AT13828U1 - Picking system and method for loading of load carriers - Google Patents
Picking system and method for loading of load carriers Download PDFInfo
- Publication number
- AT13828U1 AT13828U1 ATGM9012/2010U AT90122010U AT13828U1 AT 13828 U1 AT13828 U1 AT 13828U1 AT 90122010 U AT90122010 U AT 90122010U AT 13828 U1 AT13828 U1 AT 13828U1
- Authority
- AT
- Austria
- Prior art keywords
- loading
- units
- picking
- order
- loading units
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 29
- 239000000969 carrier Substances 0.000 title claims abstract description 25
- 238000012546 transfer Methods 0.000 claims abstract description 63
- 239000002800 charge carrier Substances 0.000 claims abstract description 35
- 230000007246 mechanism Effects 0.000 description 19
- 230000008569 process Effects 0.000 description 11
- 230000008859 change Effects 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 4
- 238000012806 monitoring device Methods 0.000 description 4
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 239000011295 pitch Substances 0.000 description 2
- 230000002441 reversible effect Effects 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007257 malfunction Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000005693 optoelectronics Effects 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 239000002985 plastic film Substances 0.000 description 1
- 229920006255 plastic film Polymers 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G1/00—Storing articles, individually or in orderly arrangement, in warehouses or magazines
- B65G1/02—Storage devices
- B65G1/04—Storage devices mechanical
- B65G1/137—Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed
- B65G1/1373—Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses
- B65G1/1378—Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses the orders being assembled on fixed commissioning areas remote from the storage areas
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G15/00—Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration
- B65G15/22—Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration comprising a series of co-operating units
- B65G15/26—Conveyors having endless load-conveying surfaces, i.e. belts and like continuous members, to which tractive effort is transmitted by means other than endless driving elements of similar configuration comprising a series of co-operating units extensible, e.g. telescopic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G21/00—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors
- B65G21/10—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors movable, or having interchangeable or relatively movable parts; Devices for moving framework or parts thereof
- B65G21/14—Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors movable, or having interchangeable or relatively movable parts; Devices for moving framework or parts thereof to allow adjustment of length or configuration of load-carrier or traction element
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G47/00—Article or material-handling devices associated with conveyors; Methods employing such devices
- B65G47/52—Devices for transferring articles or materials between conveyors i.e. discharging or feeding devices
- B65G47/68—Devices for transferring articles or materials between conveyors i.e. discharging or feeding devices adapted to receive articles arriving in one layer from one conveyor lane and to transfer them in individual layers to more than one conveyor lane or to one broader conveyor lane, or vice versa, e.g. combining the flows of articles conveyed by more than one conveyor
- B65G47/69—Devices for transferring articles or materials between conveyors i.e. discharging or feeding devices adapted to receive articles arriving in one layer from one conveyor lane and to transfer them in individual layers to more than one conveyor lane or to one broader conveyor lane, or vice versa, e.g. combining the flows of articles conveyed by more than one conveyor the articles being accumulated temporarily
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G57/00—Stacking of articles
- B65G57/02—Stacking of articles by adding to the top of the stack
- B65G57/08—Stacking of articles by adding to the top of the stack articles being tilted or inverted prior to depositing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G61/00—Use of pick-up or transfer devices or of manipulators for stacking or de-stacking articles not otherwise provided for
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
Abstract
Die Erfindung betrifft ein Kommissioniersystem und ein Verfahren zur Beladung von Ladungsträgern(58) mit Ladeeinheiten (2) mittels einer Beladungsvorrichtung (1), bei dem Kommissionieraufträge erfasst und zu den Kommissionieraufträgen die benötigten Ladeeinheiten(2) in einem Bereitstellungssystem (56) auf mehreren Bereitstellungsplätzen (63) bereitgestelltund an diesen von der Beladungsvorrichtung (1) übernommen und von dieser zu,auf mehreren Stellplätzen (64) bereitgestellten Ladungsträgern (58) gefördert und nach einerräumlichen Beladungskonfiguration für einen Ladestapel (65) auf die jeweiligen Ladungsträger (58) geladen werden. Die Ladeeinheiten (2) werden auf ihrem Förderweg zwischen demBereitstellungssystem (56) und einem der Ladungsträger (58) von der Beladungsvorrichtung(1) in eine, durch die Kommissionieraufträge und/oder die Beladungskonfiguration bestimmteBeladungsreihenfolge sortiert, wobei die Ladeeinheiten (2) vom Bereitstellungssystem (56)von einer relativ zu den Bereitstellungsplätzen (63) verstellbaren Aufnahmevorrichtung (42)übernommen und von dieser in der Beladungsreihenfolge sortiert auf eine relativ zur Aufnahmevorrichtung(42) verstellbare Beschickungs-und Übergabevorrichtung (3, 4) zur Beladungeines oder mehrerer Ladungsträger (58) gefördert werden.The invention relates to a picking system and to a method for loading load carriers (58) with loading units (2) by means of a loading device (1), in which picking orders are recorded and, for the picking orders, the required loading units (2) in a provisioning system (56) on several provisioning stations (63) are supplied to and loaded therefrom by the loading device (1) and conveyed therefrom to load carriers (58) provided on a plurality of locations (64) and loaded onto the respective charge carriers (58) according to a spatial loading configuration for a loading stack (65). The loading units (2) are sorted in their conveying path between the delivery system (56) and one of the load carriers (58) from the loading device (1) into a loading order determined by the picking orders and / or the loading configuration, the loading units (2) being supplied by the delivery system (2). 56) is taken over by a receiving device (42) which can be adjusted relative to the places of supply (63) and is sorted by the latter in the loading order onto a loading and transfer device (3, 4) adjustable relative to the receiving device (42) for loading one or more load carriers (58). be encouraged.
Description
isteirelchisisei pitwiarot AT13 828U1 2014-09-15isteirelchisisei pitwiarot AT13 828U1 2014-09-15
Beschreibungdescription
KOMMISSIONIERSYSTEM UND VERFAHREN ZUR BELADUNG VON LADUNGSTRÄGERNCOMMISSIONING SYSTEM AND METHOD FOR LOADING LOADING CARRIES
[0001] Die Erfindung betrifft ein Verfahren zur Beladung von Ladungsträgern mit Ladeeinheiten und ein Kommissioniersystem mit einer Beladevorrichtung, wie im Oberbegriff der Ansprüche 1 und 6 beschrieben.The invention relates to a method for loading of load carriers with loading units and a picking system with a loading device, as described in the preamble of claims 1 and 6.
[0002] Die EP 1 995 192 A2 offenbart ein Kommissioniersystem mit einer Beladungsvorrichtung zur Beladung von Ladungsträgern mit Ladeeinheiten für einen Ladestapel, einem Bereitstellungssystem mit mehreren Bereitstellungsplätzen für Ladeeinheiten, einer Beladungszone mit mehreren Stellplätzen für Ladungsträger, wobei die Beladungsvorrichtung eine Beschickungsvorrichtung und eine an diese anschließende Sortiervorrichtung aufweist, welche Sortiervorrichtung zwischen dem Bereitstellungssystem und der Beladungszone angeordnet ist und eine von der Beschickungsvorrichtung entkoppelt bewegbare Aufnahmevorrichtung umfasst.EP 1 995 192 A2 discloses a picking system with a loading device for loading of load carriers with loading units for a loading pile, a delivery system with several loading stations for loading units, a loading zone with multiple slots for carriers, wherein the loading device and a charging device to this subsequent sorting device, which sorting device is arranged between the supply system and the loading zone and comprises a decoupled from the loading device movable receiving device.
[0003] Ein Verfahren zur automatischen Beladung von Ladungsträgern mit Ladeeinheiten mittels einer Beladungsvorrichtung ist aus der WO 2006/065147 A1 bekannt, bei dem die Ladeeinheiten in einem Bereitstellungssystem auf mehreren Bereitstellungsplätzen bereitgestellt und von der Beladungsvorrichtung übernommen und auf mehrere Ladungsträger nach einer räumlichen Beladungskonfiguration für einen Ladestapel geladen werden. Die Beladungsvorrichtung ist durch einen Gelenkarmroboter gebildet, der stets eine vereinzelte Ladeeinheit von einem der Bereitstellungsplätze aufnimmt und auf einen der Ladungsträger abgibt. Die Ladeeinheiten werden noch vor ihrer Übernahme durch den Gelenkarmroboter in eine endgültige Beladungsreihenfolge sortiert. Eine Sortierung der Ladeeinheiten mittels des Gelenkarmroboters ist nicht erforderlich. Bei diesem bekannten Verfahren ist nur eine begrenzte Kommissionierleistung möglich.A method for the automatic loading of load carriers with loading units by means of a loading device is known from WO 2006/065147 A1, in which the loading units provided in a staging system on several supply stations and taken from the loading device and on several charge carriers for a spatial loading configuration for load a stack of charges. The loading device is formed by an articulated-arm robot, which always picks up an isolated loading unit from one of the staging areas and delivers it to one of the load carriers. The loading units are sorted before their takeover by the articulated arm robot in a final load order. A sorting of the loading units by means of Gelenkarmroboters is not required. In this known method, only a limited picking performance is possible.
[0004] Aus der EP 1 462 394 B1 und WO 2009/094681 A1 ist ein Kommissioniersystem bekannt, welches mehrere Beladungsvorrichtungen zur automatischen Beladung von Ladungsträgern mit Ladeeinheiten nach einer räumlichen Beladungskonfiguration für einen Ladestapel aufweist, welche an ein automatisiertes Ladeeinheiten-Verteilsystem angeschlossen sind. Jede Beladungsvorrichtung weist ausschließlich einen Stellplatz für den Ladungsträger auf. Die Ladeeinheiten werden auf dem Förderweg entlang des Verteilsystems in eine durch die Beladungskonfiguration festgelegte Beladungsreihenfolge sortiert und in der Beladungsreihenfolge nacheinander vereinzelt auf einen Bereitstellungsplatz der Beladungsvorrichtungen gefördert.From EP 1 462 394 B1 and WO 2009/094681 A1, a picking system is known, which has a plurality of loading devices for the automatic loading of load carriers with loading units for a spatial loading configuration for a loading stack, which are connected to an automated loading unit distribution system. Each loading device has only one parking space for the carrier. The loading units are sorted on the conveying path along the distribution system into a loading order defined by the loading configuration and conveyed one after the other in the loading order to a loading place of the loading devices.
[0005] Gemäß der EP 1 462 394 B1 umfasst der Bereitstellungsplatz eine ortsfeste Ladeplatte auf, von dem durch eine Beschickungsvorrichtung die vereinzelte Ladeeinheit auf und relativ zu der ortsfesten Ladeplatte in eine x-Position geschoben wird, in welcher die Ladeeinheit von einer Übergabevorrichtung ergriffen und von dieser in eine z-Position auf den Ladungsträger gefördert wird. Sobald ein Ladungsträger mit einem Ladestapel von einer Beladungsvorrichtung vollständig beladen wurde, tauscht eine Ladungsträger-Wechselvorrichtung den gefüllten Ladungsträger durch einen leeren Ladungsträger aus. Da während des Wechselvorganges der Ladungsträger die Beladungsvorrichtung einen Beladungsvorgang nicht vornehmen kann, ist nur eine begrenzte Kommissionierleistung erreichbar. Das Kommissioniersystem kann den Durchsatz an zu kommissionierenden Ladungsträger nur dadurch erhöhen, indem viele einzelne Beladungsvorrichtungen vorgesehen sind. Hohe Investitionskosten sind zwangsweise die Folge.According to EP 1 462 394 B1, the provisioning station comprises a stationary pallet from which, by means of a loading device, the separated loading unit is pushed onto an x-position on and relative to the stationary pallet, in which the loading unit is gripped by a transfer device and is conveyed by this in a z-position on the charge carrier. As soon as a charge carrier with a charging stack has been completely loaded by a loading device, a charge carrier changing device exchanges the filled charge carrier with an empty charge carrier. Since the loading device can not perform a loading process during the change process of the load carrier, only a limited picking performance can be achieved. The picking system can only increase the throughput of load carriers to be picked by providing many individual loading devices. High investment costs are inevitably the result.
[0006] Erfolgt die Sortierung auf dem Förderweg zwischen einem Vorratslager für die Ladeeinheiten und der Beladungsvorrichtung, wie dies gemäß dem genannten Stand der Technik der Fall ist, müssen im Störungsfall gesamte Logistikabschnitte des Kommissioniersystems stillgelegt werden. Dadurch droht die Gefahr, dass Kommissionieraufträge nicht rechtzeitig abgearbeitet werden können.If the sorting takes place on the conveyor between a storage for the loading units and the loading device, as is the case according to the cited prior art, in case of failure entire logistics sections of the order picking system must be shut down. This threatens the danger that picking orders can not be processed on time.
