015-11-17 |
| CN102119260A (en) | 2011-07-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20110175429A1 (en) | Mining system | |
| US4103972A (en) | Open pit mine | |
| US4466669A (en) | Method of open cut mining | |
| CN102203380B (en) | Method and apparatus for processing a sized ore feed | |
| US4150852A (en) | Method of strip mining | |
| CN107676096B (en) | Continuous mining system and mining process for ferrous metallurgy open-pit mine | |
| US4445723A (en) | Method of circle mining of ore | |
| US20110227396A1 (en) | Mining system | |
| US6817678B2 (en) | Auger mining system | |
| US5427439A (en) | Surface mining conveyor system | |
| CN102777184B (en) | The mining system in mine and method | |
| RU2278261C1 (en) | Method of combined open-cut and underground steeply pitching deposit development | |
| EP1796842B1 (en) | Method and apparatus for open pit bench mining | |
| AU2009208123A1 (en) | Mining system | |
| Schimm et al. | Wirtgen Surface Miner–The First Link of a Simple Extraction and Materials Handling Chain in “Medium Hard”-Rock | |
| CA1064528A (en) | Open pit mine | |
| Egerton | Presidential address: The mechanisation of UG2 mining in the Bushveld Complex | |
| RU2495244C2 (en) | Method for open mining of mineral deposits by application of mill holes and cyclical and continuous method (ccm) | |
| SU1687779A1 (en) | Stripping and opencasting of mineral deposits | |
| Gogolewska | Surface and underground mining technology | |
| UA160232U (en) | Method of transportation of construction mineral raw materials | |
| RU2282721C2 (en) | Method for open pit mineral mining | |
| BALAMADESWARAN et al. | Surface miners in India--reigning supreme. | |
| SU929840A1 (en) | Method for open-cast mining of mineral depositis | |
| van Leyen | Aspects of in-pit crushing, conveying and dump layout |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MK1 | Application lapsed section 142(2)(a) - no request for examination in relevant period |