[0007] Weiters ist aus der DE 10 2005 061 309 A1 ein Kommissioniersystem für Ladeeinheiten bekannt, welches Fördervorrichtungen, ein Bereitstellungssystem mit mehreren Bereitstellungs- 1 / 31 ästerreidBsd!« pitwtot AT 13 828 U1 2014-09-15 platzen, eine Sortiervorrichtung mit einer Mehrzahl von Pufferkanälen, Beschickungs- und Entnahmefahrzeuge aufweist Das Bereitstellungssystem ist an eine erste Fördervorrichtung angeschlossen. Das Beschickungsförderfahrzeug ist entlang der eingangsseitigen Enden der Pufferkanäle und das Entnahmefahrzeuge entlang der ausgangsseitigen Enden der Pufferkanäle verfahrbar. Die Ladeeinheiten werden auf den Bereitstellungsplätzen bereitgestellt und an diesen vom Beschickungsfahrzeug entnommen und selektiv auf die Pufferkanäle abgegeben und in den Pufferkanälen aufgestaut. Das Entnahmefahrzeug kann die aufgestauten Ladeeinheiten selektiv von den Pufferkanälen entnehmen und an eine zweite Fördervorrichtung abgeben. Durch die Pufferung der Ladeeinheiten in den Pufferkanälen ist die Kommissionierleistung begrenzt.Furthermore, a picking system for loading units is known from DE 10 2005 061 309 A1, which conveying apparatuses, a provisioning system with a plurality of provisioning units, burst a sorting apparatus with a sorting device Having a plurality of buffer channels, loading and unloading vehicles The delivery system is connected to a first conveyor. The feed conveyor vehicle is movable along the input-side ends of the buffer channels and the pickup vehicles along the output-side ends of the buffer channels. The load units are provided at the staging locations and taken therefrom by the loader vehicle and selectively dispensed onto the buffer channels and dammed in the buffer channels. The unloading vehicle can selectively remove the accumulated loading units from the buffer channels and deliver them to a second conveyor. The buffering of the loading units in the buffer channels limits the picking performance.
[0008] Die Aufgabe der Erfindung liegt darin, ein Verfahren zur Beladung von Ladungsträgern mit Ladeeinheiten und ein Kommissioniersystem zu schaffen, bei dem gegenüber den bekannten Systemen eine noch höhere Kommissionierleistung erreicht wird.The object of the invention is to provide a method for loading of load carriers with loading units and a picking system, in which compared to the known systems an even higher picking performance is achieved.
[0009] Die Aufgabe der Erfindung wird durch die Maßnahmen und Merkmale in den Ansprüchen 1 und 6 gelöst. Von Vorteil ist, dass die Sortierung gegenüber den aus dem Stand der Technik bekannten Kommissionierverfahren nicht ausschließlich vor der Übergabe der Ladeeinheiten an die Beladungsvorrichtung erfolgen muss, sondern auch von der ohnehin vorhandenen Beladungsvorrichtung übernommen werden kann.The object of the invention is achieved by the measures and features in claims 1 and 6. It is advantageous that the sorting compared to the picking method known from the prior art does not have to take place exclusively before the transfer of the loading units to the loading device, but can also be taken over by the loading device which is present anyway.
[0010] Die Beladungsvorrichtung kann eine Sortierung nach Kommissionieraufträgen und in eine Beladungsreihenfolge durchführen. Wird hingegen von der Beladungsvorrichtung eine Sortierung ausschließlich in eine Beladungsreihenfolge durchführt, werden die Ladeeinheiten auf dem vorgelagerten Förderweg bis zur Beladungsvorrichtung beispielsweise nach Kommissionieraufträgen oder Ladeeinheiten-Eigenschaften vorsortiert und anschließend von der Beladungsvorrichtung in eine Beladungsreihenfolge endsortiert. Somit kann die Sortierfunktion auf dem vorgelagerten Förderweg bis zur Beladungsvorrichtung entweder vollständig wegfallen oder wesentlich vereinfacht werden.The loading device can perform a sorting order picking and in a loading order. If, on the other hand, the loading device performs a sorting exclusively in a loading order, the loading units are presorted on the upstream conveying path to the loading device, for example after order picking or loading unit properties, and then sorted by the loading device into a loading order. Thus, the sorting function on the upstream conveyor to the loading device either completely eliminated or significantly simplified.
[0011] Durch die Verlagerung der Sortierung in einen vom Wartungspersonal gut zugänglichen und überschaubaren Logistikabschnitt des Kommissioniersystems, können auch Störungen schneller lokalisiert und behoben werden.By relocating the sorting in a well-accessible and manageable by the maintenance personnel logistics section of the order picking system, malfunctions can be localized and resolved faster.
[0012] Darüber hinaus erweist sich auch die Anordnung von mehreren Stellplätzen für mehrere Ladungsträger von Vorteil, da die Beladungsvorrichtung während des Wechselvorganges der Ladungsträger, daher dem Austausch eines beladenen Ladungsträgers gegen einen leeren Ladungsträger, ein Ladungsträger auf einem der anderen Stellplätze beladen werden kann. Die Beladungsvorrichtung kann ohne Unterbrechung kontinuierlich Kommissionieraufträge abarbeiten. Andererseits kann die Beladungsvorrichtung simultan die Sortierung vornehmen, da sie auf mehreren Bereitstellungsplätzen kontinuierlich mit Ladeeinheiten versorgt wird.In addition, the arrangement of several parking spaces for several carriers also proves advantageous, since the loading device during the change process of the charge carriers, therefore the replacement of a loaded charge carrier against an empty carrier, a carrier can be loaded on one of the other slots. The loading device can continuously process picking orders without interruption. On the other hand, the loading device can simultaneously carry out the sorting, since it is continuously supplied with loading units in a plurality of staging areas.
[0013] Besonders vorteilhaft ist es auch, dass die Ladeeinheiten vorerst auf der Aufnahmevorrichtung zu einer Stapelreihe zusammengestellt und danach auf die Beschickungsvorrichtung abgefördert werden. Die Stapelreihe kann Ladeeinheiten zu nur einem Kommissionierauftrag oder mehreren Kommissionieraufträgen enthalten. So können innerhalb einer Stapelreihe eine oder mehrere Ladeeinheit(en) zu einem ersten Kommissionierauftrag und eine oder mehrere Ladeeinheit(en) zu einem zweiten Kommissionierauftrag, oder alle Ladeeinheiten nur eines einzigen Kommissionierauftrages enthalten sein.It is also particularly advantageous that the loading units are initially put together on the receiving device to a stack row and then conveyed away to the loading device. The stack row may contain load units for only one picking order or multiple picking orders. Thus, within a stack row, one or more loading unit (s) for a first picking order and one or more loading unit (s) for a second picking order, or all loading units of only a single picking order may be included.
[0014] Somit werden gleichzeitig mehrere Ladeeinheiten manipuliert und diese insbesondere auch innerhalb einer Stapelreihe in z-Richtung (Stapeltiefe) in einem einzigen Beladezyklus nacheinander auf die Beladepositionen abgegeben.Thus, a plurality of loading units are simultaneously manipulated and delivered in particular in a stacking row in the z-direction (stacking depth) in a single loading cycle successively to the loading positions.
[0015] Eine besonders einfache und dynamische Sortierung der Ladeeinheiten in die Beladungsreihenfolge wird durch die Maßnahme nach Anspruch 2 erreicht.A particularly simple and dynamic sorting of the loading units in the loading order is achieved by the measure according to claim 2.
[0016] Gemäß der Maßnahme nach dem Anspruch 3 erfolgt die Sortierung der Ladeeinheiten ausschließlich durch die Beladungsvorrichtung, sodass die Funktionalität des Verteilsystems erheblich vereinfacht werden kann. Dadurch ist das Kommissioniersystem weniger störanfällig 2/31According to the measure according to claim 3, the sorting of the loading units takes place exclusively by the loading device, so that the functionality of the distribution system can be considerably simplified. This makes the order picking system less susceptible to faults 2/31
&*»«id>ische AT13 828U1 2014-09-15 und kann eine zuverlässige Versorgung von Ladeeinheiten an den Bereitstellungsplätzen erreicht werden.&& id < AT13 828U1 2014-09-15 < > i < > AT13 828U1 2014-09-15 and a reliable supply of loading units at the staging areas can be achieved.
[0017] Von Vorteil ist auch die Maßnahme nach Anspruch 4, da die Ladeeinheiten in einer vorsortierten Reihenfolge zu den Bereitstellungsplätzen angefördert und von der Beladungsvorrichtung in eine Beladungsreihenfolge endsortiert werden. Die Vorsortierung kann mit besonders einfachen Sortierfunktionen entweder durch das Verteilsystem oder durch ein Förderfahrzeug im Vorratslager erfolgen. Dabei können die Ladeeinheiten nach einer der Ladeeinheiten-Eigenschaften, wie Abmessungen, Formstabilität und dgl., oder Kommissionieraufträgen vorsortiert werden. Dadurch kann die Sortiervorrichtung der Beladungsvorrichtung bedarfsweise unterhalb ihrer maximal möglichen Antriebsleistung betrieben werden.Another advantage is the measure according to claim 4, since the loading units are conveyed in a presorted order to the staging areas and end sorted by the loading device in a loading order. The presorting can be done with very simple sorting functions either by the distribution system or by a conveyor vehicle in the storage. The loading units can be pre-sorted according to one of the loading unit properties, such as dimensions, dimensional stability and the like, or order picking. As a result, the sorting device of the loading device can, if necessary, be operated below its maximum possible drive power.
[0018] Erfolgt, wie im Anspruch 5 beschrieben, eine Auswertung der Förderreihenfolge der Ladeeinheiten, in welcher sie an den Bereitstellungsplätzen angefördert werden, wird die Beförderung der Ladeeinheiten überwacht und eine Plausibilitätsprüfung durchgeführt. Beispielsweise kann die Förderreihenfolge von einer elektronischen Überwachungsvorrichtung, beispielsweise eine Sensorik, CCD-Kamera und dgl., ermittelt werden, welche das Verteilsystem aufweist. Die Überwachungsvorrichtung kann Daten aus einem, an der Ladeeinheit angeordneten Datenträger erfassen. Der Datenträger umfasst einen eindeutigen, unverwechselbaren Identifizierungscode. Der Datenträger ist vorzugsweise durch einen Barcode, Transponder, Magnetstreifen oder eine RFID-Etikette (Radio Frequency Identification Device) gebildet Andererseits kann die Förderreihenfolge durch einen, die Förderung der Ladeeinheiten im Kommissioniersystem steuernden Rechner, insbesondere einem Materialflussrechner, ermittelt werden.Is carried out, as described in claim 5, an evaluation of the delivery order of the loading units, in which they are conveyed to the staging areas, the carriage of the loading units is monitored and carried out a plausibility check. For example, the delivery order can be determined by an electronic monitoring device, for example a sensor system, CCD camera and the like, which has the distribution system. The monitoring device can acquire data from a data carrier arranged on the charging unit. The data carrier comprises a unique, distinctive identification code. The data carrier is preferably formed by a barcode, transponder, magnetic stripe or an RFID label (Radio Frequency Identification Device). On the other hand, the conveying order can be determined by a computer controlling the conveyance of the loading units in the picking system, in particular a material flow computer.
[0019] Vorteilhafte Ausgestaltungen der Erfindung sind auch in den Ansprüchen 7 bis 12 beschrieben. Die Bewegungen der Beschickungsvorrichtung und der Sortiervorrichtung können entkoppelt erfolgen. Mit anderen Worten kann noch während die Sortiervorrichtung Ladeeinheiten von den Bereitstellungsplätzen erhält und in die benötigte Beladereihenfolge sortiert, die Übergabevorrichtung der Beschickungsvorrichtung Ladeeinheiten auf einen oder mehrere Ladungsträger umladen. Dadurch wird an der Beladungsvorrichtung eine hohe Durchsatzleistung der zu kommissionierenden Ladeeinheiten erreicht. Eine weitere Entkoppelung der Förderbewegungen der Ladeeinheiten wird erreicht, wenn die Bewegungen der Beschickungsvorrichtung und der Übergabevorrichtung entkoppelt erfolgen. Andererseits kann die Beschickungsvorrichtung und die Übergabevorrichtung eine Baueinheit bilden und gemeinsam in x-Richtung und/oder y-Richtung verstellt werden. Auch ist es möglich, dass die Beschickungsvorrichtung und die Übergabevorrichtung unabhängig voneinander verstellbar sind und gegebenenfalls während eines Beladevorganges gemeinsam in x-Richtung und/oder y-Richtung synchron verstellt werden. Sind die Sortiervorrichtung (erster Förderabschnitt), Beschickungsvorrichtung (zweiter Förderabschnitt) und Übergabevorrichtung (dritter Förderabschnitt) je mit einer automatisierten Fördervorrichtung ausgestattet, ist eine genaue Positionierung der Ladeeinheiten auf jedem Förderabschnitt entlang des Förderweges zwischen dem Bereitstellungssystem und dem Ladungsträger möglich. Durch Steuerung der Fördergeschwindigkeiten an den Fördervorrichtungen kann eine störungsfreie Übergabe der Ladeeinheiten zwischen aufeinander folgenden Förderabschnitten erfolgen.Advantageous embodiments of the invention are also described in claims 7 to 12. The movements of the loading device and the sorting device can be decoupled. In other words, while the sorting device still receives loading units from the staging areas and sorts them into the required loading order, the transfer device of the loading device can reload loading units onto one or more load carriers. As a result, a high throughput of the loading units to be picked is achieved at the loading device. Further decoupling of the conveying movements of the loading units is achieved when the movements of the loading device and the transfer device are decoupled. On the other hand, the loading device and the transfer device can form a structural unit and be adjusted together in the x-direction and / or y-direction. It is also possible for the loading device and the transfer device to be adjustable independently of one another and, if appropriate, to be synchronously adjusted in the x-direction and / or y-direction during a loading process. If the sorting device (first conveying section), feeding device (second conveying section) and transfer device (third conveying section) are each equipped with an automated conveying device, precise positioning of the loading units on each conveying section along the conveying path between the providing system and the load carrier is possible. By controlling the conveying speeds at the conveying devices, a trouble-free transfer of the loading units between successive conveying sections can take place.
[0020] Zum besseren Verständnis der Erfindung wird diese anhand der nachfolgenden Figuren näher erläutert.For a better understanding of the invention, this will be explained in more detail with reference to the following figures.
[0021] Es zeigen jeweils in stark schematisch vereinfachter Darstellung: [0022] Fig. 1 eine Beladungsvorrichtung zum Beladen von Ladungsträgern, in per spektivischer Ansicht; [0023] Fig. 2a bis 2f eine Sequenzdarstellung vom Beladungsvorgang eines von mehrerenIn a highly simplified schematic representation: [0022] FIG. 1 shows a loading device for loading charge carriers, in a perspective view; 2a to 2f is a sequence representation of the loading process one of several
Ladungsträgern durch die Beladungsvorrichtung in Seitenansicht gemäß den Linien II - II in Fig. 1, wobei sich eine Übergabevorrichtung in Fig. 2a in ihrer Übernahmestellung und in Fig. 2b in einer ihrer Beladestellungen befindet; 3/31Load carriers through the loading device in side view along the lines II - II in Figure 1, wherein a transfer device in Figure 2a is in its takeover position and in Figure 2b in one of its loading positions ..; 3.31
istenseid»schis piieKSättt AT 13 828 U1 2014-09-15 [0024] Fig. 3 ein Kommissioniersystem mit einem Vorratslager, einem Verteilsystem für Ladeeinheiten, einem Bereitstellungssystem, wenigstens einer Beladungsvorrichtung und einer Beladungszone; [0025] Fig. 4a bis 4g eine Sequenzdarstellung der Beförderung, des Sortierung- und Bela dungsvorganges der Ladeeinheiten nach einer ersten Ausführung der Sortierung in die Beladungsreihenfolge nach dem Kriterium der Beladungskonfiguration; [0026] Fig. 5a bis 5h eine Sequenzdarstellung der Beförderung, des Sortierung- und Beladungsvorganges der Ladeeinheiten nach einer zweiten Ausführung der Sortierung in die Beladungsreihenfolge nach dem Kriterium der Kommissionieraufträge und gegebenenfalls Beladungskonfiguration.istenseidschis piieKSättt [0024] FIG. 3 shows a picking system with a storage bin, a distribution system for loading units, a delivery system, at least one loading device and a loading zone; 4a to 4g is a sequence diagram of the transport, the sorting and Bela tion process of the loading units after a first execution of the sorting in the loading order according to the criterion of loading configuration; Fig. 5a to 5h is a sequence diagram of the transport, the sorting and loading process of the loading units after a second execution of the sorting in the loading order according to the criterion of order picking and optionally loading configuration.
[0027] Einführend sei festgehalten, dass in den unterschiedlich beschriebenen Ausführungsformen gleiche Teile mit gleichen Bezugszeichen bzw. gleichen Bauteilbezeichnungen versehen werden, wobei die in der gesamten Beschreibung enthaltenen Offenbarungen sinngemäß auf gleiche Teile mit gleichen Bezugszeichen bzw. gleichen Bauteilbezeichnungen übertragen werden können. Auch sind die in der Beschreibung gewählten Lageangaben, wie z.B. oben, unten, seitlich usw. auf die unmittelbar beschriebene sowie dargestellte Figur bezogen und sind bei einer Lageänderung sinngemäß auf die neue Lage zu übertragen.By way of introduction, it should be noted that in the differently described embodiments, the same parts are provided with the same reference numerals or the same component names, wherein the disclosures contained in the entire description can be mutatis mutandis transferred to like parts with the same reference numerals or identical component names. Also, the location information chosen in the description, such as top, bottom, side, etc. related to the immediately described and illustrated figure and are to be transferred to the new situation mutatis mutandis when a change in position.
[0028] In den Fig. 1 und 2 ist eine mögliche Ausführung einer Beladungsvorrichtung 1 zum automatischen Beladen von Ladungsträgern mit Ladeeinheiten 2 gezeigt, die an ein in dieser Fig. nicht dargestelltes Verteilsystem angeschlossen ist Die Ladeeinheiten 2 sind in der Regel durch Kartonagen oder durch auf einem stabilen Untersatz abgestellte und mit einer Kunststofffolie umwickelte Verpackungseinheiten (Colli) und dgl. gebildet. Die Beladungsvorrichtung 1 kann eine Übergabevorrichtung 3, eine Beschickungsvorrichtung 4, gegebenenfalls eine Ausrichtvorrichtung 5, eine Sortiervorrichtung 6 sowie eine Beladungsüberwachungsvorrichtung 7 aufweisen.1 and 2, a possible embodiment of a loading device 1 for the automatic loading of load carriers with loading units 2 is shown, which is connected to a not shown in this Fig. Distribution system The loading units 2 are usually by cardboard or by formed on a stable base and wrapped with a plastic film packaging units (Colli) and the like. The loading device 1 may have a transfer device 3, a charging device 4, optionally an alignment device 5, a sorting device 6 and a loading monitoring device 7.
[0029] Die Beschickungsvorrichtung 4 ist auf einem Stellwagen 8 gelagert, der einen Tragrahmen aufweist. Der Stellwagen 8 ist über eine Verstellvorrichtung 9 entlang einer Führungsanordnung, insbesondere Linearführungen 10, in x-Richtung horizontal längs der Ladungsträger (Fig. 3) verstellbar auf einem Rahmen 11a der Beladungsvorrichtung 1 gelagert.The charging device 4 is mounted on a carriage 8, which has a support frame. The positioning carriage 8 is mounted on an adjustment device 9 along a guide arrangement, in particular linear guides 10, in the x-direction horizontally along the load carrier (FIG. 3) adjustably mounted on a frame 11a of the loading device 1.
[0030] Die in den Fig. schematisch, dargestellte Verstellvorrichtung 9 ist durch einen Linearantrieb gebildet und weist nach gezeigtem Ausführungsbeispiel einen mit dem Stellwagen 8 verbundenen Zugmitteltrieb auf. Der Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 12, welches um ein Umlenkrad und ein mit einem Stellmotor 13 gekuppeltes Antriebsrad geführt ist. Durch Drehbewegung des Antriebsrades im Uhrzeigersinn oder im Gegenuhrzeigersinn wird der Stellwagen 8 und die auf diesem gelagerte Beschickungsvorrichtung 4 horizontal längs und relativ zu den Ladungsträgern in x-Richtung bis zu einer von einem Rechner festgelegten x-Position bewegt.The adjusting device 9 shown schematically in the figures, is formed by a linear drive and has according to gezeem example, a connected to the carriage 8 traction drive. The traction mechanism drive comprises an endlessly circulating traction mechanism 12 which is guided around a deflecting wheel and a drive wheel coupled to a servomotor 13. By rotational movement of the drive wheel in a clockwise or counterclockwise direction, the positioning carriage 8 and the charging device 4 mounted thereon are moved horizontally along and relative to the charge carriers in the x-direction up to an x-position determined by a computer.
[0031] Die Beschickungsvorrichtung 4 umfasst eine Fördervorrichtung, insbesondere einen von einem Fördermotor 14 angetriebenen Bandförderer 15, Gurtförderer und dgl., und eine am vorderen Ende parallel zu dessen Stirnkante mit geringem Abstand angeordnete Gleitleiste 16.The charging device 4 comprises a conveying device, in particular a belt conveyor 15 driven by a conveying motor 14, belt conveyors and the like, and a sliding strip 16 arranged at a small distance at the front end parallel to its end edge.
[0032] Die Ausrichtvorrichtung 5 weist relativ zueinander verstellbare Seitenführungen auf, die nach diesem gezeigten Ausführungsbeispiel durch in Förderrichtung 17 der Ladeeinheiten 2 mit Abstand parallel zueinander angeordnete Fördervorrichtungen 18a, 18b gebildet sind. Jede Fördervorrichtung 18a, 18b ist mit einem Antriebsmotor 19a, 19b gekoppelt.The alignment device 5 has relatively adjustable side guides, which are formed according to this embodiment shown by in the conveying direction 17 of the loading units 2 at a distance parallel to each other arranged conveyors 18a, 18b. Each conveyor 18a, 18b is coupled to a drive motor 19a, 19b.
[0033] Nach gezeigtem Ausführungsbeispiel ist die rechte Fördervorrichtung 18a ortsfest am Tragrahmen des Stellwagens 8 angeordnet, während die linke Fördervorrichtung 18b in x-Richtung relativ zur Beschickungsvorrichtung 4 verstellbar ist. Die linke Fördervorrichtung 19b ist auf einem Stellwagen 20 angeordnet, der einen Tragrahmen aufweist. Der Stellwagen 20 ist über eine Verstellvorrichtung 21 entlang einer Führungsanordnung, insbesondere Linearführungen 22, in x-Richtung verstellbar auf dem Stellwagen 8 der Beschickungsvorrichtung 4 gelagert. 4/31According to the embodiment shown, the right-hand conveyor 18a is fixedly arranged on the support frame of the carriage 8, while the left-hand conveyor 18b is adjustable in the x-direction relative to the charging device 4. The left conveyor 19b is arranged on a positioning carriage 20, which has a support frame. The positioning carriage 20 is mounted via an adjusting device 21 along a guide arrangement, in particular linear guides 22, adjustable in the x-direction on the positioning carriage 8 of the charging device 4. 4.31
MerrecNsche;; pitefiSasnt AT 13 828 U1 2014-09-15 [0034] Die Verstellvorrichtung 21 ist durch einen Linearantrieb gebildet und weist nach gezeigtem Ausführungsbeispiel einen Zugmitteltrieb auf. Der Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 23, welches um ein Umlenkrad und ein mit einem Stellmotor 24 gekuppeltes Antriebsrad geführt ist. Die Drehrichtung des Stellmotors 24 ist reversibel ausgebildet, sodass der Stellwagen 20 und damit die Fördervorrichtung 18b in x-Richtung entweder auf die gegenüberliegende Fördervorrichtung 18a zu bewegt oder von dieser weg bewegt wird. Durch die Verstellung des Abstandes zwischen den Fördervorrichtungen 18a, 18b findet eine Anpassung an unterschiedliche Abmessungen der Ladeeinheiten 2 statt.MerrecNsche ;; The adjusting device 21 is formed by a linear drive and, according to the embodiment shown, has a traction mechanism drive. The traction mechanism drive comprises an endlessly circulating traction mechanism 23 which is guided around a deflecting wheel and a drive wheel coupled to a servomotor 24. The direction of rotation of the servomotor 24 is reversible, so that the positioning carriage 20 and thus the conveying device 18b in the x-direction is either moved towards the opposite conveying device 18a or moved away from it. By adjusting the distance between the conveying devices 18a, 18b, an adaptation to different dimensions of the loading units 2 takes place.
[0035] Die Übergabevorrichtung 3 weist nach gezeigter Ausführung parallele Förderbahnen 25a, 25b auf die jeweils auf einem Führungsschlitten 26a, 26b angeordnet und über eine erste Verstellvorrichtung 27 entlang einer Führungsanordnung in eine Übernahmestellung in x- Richtung verstellbar sind. In einer Übernahmestellung sind die Förderbahnen 26a, 26b auf einen, aus einer Ladeeinheiten-Eigenschaft, insbesondere Fördereigenschaft, einer Ladeeinheit 2 oder einer der zu stapelnden Ladeeinheiten 2 einer Stapelreihe vom Rechner ermittelten Abstand eingestellt und so unterhalb der Beschickungsvorrichtung 4 positioniert, dass eine oder mehrere auf der Beschickungsvorrichtung 4 liegende Ladeeinheit(en) 2 relativ zu den Förderbahnen 25a, 25b mittig übergeben werden können.The transfer device 3, according to the embodiment shown parallel conveyor tracks 25a, 25b arranged on each of a guide carriage 26a, 26b and are adjustable via a first adjusting device 27 along a guide arrangement in a transfer position in the x direction. In an acceptance position, the conveyor tracks 26a, 26b are set to a distance determined by the computer from a loading unit property, in particular conveying property, a loading unit 2 or one of the stacking units 2 to be stacked, and positioned below the loading device 4 such that one or more loading unit (s) 2 lying on the loading device 4 can be transferred centrally relative to the conveyor tracks 25a, 25b.
[0036] Die Führungsanordnung ist durch Linearführungen 28 gebildet, die zwischen den Führungsschlitten 26a, 26b und einem Rahmen 11b angeordnet ist.The guide assembly is formed by linear guides 28, which is arranged between the guide carriage 26a, 26b and a frame 11b.
[0037] Die Verstellvorrichtung 27 ist durch einen Linearantrieb gebildet und weist nach gezeigtem Ausführungsbeispiel einen ersten und zweiten Zugmitteltrieb auf. Der erste Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 29, welches um ein Umlenkrad und ein mit einem Stellmotor 30 gekuppeltes Antriebsrad geführt ist Das Zugmittel 29 ist beispielsweise durch einen Zahnriemen, eine Kette oder dgl. gebildet und mit dem die Förderbahn 25a lagernden Führungsschlitten 26a fest verbunden ist. Der zweite Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 31, welches um ein Umlenkrad und ein mit einem Stellmotor 32 gekuppeltes Antriebsrad geführt ist. Das Zugmittel 31 ist beispielsweise durch einen Zahnriemen, eine Kette oder dgl. gebildet und mit dem die Förderbahn 25b lagernden Führungsschlitten 26b fest verbunden ist. Durch Drehen der Antriebsräder im Uhrzeigersinn oder im Gegenuhrzeigersinn, werden die Förderbahnen 25a, 25b in x-Richtung bewegt.The adjusting device 27 is formed by a linear drive and, according to the embodiment shown, has a first and a second traction mechanism drive. The first traction mechanism drive comprises an endlessly circulating traction mechanism 29 which is guided around a deflecting wheel and a drive wheel coupled to a servomotor 30. The traction mechanism 29 is formed, for example, by a toothed belt, a chain or the like and firmly connected to the guide carriage 26a which supports the conveyor track 25a is. The second traction mechanism drive comprises an endlessly circulating traction mechanism 31 which is guided around a deflecting wheel and a drive wheel coupled to a servomotor 32. The traction means 31 is formed, for example, by a toothed belt, a chain or the like and is firmly connected to the conveying track 25b overlapping guide carriage 26b. By rotating the drive wheels in a clockwise or counterclockwise direction, the conveyor tracks 25a, 25b are moved in the x-direction.
[0038] Die Förderbahnen 25a, 25b sind über eine zweite Verstellvorrichtung 33 auch in z-Richtung (Tiefenrichtung eines Ladungsträgers) zwischen einer in Fig. 2a dargestellten, eingefahrenen Übernahmestellung und einer in Fig. 2b dargestellten, ausgefahrenen Beladungsstellung synchron verstellbar. Die Förderbahnen 25a, 25b ragen in ihrer Übernahmestellung in z-Richtung am vorderen Ende der Beschickungsvorrichtung 4 vor. In der Übernahmestellung können von der Übergabevorrichtung 3 entweder eine einzelne Ladeeinheit 2 oder mehrere Ladeeinheiten 2 einer Stapelreihe aufgenommen werden.The conveyor tracks 25a, 25b are synchronously adjustable via a second adjusting device 33 also in the z-direction (depth direction of a load carrier) between a retracted take-over position shown in FIG. 2a and an extended loading position shown in FIG. 2b. The conveyor tracks 25a, 25b protrude in their takeover position in the z-direction at the front end of the charging device 4. In the transfer position, either a single loading unit 2 or a plurality of loading units 2 of a stacking row can be received by the transfer device 3.
[0039] Die Ausfahrbewegung der Förderbahnen 25a, 25b wird durch die Verstellvorrichtung 33 ermöglicht, welche durch einen Linearantrieb gebildet und nach gezeigtem Ausführungsbeispiel einen ersten und zweiten Zugmitteltrieb aufweist. Die Zugmitteltriebe umfassen jeweils ein endlos umlaufendes Zugmittel 34a, 34b, welches um ein Umlenkrad und ein Antriebsrad geführt ist. Die Antriebsräder sind über eine nicht weiters dargestellte Antriebswelle an einen gemeinsamen Verschiebemotor 35 gekuppelt. Die Zugmittel 34a, 34b sind beispielsweise durch einen Zahnriemen, eine Kette oder dgl. gebildet, an welchem ein Koppelungsschlitten 36a, 36b befestigt ist. Die Zugmitteltriebe sind jeweils auf einem Rahmengestell 37a, 37b gelagert, wovon das rechte Rahmengestell 37a mit dem die Förderbahn 25a lagernden Führungsschlitten 26a und das linke Rahmengestell 37b mit dem die Förderbahn 25b lagernden Führungsschlitten 26b fest verbunden ist. Die Drehrichtung des Verschiebemotors 33 ist reversibel, sodass entsprechend der Drehrichtung die Förderbahnen 25a, 25b ausfahren oder einfahren.The extension movement of the conveyor tracks 25a, 25b is made possible by the adjusting device 33, which is formed by a linear drive and has a first and second traction mechanism drive according to the embodiment shown. The traction mechanism drives each comprise an endlessly circulating traction means 34a, 34b, which is guided around a deflecting wheel and a drive wheel. The drive wheels are coupled via a not further shown drive shaft to a common displacement motor 35. The traction means 34a, 34b are formed for example by a toothed belt, a chain or the like, to which a coupling slide 36a, 36b is attached. The traction drives are each mounted on a frame 37a, 37b, of which the right frame 37a with the conveyor track 25a overlapping guide carriage 26a and the left frame 37b with the conveyor track 25b overlapping guide carriage 26b is firmly connected. The direction of rotation of the displacement motor 33 is reversible, so that according to the direction of rotation, the conveyor tracks 25a, 25b extend or retract.
[0040] Wie aus den Fig. ersichtlich, weisen die Förderbahnen 25a, 25b jeweils eine Fördervorrichtung mit einem Fördermittel 38, insbesondere Fördergurt, Förderband und dgl. auf, die an einem gemeinsamen Fördermotor 53 gekoppelt sind. 5/31 [0041] Andererseits kann die Fördervorrichtung der Ubergabevorrichtung 3 auch durch einen einzigen, nicht gezeigten antreibbaren Bandförderer gebildet sein. Ebenso kann die Übergabevorrichtung 3 und Beschickungsvorrichtung 4 als eine Baueinheit gemeinsam in x-Richtung verstellt werden.As can be seen from the figures, the conveyor tracks 25a, 25b each have a conveying device with a conveying means 38, in particular a conveyor belt, conveyor belt and the like, which are coupled to a common conveying motor 53. On the other hand, the conveying device of the transfer device 3 can also be formed by a single, not shown drivable belt conveyor. Likewise, the transfer device 3 and charging device 4 can be adjusted as a unit together in the x direction.
[0042] Wie in den Fig. weiters eingetragen, ist die Übergabevorrichtung 3 und Beschickungsvorrichtung 4 sowie die gegebenenfalls vorgesehene Ausrichtvorrichtung 5 über eine Verstellvorrichtung 39 entlang einer (nicht gezeigten) Führungsanordnung auch in einer vertikalen Richtung (y-Richtung) relativ verstellbar auf einem Rahmen 11c gelagert. Die Verstellvorrichtung 39 ist durch Linearantriebe gebildet und weist nach gezeigtem Ausführungsbeispiel mit den Rahmen 11a, 11b für die Übergabevorrichtung 3 und Beschickungsvorrichtung 4 verbundene Zugmitteltriebe auf. Jeder Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 40, welches um ein Umlenkrad und ein mit einem Stellmotor 41 gekuppeltes Antriebsrad geführt ist. Durch Drehbewegung des Antriebsrades im Uhrzeigersinn oder im Gegenuhrzeigersinn wird die Übergabevorrichtung 3 und Beschickungsvorrichtung 4 sowie die gegebenenfalls vorgesehene Ausrichtvorrichtung 5 vertikal und relativ zu den Ladungsträgern in y-Richtung bis zu einer von einem Rechner festgelegten y-Position bewegt.As further noted in the figures, the transfer device 3 and charging device 4 as well as the optionally provided alignment device 5 are relatively adjustable on a frame via an adjustment device 39 along a guide arrangement (not shown) also in a vertical direction (y-direction) 11c stored. The adjusting device 39 is formed by linear drives and, according to the embodiment shown, has traction mechanism drives connected to the frames 11a, 11b for the transfer device 3 and the charging device 4. Each traction mechanism drive comprises an endlessly circulating traction mechanism 40 which is guided around a deflecting wheel and a drive wheel coupled to a servomotor 41. By rotational movement of the drive wheel in a clockwise or counterclockwise direction, the transfer device 3 and charging device 4 and the optionally provided alignment device 5 is moved vertically and relative to the charge carriers in the y direction up to a y-position determined by a computer.
[0043] Wie in den Fig. schematisch dargestellt, weist die Sortiervorrichtung 6 eine Aufnahmevorrichtung 42 für die Ladeeinheiten 2 auf, welche über eine erste Verstellvorrichtung 43 in x-Richtung verstellbar auf einem Rahmen 11 d gelagert ist.As shown schematically in the figures, the sorting device 6 has a receiving device 42 for the loading units 2, which is mounted on a frame 11 d adjustable via a first adjusting device 43 in the x-direction.
[0044] Die erste Verstellvorrichtung 43 ist durch einen Linearantrieb gebildet, der nach gezeigtem Ausführungsbeispiel einen mit der Aufnahmevorrichtung 42 verbundenen Zugmitteltrieb aufweist Der Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 45, welches um ein Umlenkrad und ein mit einem Stellmotor 46 gekuppeltes Antriebsrad geführt ist Durch Drehbewegung des Antriebsrades im Uhrzeigersinn oder im Gegenuhrzeigersinn wird die Aufnahmevorrichtung 42 horizontal und relativ zu der Beschickungsvorrichtung 4 in x- Richtung bewegt [0045] Die Aufnahmevorrichtung 42 ist ferner über eine zweite Verstellvorrichtung 47 entlang einer (nicht gezeigten) Führungsanordnung in einer vertikalen Richtung (y-Richtung) relativ verstellbar auf einem Rahmen 11e gelagert. Die zweite Verstellvorrichtung 47 ist durch Linearantriebe gebildet und weist nach gezeigtem Ausführungsbeispiel mit dem Rahmen 11 d für die Sortiervorrichtung 6 verbundene Zugmitteltriebe auf. Jeder Zugmitteltrieb umfasst ein endlos umlaufendes Zugmittel 48, welches um ein Umlenkrad und ein mit einem Stellmotor 49 gekuppeltes Antriebsrad geführt ist Durch Drehbewegung des Antriebsrades im Uhrzeigersinn oder im Gegenuhrzeigersinn wird die Aufnahmevorrichtung 42 vertikal und relativ zu der Beschickungsvorrichtung 4 in y-Richtung bewegt.The first adjustment device 43 is formed by a linear drive, which has a traction mechanism connected to the receiving device 42 shown in the gezeieder embodiment of the traction drive comprises an endless circulating traction means 45 which is guided around a guide wheel and a drive motor 46 coupled to the drive wheel by rotational movement the take-up device 42 is moved horizontally relative to the feed device 4 in the x direction. The take-up device 42 is further moved via a second adjustment device 47 along a guide arrangement (not shown) in a vertical direction (y direction). Direction) relative adjustable mounted on a frame 11 e. The second adjusting device 47 is formed by linear drives and has shown embodiment shown with the frame 11 d for the sorter 6 connected traction mechanisms. Each traction mechanism drive comprises an endlessly circulating traction means 48, which is guided around a guide wheel and a drive wheel coupled to a servomotor 49. By rotating the drive wheel in a clockwise or anticlockwise direction, the receiver 42 is moved vertically and relative to the feeder 4 in the y direction.
[0046] Die Aufnahmevorrichtung 42 weist eine Übernahme- und Übergabevorrichtung 50, insbesondere eine Fördervorrichtung, beispielsweise einen Bandförderer, auf.The receiving device 42 has a transfer and transfer device 50, in particular a conveyor, such as a belt conveyor, on.
[0047] Wie in den Fig. weiters eingetragen, ist am Rahmen 11c ein über einen Stellmotor 51 in x- Richtung verfahrbarer Haltearm 52 gelagert welcher mit der Beladungsüberwachungsvorrichtung 7 zur Erfassung des Beladungszustandes, wie etwa die aktuelle Höhe des Ladestapels und/oder eine Beladungskonfiguration in einer Stapellage, ausgestattet ist, beispielsweise eine akustische oder opto-elektronische Abtasteinrichtung.As further noted in the figures, on the frame 11c, a support arm 51, which can be moved by means of a servomotor 51 in the x direction, is mounted with the load monitoring device 7 for detecting the loading state, such as the current height of the loading stack and / or a loading configuration in a stacked position, is equipped, for example, an acoustic or opto-electronic scanning device.
[0048] Die oben beschriebene Übergabevorrichtung 3, Beschickungsvorrichtung 4 und die Aufnahmevorrichtung 42 bilden jeweils eine Förderebene aus, auf der in Förderrichtung 17 hintereinander gleichzeitig mehrere Ladeeinheiten 2 gefördert werden können.The transfer device 3, charging device 4 and the receiving device 42 described above each form a conveying plane on which several loading units 2 can be conveyed in succession in the conveying direction 17 at a time.
[0049] In Fig. 3 ist ein Ausschnitt aus einem erfindungsgemäßen Kommissioniersystem dargestellt, welches in Förderrichtung der Ladeeinheiten 2 ein Verteilsystem 55 für Ladeeinheiten 2, ein Bereitstellungssystem 56 für Ladeeinheiten 2, zumindest eine Beladungsvorrichtung 1 und eine Beladungszone 57 für Ladungsträger 58.In Fig. 3 is a detail of a picking system according to the invention is shown, which in the conveying direction of the loading units 2, a distribution system 55 for loading units 2, a delivery system 56 for loading units 2, at least one loading device 1 and a loading zone 57 for charge carrier 58th
[0050] Die Beladungsvorrichtung 1 ist über das Verteilsystem 55 mit einem schematisch dargestellten Vorratslager 59 verbunden, welches als Eingangslager (Palettenlager) die auf Anliefergebinden, beispielsweise Anlieferungspalette, angelieferten Ladeeinheiten 2 in Lagerregalen 60The loading device 1 is connected via the distribution system 55 with a schematically illustrated storage 59, which as an input warehouse (pallet warehouse) on delivery containers, such as delivery pallet, delivered loading units 2 in storage shelves 60th
Merrek'MscHts jBtesiitiat AT 13 828 U1 2014-09-15 zwischen lagert Zum Ein- und Auslagern der Anlieferungspalette sind in Regalgassen zwischen den Lagerregalen 60 (nicht dargestellte) rechnergesteuerte Förderfahrzeuge angeordnet.Merrek'MscHts jBtesiitiat AT 13 828 U1 2014-09-15 between warehouses For the storage and retrieval of the delivery pallet 60 (not shown) computer-controlled transport vehicles are arranged in rack aisles between the storage racks.
[0051] Weiters kann im Vorratslager 59 zumindest eine (nicht dargestellte) Vereinzelungsvorrichtung vorgesehen werden. Nach dem Erfassen eines Kommissionierauftrages wird von einem Förderfahrzeug eine Anlieferungspalette ausgelagert und die Anlieferungspalette der Vereinzelungsvorrichtung zugeführt, mittels welcher von der Anlieferungspalette die Ladeeinheiten 2 entnommen werden. Danach werden die Ladeeinheiten 2 dem Verteilsystem 55 zugeführt.Furthermore, at least one (not shown) separating device can be provided in the storage warehouse 59. After detecting a picking order, a delivery pallet is outsourced from a conveyor vehicle and the delivery pallet is fed to the singling device, by means of which the loading units 2 are removed from the delivery pallet. Thereafter, the loading units 2 are supplied to the distribution system 55.
[0052] Das automatisierte Verteilsystem 55 umfasst nach gezeigter Ausführung eine Förderumlaufbahn 61 und mehrere, einer jeden Regalgasse zugeordnete Auslagerbahnen 62, über welche die von wenigstens einer Anlieferungspalette entnommenen, vereinzelten Ladeeinheiten 2 der Förderumlaufbahn 61 zugeführt werden. Das Verteilsystem 55 wird durch automatisierte Fördertechniken, beispielsweise Bandförderer und dgl., gebildet.The automated distribution system 55 comprises, according to the embodiment shown a conveyor circulation path 61 and a plurality of each rack aisle associated Auslagerbahnen 62, via which the at least one delivery pallet taken, isolated loading units 2 of the conveying orbit 61 are supplied. The distribution system 55 is formed by automated conveying techniques, such as belt conveyors and the like.
[0053] Das automatisierte Bereitstellungssystem 56 umfasst mehrere Bereitstellungsplätze 63, auf welchen Ladeeinheiten 2 bereitgestellt werden und die beispielsweise je durch eine Bereitstellungsbahn mit Staufunktion, wie Bandförderer und dgl. gebildet sind.The automated provisioning system 56 includes a plurality of staging areas 63 on which loading units 2 are provided and which are each constituted, for example, by a stowage provisioning lane such as belt conveyors and the like.
[0054] Die Beladungszone 57 umfasst in einer Reihe nebeneinander mehrere Stellplätze 64 für die Ladungsträger 58, welche jeweils mit einer in Fig. schematisch dargestellten Ladungsträger-Wechselvorrichtung 78 versehen sind, die beispielsweise einem antreibbaren Rollenförderer. Sobald ein Ladungsträger 58 mit einem Ladestapel vollständig beladen ist, tauscht die Ladungsträger-Wechselvorrichtung 78 den beladenen Ladungsträger 58 durch einen leeren Ladungsträger aus.The loading zone 57 comprises in a row next to each other a plurality of parking spaces 64 for the charge carriers 58, which are each provided with a schematically shown in Fig. Load carrier changing device 78, for example, a drivable roller conveyor. Once a charge carrier 58 is completely loaded with a charge stack, the charge carrier change device 78 exchanges the loaded charge carrier 58 with an empty charge carrier.
[0055] Wie aus dieser Darstellung ersichtlich, können über nur eine Beladungsvorrichtung 1 die Ladeeinheiten 2 von mehreren Bereitstellungsplätzen 63 entnommen und auf mehrere, an örtlich unterschiedlichen Stellplätzen 64 bereitgestellte Ladungsträger 58 verteilt werden.As can be seen from this illustration, the loading units 2 can be removed from a plurality of supply locations 63 and distributed to a plurality of charge carriers 58 provided at locally different locations 64 via only one loading device 1.
[0056] I m nachfolgenden wird anhand der Fig. 4 und 5, das Verfahren zur automatischen Beladung der Ladungsträger 58 mit Ladeeinheiten 2 nach einer räumlichen Beladungskonfiguration mittels der Beladungsvorrichtung 1 beschrieben.In the following, with reference to FIGS. 4 and 5, the method for the automatic loading of the load carriers 58 with loading units 2 according to a spatial loading configuration by means of the loading device 1 will be described.
[0057] Sobald ein Kommissionierauftrag, beispielsweise zur Zusammenstellung und Verladung einer Warenlieferung für eine Einzelhandelsfiliale, an einem nicht dargestellten Rechner erfasst wurde, werden die für einen Kommissionierauftrag benötigten Ladeeinheiten 2 aus dem Vorratslager 59 entnommen und der Beladungsvorrichtung 1 zugeführt. Von den Ladeeinheiten 2 werden die Ladeeinheiten-Eigenschaften (Fördereigenschaften) in einer Datenbank des Rechners elektronisch erfasst, wie die Abmessungen, Geometrie, Formstabilität, Oberflächenbeschaffenheit und/oder ein Längen/Breiten/Höhenverhältnis, und als Stammdaten in einer Datenbank abrufbar hinterlegt.As soon as a picking order, for example for compiling and loading a delivery of goods for a retail outlet, has been recorded on a computer, not shown, the loading units 2 required for a picking order are removed from the stocking 59 and fed to the loading device 1. From the loading units 2, the loading units properties (conveying properties) are electronically recorded in a database of the computer, such as the dimensions, geometry, dimensional stability, surface texture and / or a length / width / height ratio, and stored as master data in a database retrievable.
[0058] Aus diesen Daten wird eine optimierte, räumliche (dreidimensionale) Beladungskonfiguration für den Ladestapel 65, daher die Beladepositionen für die Ladeeinheiten 2 im Ladestapel 65 ermittelt bzw. für jede Ladeeinheit 2 eine x, y, z-Position im Ladestapel 65 festgelegt. Die Beladepositionen werden vom Rechner unter Berücksichtigung verschiedenster Aspekte festgelegt. So sollte der fertig gestellte Ladestapel 65 möglichst stabil und einfach transportfähig sein, daher werden schwere Ladeeinheiten 2 unten im Ladestapel 65 und leichtere Ladeeinheiten 2 oben im Ladestapel 65 positioniert. Ebenso werden empfindlichere Ladeeinheiten 2 oben im Ladestapel 65 untergebracht. Auch sollte der Ladestapel 65 möglichst dicht gepackt und möglichst hoch sein.From these data, an optimized, spatial (three-dimensional) loading configuration for the loading stack 65, therefore the loading positions for the loading units 2 in the loading stack 65 determined or set for each loading unit 2, an x, y, z position in the loading stack 65. The loading positions are determined by the computer taking into account various aspects. Thus, the finished charging stack 65 should be as stable and easy to transport as possible, therefore heavy loading units 2 are positioned below in the loading stack 65 and lighter loading units 2 above in the loading stack 65. Likewise, more sensitive loading units 2 are accommodated at the top in the loading stack 65. Also, the loading stack 65 should be packed as close as possible and as high as possible.
[0059] Demnach wird vom Rechner ein bezüglich Stabilität und/oder Volumenausnutzung des Ladestapels 65 optimierte Beladungskonfiguration bzw. die optimierten Beladepositionen für die Ladeeinheiten 2 ermittelt.Accordingly, the computer determines a loading configuration optimized for stability and / or volume utilization of the loading stack 65 or the optimized loading positions for the loading units 2.
[0060] Auch kann anhand dieser Daten zu den Ladeeinheiten 2 bzw. der Ladeeinheiten- Eigenschaften der Abstand zwischen den Fördervorrichtungen 18a, 18b der Ausrichtvorrichtung 5 7/31Also, on the basis of these data on the loading units 2 or the loading unit properties, the distance between the conveying devices 18a, 18b of the alignment device 5 7/31
AT 13 828 U1 2014-09-15 und/oder Förderbahnen 25a, 25b eingestellt werden, wie dies in der WO 2009/094681 A1 detailliert beschrieben ist.AT 13 828 U1 2014-09-15 and / or conveyor tracks 25a, 25b are set as described in detail in WO 2009/094681 A1.
[0061] Darüber hinaus kann anhand der Daten zu den Ladeeinheiten 2 eine Auswertung der Abmessungen der Ladeeinheiten 2 durchgeführt werden.In addition, based on the data on the loading units 2, an evaluation of the dimensions of the loading units 2 are performed.
[0062] Aus dem breiten Sortiment von mehreren Tausend unterschiedlichen Ladeeinheiten 2 werden Abmessungsklassen festgelegt und vom Rechner die Ladeeinheiten 2 den Abmessungsklassen zugeordnet Die Abmessungsklassen können in beliebiger Anzahl variieren und beliebige Abmessungsbereiche (Länge, Breite, Höhe) definieren. Jede Abmessungsklasse umfasst üblicherweise mehrere Hunderte Ladeeinheiten 2 mit unterschiedlichen Abmessungen.From the wide range of several thousand different loading units 2 dimensional classes are determined and assigned by the computer, the loading units 2 the dimension classes The dimensional classes can vary in any number and arbitrary dimensions ranges (length, width, height) define. Each dimension class usually includes several hundreds of load units 2 of different dimensions.
[0063] Die Stapelleistung der Beladungsvorrichtung 1 kann in vorteilhafter Weise erhöht werden, wenn der Rechner die Abmessungen der für einen Kommissionierauftrag benötigten Ladeeinheiten 2 analysiert, die Ladeeinheiten 2 nach Abmessungsklassen vorsortiert und nach der Beladungskonfiguration endsortiert und danach als Stapelreihe(n) verdichtet auf die Beladepositionen ablegt. Hierzu werden, nachdem ein Kommissionierauftrag erfasst wurde, die Abmessungen aller oder nur einiger der für diesen Kommissionierauftrag benötigten Ladeeinheiten 2 durch eine Rechenlogik, insbesondere ein am Rechner laufendes Computerprogramm, verglichen und zumindest einige der Ladeeinheiten 2 entsprechend ihren Abmessungen in eine oder mehreren Abmessungsklassen eingeteilt.The stacking capacity of the loading device 1 can be advantageously increased when the computer analyzes the dimensions of the loading units 2 required for a picking order, pre-sorting the loading units 2 according to dimensional classes and after the loading configuration ends sorted and then compressed as a stack row (s) on the Loading positions stores. For this purpose, after a picking order has been detected, the dimensions of all or only some of the loading units 2 required for this picking order are compared by a computer logic, in particular a computer program running on the computer, and at least some of the loading units 2 are divided into one or more dimension classes according to their dimensions.
[0064] Die Sortierung nach Abmessungsklassen kann dadurch erfolgen, dass die Ladeeinheiten 2 vom Förderfahrzeug (Entnahme-Fördertechnik) in der erforderlichen Reihenfolge aus dem automatischen Vorratslager 59 ausgelagert und gruppiert als Stapelreihe vom Verteilsystem 55 zu wenigstens einem der Bereitstellungsplätze 63 gefördert werden. Andererseits kann auch das Verteilsystem 55 eine Sortierfunktion aufweisen.The sorting according to dimensional classes can be carried out by the loading units 2 from the conveyor vehicle (removal conveyor) outsourced in the required order from the automatic storage warehouse 59 and grouped as a stack row from the distribution system 55 to at least one of the staging 63 promoted. On the other hand, the distribution system 55 may also have a sorting function.
[0065] Nach einer anderen Ausführung kann eine Sortierung nach Kommissionieraufträgen erfolgen, indem vom Förderfahrzeug (Entnahme-Fördertechnik) die für einen Kommissionierauftrag benötigten Ladeeinheiten 2 nacheinander aus dem automatischen Vorratslager 59 ausgelagert und vom Verteilsystem 55 in der Auslagerreihenfolge zu wenigstens einem der Bereitstellungsplätze 63.1 bis 63.4 gefördert werden.According to another embodiment, sorting can be done by picking orders by the transport vehicle (removal conveyor) required for a picking order loading units 2 sequentially outsourced from the automatic storage warehouse 59 and from the distribution system 55 in the Auslagerreihenfolge to at least one of the stalls 63.1 to 63.4 be promoted.
[0066] Demnach bildet das ohnehin vorhandene Förderfahrzeug eine Sortiervorrichtung aus, mit dem eine „Vorsortierung“ der Ladeeinheiten 2 nach einer Ladeeinheiten-Eigenschaft, beispielsweise Abmessungsklassen, und/oder Kommissionieraufträgen erfolgen kann. Die „Endsortierung“ der Ladeeinheiten 2 in eine durch die Beladungskonfiguration bestimmte Beladungsreihenfolge erfolgt durch die Sortiervorrichtung 6 der Beladungsvorrichtung 1, wie im nachfolgenden beschrieben.Accordingly, the already existing conveyor vehicle forms a sorting device, with which a "pre-sorting" of the loading units 2 can take place according to a loading unit property, for example dimension classes, and / or picking orders. The "final sorting" of the loading units 2 into a loading order determined by the loading configuration is carried out by the sorting device 6 of the loading device 1, as described below.
[0067] Nach einer ersten Ausführung, gemäß den Fig. 4a bis 4g, werden auf den Bereitstellungsplätzen 63.1, 63.2, 63.3 Ladeeinheiten 2.1, 2.2, 2.3 bereitgestellt, die einer Abmessungsklasse angehören, aber sich in einer anderen Eigenschaft, beispielsweise Formstabilität, unterscheiden und in eine durch die Beladungskonfiguration bestimmten Beladungsreihenfolge sortiert werden sollen.According to a first embodiment, according to FIGS. 4a to 4g, loading units 2.1, 2.2, 2.3 are provided on the staging areas 63.1, 63.2, 63.3, which belong to a dimension class but differ in another property, for example dimensional stability, and should be sorted into a load order determined by the load configuration.
[0068] Die Ladeeinheit 2.2 soll auf dem Ladungsträger 58.2 an einer mittleren Beladeposition 70 zwischen den Ladeeinheiten 2.1, 2.3 platziert werden. Die Sortierung der Ladeeinheiten 2.1, 2.2, 2.3 in die erforderliche Beladungsreihenfolge erfolgt durch die Reihenfolge der Entnahme von den Bereitstellungsplätzen 63.1, 63.2, 63.3. Hierzu wird die Aufnahmevorrichtung 42 von einem nicht dargestellten Rechner gesteuert in x-Richtung zwischen den Übernahmestellungen vor die Bereitstellungsplätze 63.1, 63.2, 63.3 verfahren. Der Rechner wertet die Reihenfolge der Ladeeinheiten 2.1, 2.2, 2.3, wie sie zu den Bereitstellungsplätzen 63.1, 63.2, 63.3 angefördert werden, aus und wird vom Rechner aus der Förderreihenfolge bestimmt, in welcher Reihenfolge die Aufnahmevorrichtung 42 von den Bereitstellungsplätzen 63.1, 63.2, 63.3 die Ladeeinheiten 2.1.2.2, 2.3 übernehmen soll.The loading unit 2.2 is to be placed on the load carrier 58.2 at a middle loading position 70 between the loading units 2.1, 2.3. The sorting of the loading units 2.1, 2.2, 2.3 in the required loading order is carried out by the order of removal of the staging places 63.1, 63.2, 63.3. For this purpose, the receiving device 42 is controlled by a computer, not shown, in the x-direction between the takeover positions in front of the stations 63.1, 63.2, 63.3. The computer evaluates the order of the loading units 2.1, 2.2, 2.3, as they are conveyed to the staging areas 63.1, 63.2, 63.3, and is determined by the computer from the conveyor sequence, in which order the receiving device 42 from the stalls 63.1, 63.2, 63.3 the loading units 2.1.2.2, 2.3 should take over.
[0069] Entsprechend der ermittelten Übernahmereihenfolge wird die Aufnahmevorrichtung 42 vorerst in die erste Übernahmestellung (Fig. 4b) in x-Richtung bewegt, in welcher die erste 8/31According to the determined acquisition sequence, the receiving device 42 is initially moved in the first transfer position (Fig. 4b) in the x direction, in which the first 8/31
AT13 828U1 2014-09-15AT13 828U1 2014-09-15
Ladeeinheit 2.1 auf die Aufnahmevorrichtung 42 gefördert wird. Danach wird die Aufnahmevorrichtung 42 in die zweite Übernahmestellung (Fig. 4c) in x-Richtung bewegt, in welcher die zweite Ladeeinheit 2.2 auf die Aufnahmevorrichtung 42 gefördert wird. Zuletzt wird die Aufnahmevorrichtung 42 in die dritte Übernahmestellung (Fig. 4d) in x-Richtung bewegt, in welcher die dritte Ladeeinheit 2.3 auf die Aufnahmevorrichtung 42 gefördert wird. Während der Übernahme einer Ladeeinheit 2.2, 2.3 vom Bereitstellungsplatz 63.1, 63.2, 63.3 auf die Aufnahmevorrichtung 42 wird eine sich bereits auf der Aufnahmevorrichtung 42 befindliche Ladeeinheit 2.1, 2.2 mittels der Übernahme- und Übergabevorrichtung 50 in Richtung auf die Beschickungsvorrichtung 4 (Förderrichtung 17) gefördert.Loading unit 2.1 is promoted to the receiving device 42. Thereafter, the receiving device 42 is moved in the second transfer position (Fig. 4c) in the x direction, in which the second loading unit 2.2 is conveyed to the receiving device 42. Finally, the receiving device 42 is moved in the third transfer position (FIG. 4d) in the x direction, in which the third loading unit 2.3 is conveyed onto the receiving device 42. During the transfer of a loading unit 2.2, 2.3 from the provisioning station 63.1, 63.2, 63.3 onto the receiving device 42, a loading unit 2.1, 2.2 already located on the receiving device 42 is conveyed by means of the transfer and transfer device 50 in the direction of the charging device 4 (conveying direction 17) ,
[0070] Somit sind die Ladeeinheiten 2.1, 2.2, 2.3 auf der Aufnahmevorrichtung 42 in der durch die Beladungskonfiguration, daher Abmessungen und Formstabilität der Ladeeinheiten 2.1, 2.2, 2.3 bestimmten Beladungsreihenfolge sortiert. Nach gezeigter Ausführung gehören die Ladeeinheiten 2.1, 2.2, 2.3 einem Kommissionierauftrag an und werden als Stapelreihe 71 auf einen der Ladungsträger 58.2 geladen.Thus, the loading units 2.1, 2.2, 2.3 are sorted on the receiving device 42 in the load configuration, therefore dimensions and dimensional stability of the loading units 2.1, 2.2, 2.3 determined loading order. According to the embodiment shown, the loading units 2.1, 2.2, 2.3 belong to a picking order and are loaded as stack row 71 onto one of the load carriers 58.2.
[0071] Die Aufnahmevorrichtung 42 wird nach der Übernahme der Ladeeinheiten 2.1, 2.2, 2.3 vom Rechner gesteuert in x-Richtung und/oder y-Richtung in eine Übergabestellung relativ zur Beschickungsvorrichtung 4 verfahren, in welcher die Ladeeinheiten 2.1, 2.2, 2.3 von der Aufnahmevorrichtung 42 auf die Beschickungsvorrichtung 4 gefördert werden (Fig. 4e-f).The receiving device 42 is after the acquisition of the loading units 2.1, 2.2, 2.3 controlled by the computer in the x-direction and / or y-direction in a transfer position relative to the charging device 4 method, in which the loading units 2.1, 2.2, 2.3 of the Receiving device 42 are fed to the feeder 4 (Fig. 4e-f).
[0072] Dabei kann die Übergabestellung der Aufnahmevorrichtung 42 entweder durch die Beladepositionen 70 in x-Richtung und y-Richtung der aktuell geförderten Ladeeinheiten 2.1, 2.2, 2.3 oder durch eine Ist-Position der Beschickungsvorrichtung 4 in x-Richtung und y-Richtung festgelegt werden.In this case, the transfer position of the receiving device 42 can be determined either by the loading positions 70 in the x-direction and y-direction of the currently conveyed loading units 2.1, 2.2, 2.3 or by an actual position of the feeder 4 in the x-direction and y-direction become.
[0073] Danach werden die Ladeeinheiten 2.1, 2.2, 2.3 von der Beschickungsvorrichtung 4 auf die Übergabevorrichtung 3 gefördert (Fig. 4g). Die Ladeeinheiten 2.1, 2.2, 2.3 können zuvor durch die Ausrichtvorrichtung (Fig. 1) in zur Förderrichtung 17 paralleler Richtung ausgerichtet werden.Thereafter, the loading units 2.1, 2.2, 2.3 are conveyed from the loading device 4 to the transfer device 3 (FIG. 4g). The loading units 2.1, 2.2, 2.3 can be aligned in advance by the alignment device (FIG. 1) in a direction parallel to the conveying direction 17.
[0074] Da die Bewegungen der Beschickungsvorrichtung 4 und Sortiervorrichtung 6 entkoppelt ausgeführt werden, können noch während die die Ladeeinheiten 2.1, 2.2, 2.3 von der Beschickungsvorrichtung 4 bzw. deren Übergabevorrichtung 3 an die Beladepositionen gefördert werden, gleichzeitig die nächsten Ladeeinheiten 2 sortiert werden (Fig. 4g), welche auf denselben Ladungsträger 58.2 in der darüber liegenden Stapellage 73 oder wenigstens einen der anderen Ladungsträger 58.1,58.3, 58.4 geladen werden sollen.Since the movements of the feeder 4 and sorting device 6 are performed decoupled, while the loading units 2.1, 2.2, 2.3 are conveyed from the feeder 4 and their transfer device 3 to the loading positions, at the same time the next loading units 2 are sorted ( 4g), which are to be loaded onto the same charge carrier 58.2 in the overlying stack layer 73 or at least one of the other charge carriers 58.1, 58.3, 58.4.
[0075] Vor der Übergabe der Ladeeinheiten 2.1, 2.2, 2.3 der Stapelreihe 70 auf die Übergabevorrichtung 3 werden die Förderbahnen 25a, 25b noch in die Übernahmestellung bewegt, in welcher abhängig von der Ladeeinheiten-Eigenschaft der Abstand 72 (Fig. 4f) zwischen den Förderbahnen 25a, 25b eingestellt ist und die Ladeeinheiten 2.1,2.2, 2.3 relativ zu den Förderbahnen 25a, 25b mittig übergeben werden. Der Abstand 72 wird auf die kleinste Breite der Ladeeinheiten 2.1,2.2, 2.3 einer Stapelreihe 71 eingestellt. Danach wird die Stapelreihe 71 von der Beschickungsvorrichtung 4 auf die Übergabevorrichtung 3 gefördert. Befindet sich die Stapelreihe 71 auf der Übergabevorrichtung 3, wird diese in x, y, z-Richtung soweit verfahren, dass die Stapelreihe 71 an der vorgesehenen x, y, z-Position im Ladestapel 65 positioniert ist.Before the transfer of the loading units 2.1, 2.2, 2.3 of the stack row 70 on the transfer device 3, the conveyor tracks 25a, 25b are still moved to the transfer position, in which depending on the loading units property of the distance 72 (Fig. 4f) between the Conveyor tracks 25a, 25b is set and the loading units 2.1,2.2, 2.3 are handed over centrally relative to the conveyor tracks 25a, 25b. The distance 72 is set to the smallest width of the load units 2.1, 2.2, 2.3 of a stack row 71. Thereafter, the stack row 71 is conveyed from the feeder 4 to the transfer device 3. If the stack row 71 is located on the transfer device 3, it is moved in the x, y, z direction until the stack row 71 is positioned at the intended x, y, z position in the loading stack 65.
[0076] Sind die Ladeeinheiten 2.1, 2.2, 2.3 auch in eine durch die Beladungskonfiguration bestimmte Beladungsreihenfolge sortiert und auf die Beschickungsvorrichtung 4 gefördert worden, erfolgt die Beladung wenigstens eines Ladungsträgers 58.2.If the loading units 2.1, 2.2, 2.3 have also been sorted into a loading sequence determined by the loading configuration and conveyed to the loading device 4, the loading of at least one load carrier 58.2 takes place.
[0077] Der Beladevorgang des Ladungsträgers 58.2 wird anhand der Fig. 2 beschrieben, wobei nach gezeigtem Ausführungsbeispiel in zumindest einer von mehreren Stapellagen 73 in einem einzigen Beladezyklus beispielsweise drei Ladeeinheiten 2.1, 2.2, 2.3, daher eine Stapelreihe 71 an die Beladepositionen 70 abgegeben werden.The loading process of the load carrier 58.2 will be described with reference to FIG. 2, wherein, according to the embodiment shown in at least one of several stack layers 73 in a single loading cycle, for example, three loading units 2.1, 2.2, 2.3, therefore a stack row 71 are discharged to the loading positions 70 ,
[0078] Nachdem die Ladeeinheiten 2.1, 2.2, 2.3 der Stapelreihe 71 von der Übergabevorrichtung 3 übernommen wurden, werden die Förderbahnen 25a, 25b aus ihrer in Fig. 2a gezeigten Übernahmestellung relativ zur Beschickungsvorrichtung 4 in die in Fig. 2b gezeigte erste Bela- 9/31 ästerreidBsd!« pitwiarot AT 13 828 U1 2014-09-15 destellung ausgefahren, in welcher sich die relativ zur Ausfahrrichtung 74 erste Ladeeinheit 2.1 oberhalb ihrer vorgesehenen x, y, z-Position im Ladestapel 65 befindet. Die Ladeeinheiten 2.1, 2.2, 2.3 liegen auf den Fördermitteln 38 auf. Während der Ausfahrbewegung der Förderbahnen 25a, 25b können durch Antrieb der Fördermittel 38 die Ladeeinheiten 2.1, 2.2, 2.3 auf der Übergabevorrichtung 3 positioniert werden, insbesondere bis an dessen vorderes Ende transportiert werden.After the loading units 2.1, 2.2, 2.3 of the stack row 71 have been taken over by the transfer device 3, the conveyor tracks 25a, 25b are moved from their transfer position shown in FIG. 2a relative to the loading device 4 into the first load 9 shown in FIG / 31 asterreidBsd! "Pitwiarot in which the first loading unit 2.1 relative to the extension direction 74 is located above its intended x, y, z position in the loading stack 65. The loading units 2.1, 2.2, 2.3 rest on the conveying means 38. During the extension movement of the conveyor tracks 25a, 25b, the loading units 2.1, 2.2, 2.3 can be positioned on the transfer device 3 by driving the conveying means 38, in particular transported to the front end thereof.
[0079] Danach werden die Förderbahnen 25a, 25b zusammen mit den Fördermitteln 38 in Rückfahrrichtung 75 zurückgezogen, wobei gleichzeitig die Fördermittel 38 auflageseitig über den Fördermotor 53 entgegen der Rückfahrrichtung 75 in Förderrichtung 17 der Ladeeinheiten 2.1, 2.2, 2.3 angetrieben wird. Die Fördergeschwindigkeit der Fördermittel 38 entspricht dabei betragsmäßig der Rückfahrgeschwindigkeit der Förderbahnen 25a, 25b, sodass die Fördermittel 38, insbesondere die Förderbänder unten an der Unterseite der Ladeeinheiten 2.1, 2.2, 2.3 ohne Relativverschiebung zu den Ladeeinheiten 2.1,2.2, 2.3 verstellt werden. Der ersten Ladeeinheit 2.1 wird ihre Auflage auf den Fördermitteln 38 entzogen, sodass sie mit ihren in Rückfahrrichtung 75 hinterem Ende auf die tiefer gelegene Ladeebene 76 des Ladungsträgers 58.2 oder einer Stapellage kippt und an der ersten Beladeposition 70 abgestellt wird, wie in den Fig. 2b und 2c dargestellt.Thereafter, the conveyor tracks 25a, 25b are withdrawn together with the conveying means 38 in the return direction 75, wherein at the same time the conveyor 38 on the support side on the conveyor motor 53 against the return direction 75 in the conveying direction 17 of the loading units 2.1, 2.2, 2.3 is driven. The conveying speed of the conveying means 38 corresponds in magnitude to the return speed of the conveyor tracks 25a, 25b, so that the conveying means 38, in particular the conveyor belts are adjusted down to the bottom of the loading units 2.1, 2.2, 2.3 without relative displacement to the loading units 2.1,2.2, 2.3. The first loading unit 2.1 is deprived of its support on the conveyor 38, so that it tilts with their rear end in the direction 75 on the lower level loading level 76 of the carrier 58.2 or a stacking layer and is turned off at the first loading position 70, as in Figs. 2b and 2c.
[0080] Die Förderbahnen 25a, 25b werden, nachdem die erste Ladeeinheit 2.1 abgelegt wurde, in Rückfahrrichtung 75 in eine zweite Beladestellung bewegt und gleichzeitig die Fördermittel 38 auflageseitig über den Fördermotor 39 entgegen der Rückfahrrichtung 75 in Förderrichtung 17 der Ladeeinheiten 2.2, 2.3 angetrieben, sodass nun auch der zweiten Ladeeinheit 2.2 ihre Auflage auf den Fördermitteln 38 entzogen wird und die zweite Ladeeinheit 2.2 mit ihren in Rückfahrrichtung 75 hinterem Ende auf die tiefer gelegene Ladeebene 80 des Ladungsträgers 58.2 oder einer Stapellage kippt und an der zweiten Beladeposition 70 abgestellt wird, wie in den Fig. 2d und 2e dargestellt In der zweiten Beladestellung befindet sich die relativ zur Ausfahrrichtung 74 zweite Ladeeinheit 2.2 oberhalb ihrer vorgesehenen x, y, z-Position im Ladestapel 65.After the first loading unit 2.1 has been stored, the conveyor tracks 25a, 25b are moved in the return direction 75 into a second loading position and at the same time the conveying means 38 are driven on the support side 39 against the return direction 75 in the conveying direction 17 of the loading units 2.2, 2.3, so that now also the second loading unit 2.2 their support on the conveyor 38 is withdrawn and the second loading unit 2.2 tilts with their back in the rear direction 75 rear end on the lower level 80 of the load carrier 58.2 or a stacking layer and is turned off at the second loading position 70, such as 2d and 2e shown in the second loading position is the second loading unit 2.2 relative to the extension direction 74 above its intended x, y, z position in the loading stack 65th
[0081] Auf gleiche Weise wird auch die dritte Ladeeinheit 2.3 an der dritten Beladeposition 70 abgestellt, wie nicht weiters dargestellt.In the same way, the third loading unit 2.3 is turned off at the third loading position 70, as not shown further.
[0082] Nachdem auch die dritte Ladeeinheit 2.3 abgelegt wurde, fahren die Förderbahnen 25a, 25b in ihre Übernahmestellung zurück, wo sie neuerlich eine einzelne Ladeeinheit 2 oder mehrere Ladeeinheiten 2 einer Stapelreihe 71 übernehmen.After the third loading unit 2.3 has been stored, drive the conveyor tracks 25a, 25b back to their transfer position, where they take over a single loading unit 2 or more loading units 2 a stack row 71 again.
[0083] Ist eine Stapellage 73 fertig gestellt, werden zur Bildung einer nächsten Stapellage 73 die Übergabe- und Beschickungsvorrichtung 3,4 sowie gegebenenfalls die Ausrichtvorrichtung 5 in y-Richtung angehoben.If a stacking layer 73 is completed, the transfer and charging device 3,4 and optionally the alignment device 5 are raised in the y-direction to form a next stack layer 73.
[0084] Dieser Beladevorgang ist von Vorteil, da die Übergabevorrichtung 3 in einem einzigen Beladezyklus gleichzeitig mehrere Ladeeinheiten 2 manipuliert. Dadurch wird gegenüber solchen aus dem Stand der Technik bekannten Beladevorgängen, bei denen eine erste Ladeeinheit von der Übergabevorrichtung übernommen und an die erste Beladeposition gefördert wird und danach eine zweite Ladeeinheit von der Übergabevorrichtung übernommen und an die zweite Beladeposition gefördert wird, die Anzahl der Verstellbewegungen der Übergabevorrichtung 3 in z-Richtung erheblich reduziert und damit eine wesentliche Leistungssteigerung der Beladungsvorrichtung 1 erreicht.This loading process is advantageous since the transfer device 3 simultaneously manipulates a plurality of loading units 2 in a single loading cycle. This is compared to such known from the prior art loading operations, in which a first loading unit is taken over by the transfer device and conveyed to the first loading position and then a second loading unit is taken over by the transfer device and conveyed to the second loading position, the number of adjustment movements of Transfer device 3 significantly reduced in the z-direction and thus achieved a significant increase in performance of the loading device 1.
[0085] Wie in Fig. 2 eingetragen, ist eine Ladehilfe 77 vorgesehen, die den sich bildenden Ladestapel 65 von drei Seiten umgibt und so als Abstützfläche für eine Schiebebewegung der Ladeeinheit 2 in Horizontalrichtung dienen kann.Registered as in Fig. 2, a loading aid 77 is provided which surrounds the forming charging stack 65 from three sides and can serve as a support surface for a sliding movement of the loading unit 2 in the horizontal direction.
[0086] Wie in Fig. 4a durch den Doppelpfeil angedeutet, wird während dem Beladevorgang des Ladungsträgers 58.2 am vierten Stellplatz 64 der mit einem Ladestapel 65 beladene Ladungsträger 58.4 abgefördert und ein leerer Ladungsträger 58.4 bereitgestellt werden. Die Stellplätze 64 sind hierzu mit einer Ladungsträger-Wechselvorrichtung 78 (Fig. 2) ausgestattet, der beispielsweise durch einen antreibbaren Rollenförderer gebildet ist. 10/31As indicated in FIG. 4a by the double arrow, the charge carrier 58.4 loaded with a charging stack 65 is carried away at the fourth parking space 64 during the loading process of the charge carrier 58.2 and an empty charge carrier 58.4 is provided. The parking spaces 64 are for this purpose equipped with a charge carrier changing device 78 (FIG. 2), which is formed, for example, by a drivable roller conveyor. 10/31
AT13 828U1 2014-09-15 [0087] Nach einer zweiten Ausführung, gemäß den Fig. 5a bis 5h, werden auf den Bereitstellungsplätzen 63.1, 63.4 Ladeeinheiten 2.1, 2.2, 2.3 bereitgestellt, die unterschiedlichen Kommissionieraufträgen angehören und in eine durch die Kommissionieraufträge bestimmten Beladungsreihenfolge sortiert werden sollen.According to a second embodiment, according to FIGS. 5a to 5h, loading units 2.1, 2.2, 2.3 are provided on the staging areas 63.1, 63.4, which belong to different order-picking orders and into a loading order determined by the order-picking orders should be sorted.
[0088] Die Sortierung der Ladeeinheiten 2.1, 2.2, 2.3 in die erforderliche Beladungsreihenfolge erfolgt durch die Reihenfolge der Entnahme von den Bereitstellungsplätzen 63.1, 63.4. Hierzu wird die Aufnahmevorrichtung 42 von einem nicht dargestellten Rechner gesteuert in x- Richtung zwischen den Übernahmestellungen vor die Bereitstellungsplätzen 63.1, 63.4 verfahren. Der Rechner wertet die Reihenfolge der Ladeeinheiten 2.1, 2.2, 2.3, wie sie zu den Bereitstellungsplätzen 63.1, 63.4 angefördert werden, aus und wird vom Rechner aus der Förderreihenfolge bestimmt, in welcher Reihenfolge die Aufnahmevorrichtung 42 von den Bereitstellungsplätzen 63.1,63.4 die Ladeeinheiten 2.1,2.2, 2.3 übernehmen soll.The sorting of the loading units 2.1, 2.2, 2.3 in the required loading order is carried out by the order of removal of the staging places 63.1, 63.4. For this purpose, the receiving device 42 is controlled by a computer, not shown, in the x direction between the takeover positions in front of the staging areas 63.1, 63.4. The computer evaluates the order of the loading units 2.1, 2.2, 2.3, as they are conveyed to the staging areas 63.1, 63.4, and is determined by the computer from the delivery order, in which order the receiving device 42 from the staging places 63.1,63.4 the loading units 2.1, 2.2, 2.3 should take over.
[0089] Entsprechend der ermittelten Übernahmereihenfolge wird die Aufnahmevorrichtung 42 vorerst in die erste Übernahmestellung (Fig. 5b) in x-Richtung bewegt, in welcher die erste und zweite Ladeeinheit 2.1, 2.2 auf die Aufnahmevorrichtung 42 gefördert wird. Danach wird die Aufnahmevorrichtung 42 in die zweite Übernahmestellung (Fig. 5c) in x-Richtung bewegt, in welcher die dritte Ladeeinheit 2.3 auf die Aufnahmevorrichtung 42 gefördert wird.In accordance with the acquisition sequence determined, the receiving device 42 is initially moved in the first takeover position (FIG. 5b) in the x direction, in which the first and second loading unit 2.1, 2.2 are conveyed onto the receiving device 42. Thereafter, the receiving device 42 is moved in the second transfer position (Fig. 5c) in the x direction, in which the third loading unit 2.3 is conveyed to the receiving device 42.
[0090] Somit sind die Ladeeinheiten 2.1, 2.2, 2.3 auf der Aufnahmevorrichtung 42 in der durch die Kommissionieraufträge bestimmten Beladungsreihenfolge sortiert.Thus, the loading units 2.1, 2.2, 2.3 are sorted on the receiving device 42 in the order of loading determined by the order picking.
[0091] Die Aufnahmevorrichtung 42 wird nach der Übernahme der Ladeeinheiten 2.1, 2.2, 2.3 vom Rechner gesteuert in x-Richtung und/oder y-Richtung in eine Übergabestellung relativ zur Beschickungsvorrichtung 4 verfahren, in welcher die Ladeeinheiten 2.1, 2.2, 2.3 von der Aufnahmevorrichtung 42 auf die Beschickungsvorrichtung 4 gefördert werden (Fig. 5d-e).The pickup device 42 is after the acquisition of the loading units 2.1, 2.2, 2.3 controlled by the computer in the x-direction and / or y-direction in a transfer position relative to the charging device 4 method, in which the loading units 2.1, 2.2, 2.3 of the Receiving device 42 are fed to the feeder 4 (Fig. 5d-e).
[0092] Dabei kann die Übergabestellung der Aufnahmevorrichtung 42 entweder durch die Beladepositionen 70 in x-Richtung und y-Richtung der aktuell geförderten Ladeeinheit 2.1; 2.2; 2.3 oder durch eine Ist-Position der Beschickungsvorrichtung 4 in x-Richtung und y-Richtung festgelegt werden.In this case, the transfer position of the receiving device 42 either by the loading positions 70 in the x-direction and y-direction of the currently promoted loading unit 2.1; 2.2; 2.3 or be determined by an actual position of the feeder 4 in the x-direction and y-direction.
[0093] Danach wird, wie in Fig. 5f ersichtlich, die erste Ladeeinheit 2.1 von der Beschickungsvorrichtung 4 auf die Übergabevorrichtung 3 gefördert und die Übergabevorrichtung 3 zu dem für den ersten Kommissionierauftrag bereitgestellten Ladungsträger 58.1 in x, y, z-Richtung soweit verfahren, dass die erste Ladeeinheit 2.1 an der vorgesehenen x, y, z-Position im Ladestapel 65 positioniert ist. Die erste Ladeeinheit 2.1 wird in oben beschriebener Weise an der Beladeposition auf den Ladungsträger 58.1 geladen.Thereafter, as can be seen in FIG. 5f, the first loading unit 2.1 is conveyed by the loading device 4 onto the transfer device 3 and the transfer device 3 is moved in the x, y, z direction to the charge carrier 58.1 provided for the first picking order, the first loading unit 2.1 is positioned at the intended x, y, z position in the loading stack 65. The first loading unit 2.1 is loaded in the manner described above at the loading position on the charge carrier 58.1.
[0094] Wurde die erste Ladeeinheit 2.1 abgegeben, wird gemäß Fig. 5g die zweite Ladeeinheit 2.2 von der Beschickungsvorrichtung 4 auf die Übergabevorrichtung 3 gefördert und die Übergabevorrichtung 3 zu dem für den zweiten Kommissionierauftrag bereitgestellten Ladungsträger 58.3 in x, y, z-Richtung soweit verfahren, dass die zweite Ladeeinheit 2.1 an der vorgesehenen x, y, z-Position im Ladestapel 65 positioniert ist. Die erste Ladeeinheit 2.1 wird in oben beschriebener Weise an der Beladeposition auf den Ladungsträger 58.3 geladen.5g, the second loading unit 2.2 is conveyed from the loading device 4 to the transfer device 3, and the transfer device 3 to the charge carrier 58.3 provided in the x, y, z direction for the second picking order method that the second loading unit 2.1 is positioned at the intended x, y, z position in the loading stack 65. The first loading unit 2.1 is loaded in the manner described above at the loading position on the charge carrier 58.3.
[0095] Auf gleiche Weise wird auch die dritte Ladeeinheit 2.3 auf den, für den dritten Kommissionierauftrag bereitgestellten Ladungsträger 58.5 geladen, wie in Fig. 5h dargestellt. In Fig. 5h wird auch der Beginn eines neuerlichen Sortierganges gezeigt.In the same way, the third loading unit 2.3 is loaded onto the charge carrier 58.5 provided for the third picking order, as shown in FIG. 5h. In Fig. 5h also the beginning of a new sorting cycle is shown.
[0096] Nach einer (nicht gezeigten) dritten Ausführung werden auf den Bereitstellungsplätzen 63.1, 63.2, 63.3, 63.4 Ladeeinheiten 2.1, 2.2, 2.3, 2.4 bereitgestellt, die einem Kommissionierauftrag angehören, aber noch nicht bezüglich einer oder mehreren Ladeeinheiten-Eigenschaf-ten, wie Geometrie, Oberflächenbeschaffenheit und/oder Längen/Breiten/Höhenverhältnis und dgl., in eine durch die Beladungskonfiguration bestimmte Beladungsreihenfolge sortiert sind.According to a third embodiment (not shown), loading units 2.1, 2.2, 2.3, 2.4 are provided on the staging areas 63.1, 63.2, 63.3, 63.4 which belong to a picking order, but not yet with regard to one or more loading unit properties. such as geometry, surface finish, and / or lengths / widths / height ratios and the like, are sorted into a load order determined by the load configuration.
[0097] Somit können nach der ersten und dritten Ausführung die für einen Kommissionierauftrag, der einen oder mehrere Ladungsträger 58 umfassen kann, benötigten Ladeeinheiten 2 in die, durch den Kommissionierauftrag und die Beladungskonfiguration bestimmte Beladungsrei- 11 /31Thus, according to the first and third embodiments, the loading units 2 required for a picking order, which may include one or more load carriers 58, can be loaded into the loading rows determined by the picking order and the loading configuration
palsiiasst AT13 828U1 2014-09-15 henfolge sortiert werden.palsiiasst AT13 828U1 2014-09-15 order.
[0098] Die Sortierung der Ladeeinheiten 2.1,2.2, 2.3, 2.4 in die erforderliche Beladungsreihenfolge erfolgt wiederum durch die Reihenfolge der Entnahme von den Bereitstellungsplätzen 63.1, 63.2, 63.3, 63.4, wie oben beschrieben. Nach der Sortierung sind die Ladeeinheiten 2.1, 2.2, 2.3, 2.4 auf der Aufnahmevorrichtung 42 zu einem Kommissionierauftrag und in der erforderlichen Beladungsreihenfolge sortiert, sodass die Ladeeinheiten 2.1, 2.2, 2.3, 2.4 auf einen der Ladungsträger 58 geladen werden können.The sorting of the load units 2.1,2.2, 2.3, 2.4 in the required loading order is again by the order of removal of the staging places 63.1, 63.2, 63.3, 63.4, as described above. After sorting, the loading units 2.1, 2.2, 2.3, 2.4 are sorted on the receiving device 42 into a picking order and in the required loading order, so that the loading units 2.1, 2.2, 2.3, 2.4 can be loaded onto one of the load carriers 58.
[0099] Es sei an dieser Stelle darauf hingewiesen, dass ein Kommissionierauftrag auch mehrere Ladungsträger 58 umfassen kann.It should be noted at this point that a picking order can also comprise a plurality of charge carriers 58.
[00100] Abschließend sei noch erwähnt, dass die Bereitstellungsplätze 63 in einer horizontalen Ebene nebeneinander und/oder mit gegenseitigem Abstand vertikal übereinander angeordnet sind. Die Beladungsvorrichtung 1 kann auch mehrere Sortiervorrichtungen 6 aufweisen, welche in einer horizontalen Ebene nebeneinander und/oder mit gegenseitigem Abstand vertikal übereinander verfahrbar sind und die sortierten Ladeeinheiten 2 auf die Beschickungsvorrichtung 4 fordert bzw. fördern. Auch kann die Anzahl der Bereitstellungsplätze 63 und Stellplätze 64 beliebig variieren.Finally, it should be mentioned that the staging areas 63 are arranged vertically one above the other in a horizontal plane next to each other and / or at a mutual distance. The loading device 1 may also have a plurality of sorting devices 6, which are vertically movable one above the other in a horizontal plane and / or at a mutual distance and the sorted loading units 2 requests or promote the loading device 4. Also, the number of staging places 63 and 64 pitches can vary.
[00101] Der Ordnung halber sei abschließend darauf hingewiesen, dass zum besseren Verständnis des Aufbaus der Beladungsvorrichtung diese bzw. deren Bestandteile teilweise unmaßstäblich und/oder vergrößert und/oder verkleinert dargestellt wurden. 12/31For the sake of order, it should finally be pointed out that in order to better understand the structure of the loading device, these or their components have been shown partially unevenly and / or enlarged and / or reduced in size. 12.31
AT 13 828 U1 2014-09-15AT 13 828 U1 2014-09-15
BEZUGSZEICHENAUFSTELLUNG 1 Beladungsvorrichtung 44 2 Ladeeinheit 45 Zugmittel 3 Übergabevorrichtung 4 Beschickungsvorrichtung 46 Stellmotor 5 Ausrichtvorrichtung 47 Verstellvorrichtung 48 Zugmittel 6 Sortiervorrichtung 49 Stellmotor 7 Beladungsüberwachungs 50 Übernahme- und Überga vorrichtung bevorrichtung 8 Stellwagen 9 Verstellvorrichtung 51 Stellmotor 10 Linearführung 52 Haltearm 53 Fördermotor 11a, 11b, 11c, Rahmen 54 11 d, 11e 55 Verteilsystem 12 Zugmittel 13 Stellmotor 56 Bereitstellungssystem 14 Fördermotor 57 Beladungszone 15 Bandförderer 58 Ladungsträger 59 Vorratslager 16 Gleitleiste 60 Lagerregal 17 Förderrichtung 18a, 18b Fördervorrichtung 61 Förderumlaufbahn 19a, 19b Antriebsmotor 62 Auslagerbahn 20 Stellwagen 63 Bereitstellungsplatz 64 Stellplatz 21 Verstellvorrichtung 65 Ladestapel 22 Linearführung 23 Zugmittel 66 24 Stellmotor 67 25a, 25b Förderbahn 68 69 26a, 26b Führungsschlitten 70 Beladeposition 27 Verstellvorrichtung 28 Linearführung 71 Stapelreihe 29 Zugmittel 72 Abstand 30 Stellmotor 73 Stapellage 74 Ausfahrrichtung 31 Zugmittel 75 Rückfahrrichtung 32 Stellmotor 33 Verstellvorrichtung 76 Ladeebene 34a, 34b Zugmittel 77 Ladehilfe 35 Verschiebemotor 78 Wechselvorrichtung 36a,36b Koppelungsschlitten 37a, 37b Rahmengestell 38 Fördermittel 39 Verstellvorrichtung 40 Zugmittel 41 Stellmotor 42 Aufnahmevorrichtung 43 Verstellvorrichtung 13/31REFERENCE IDENTIFICATION 1 Loading device 44 2 Loading unit 45 Pulling means 3 Transfer device 4 Feeding device 46 Servo motor 5 Aligning device 47 Adjusting device 48 Pulling means 6 Sorting device 49 Servo motor 7 Load monitoring 50 Transfer and transfer device 8 Drive carriage 9 Adjusting device 51 Servo motor 10 Linear guide 52 Holding arm 53 Feeding motor 11a, 11b, 11c , Frame 54 11 d, 11e 55 Distribution system 12 Traction motor 13 Servomotor 56 Supply system 14 Conveying motor 57 Loading zone 15 Belt conveyor 58 Load carrier 59 Storage 16 Slide rail 60 Storage rack 17 Conveying direction 18a, 18b Conveying device 61 Conveying orbit 19a, 19b Drive motor 62 Outfeed path 20 Positioning carriage 63 Provisioning place 64 Pitch 21 Adjusting device 65 Loading stack 22 Linear guide 23 Pulling means 66 24 Servo motor 67 25a, 25b Feed path 68 69 26a, 26b Guide carriage 70 Beladeposi tion 27 adjusting device 28 linear guide 71 stacking row 29 pulling means 72 distance 30 servomotor 73 stacking position 74 extension direction 31 traction means 75 return direction 32 servomotor 33 adjusting device 76 loading level 34a, 34b traction means 77 loading aid 35 displacement motor 78 changing device 36a, 36b coupling slide 37a, 37b frame frame 38 conveying means 39 adjusting device 40 Traction means 41 servomotor 42 receiving device 43 adjusting device 13/31
Claims (12)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ATGM9012/2010U AT13828U1 (en) | 2009-10-02 | 2010-10-04 | Picking system and method for loading of load carriers |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| AT15592009A AT508843A1 (en) | 2009-10-02 | 2009-10-02 | COMMISSIONING SYSTEM AND METHOD FOR LOADING LOADING CARRIES |
| ATGM9012/2010U AT13828U1 (en) | 2009-10-02 | 2010-10-04 | Picking system and method for loading of load carriers |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AT13828U1 true AT13828U1 (en) | 2014-09-15 |
Family
ID=43602956
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AT15592009A AT508843A1 (en) | 2009-10-02 | 2009-10-02 | COMMISSIONING SYSTEM AND METHOD FOR LOADING LOADING CARRIES |
| ATGM9012/2010U AT13828U1 (en) | 2009-10-02 | 2010-10-04 | Picking system and method for loading of load carriers |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| AT15592009A AT508843A1 (en) | 2009-10-02 | 2009-10-02 | COMMISSIONING SYSTEM AND METHOD FOR LOADING LOADING CARRIES |
Country Status (3)
| Country | Link |
|---|---|
| AT (2) | AT508843A1 (en) |
| DE (1) | DE212010000161U1 (en) |
| WO (1) | WO2011038442A2 (en) |
Families Citing this family (44)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102011017111A1 (en) * | 2011-04-14 | 2012-10-18 | Recop Electronic Gmbh | Palletising system for beverage crates comprising at least one feed track |
| CN102862809B (en) * | 2012-10-19 | 2014-09-03 | 浙江省烟草公司绍兴市公司 | Stocking-up system and method |
| ITUB20152521A1 (en) * | 2015-07-27 | 2017-01-27 | Swisslog Italia Spa | Automatic system and internal logistics management procedure for the handling of products in stackable containers |
| CA2998544C (en) | 2015-09-11 | 2023-05-09 | Berkshire Grey, Inc. | Robotic systems and methods for identifying and processing a variety of objects |
| US10730078B2 (en) | 2015-12-04 | 2020-08-04 | Berkshire Grey, Inc. | Systems and methods for dynamic sortation of objects |
| ES2847757T3 (en) | 2015-12-04 | 2021-08-03 | Berkshire Grey Inc | Systems and methods for dynamic object processing |
| US9937532B2 (en) | 2015-12-18 | 2018-04-10 | Berkshire Grey Inc. | Perception systems and methods for identifying and processing a variety of objects |
| US12350713B2 (en) | 2015-12-18 | 2025-07-08 | Berkshire Grey Operating Company, Inc. | Perception systems and methods for identifying and processing a variety of objects |
| ES2941985T3 (en) | 2016-11-08 | 2023-05-29 | Berkshire Grey Operating Company Inc | Systems and methods for processing objects |
| ES2964823T3 (en) | 2016-11-28 | 2024-04-09 | Berkshire Grey Operating Company Inc | Object singulation system for processing |
| EP3551553A1 (en) | 2016-12-06 | 2019-10-16 | Berkshire Grey Inc. | Systems and methods for providing for the processing of objects in vehicles |
| CA3139272C (en) | 2016-12-09 | 2023-07-25 | Berkshire Grey, Inc. | Systems and methods for processing objects provided in vehicles |
| CN110494378B (en) | 2017-03-17 | 2021-06-11 | 伯克希尔格雷股份有限公司 | System and method for processing objects including a linear gantry system |
| CN114852726B (en) | 2017-03-20 | 2024-01-02 | 伯克希尔格雷营业股份有限公司 | System and method for handling objects including transport vehicles |
| CN114873119B (en) | 2017-03-20 | 2023-10-31 | 伯克希尔格雷营业股份有限公司 | Systems and methods for handling objects including moving matrix carrier systems |
| WO2018175294A1 (en) | 2017-03-20 | 2018-09-27 | Berkshire Grey, Inc. | Systems and methods for processing objects including an auto-shuttle system |
| CN110446671B (en) | 2017-03-20 | 2021-09-03 | 伯克希尔格雷股份有限公司 | System and method for processing objects including a linear gantry system |
| CA3057313C (en) | 2017-03-23 | 2022-11-29 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated mobile matrix carriers |
| CN110662707B (en) | 2017-03-23 | 2021-12-14 | 伯克希尔格雷股份有限公司 | System and method for processing objects including automatically moving matrix boxes |
| CA3057323C (en) | 2017-03-23 | 2022-10-04 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated linear processing stations |
| CN115339805A (en) | 2017-03-24 | 2022-11-15 | 伯克希尔格雷营业股份有限公司 | System and method for processing objects including automated processing |
| US11205059B2 (en) | 2017-04-18 | 2021-12-21 | Berkshire Grey, Inc. | Systems and methods for separating objects using conveyor transfer with one or more object processing systems |
| CN113955367B (en) | 2017-04-18 | 2023-09-12 | 伯克希尔格雷营业股份有限公司 | Systems and methods for processing objects including space-efficient distribution stations and automated output processing |
| US11200390B2 (en) | 2017-04-18 | 2021-12-14 | Berkshire Grey, Inc. | Systems and methods for separating objects using drop conveyors with one or more object processing systems |
| US11301654B2 (en) | 2017-04-18 | 2022-04-12 | Berkshire Grey Operating Company, Inc. | Systems and methods for limiting induction of objects to one or more object processing systems |
| US11416695B2 (en) | 2017-04-18 | 2022-08-16 | Berkshire Grey Operating Company, Inc. | Systems and methods for distributing induction of objects to a plurality of object processing systems |
| US11080496B2 (en) | 2017-04-18 | 2021-08-03 | Berkshire Grey, Inc. | Systems and methods for separating objects using vacuum diverts with one or more object processing systems |
| US11055504B2 (en) | 2017-04-18 | 2021-07-06 | Berkshire Grey, Inc. | Systems and methods for separating objects using a vacuum roller with one or more object processing systems |
| US10792706B2 (en) | 2017-04-24 | 2020-10-06 | Berkshire Grey, Inc. | Systems and methods for providing singulation of objects for processing using object movement redistribution |
| CA3080514C (en) | 2017-10-27 | 2024-01-02 | Berkshire Grey, Inc. | Bin infeed and removal systems and methods for processing objects including mobile matrix carrier systems |
| US10843333B2 (en) | 2018-03-05 | 2020-11-24 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated re-circulating processing stations |
| CN108438862B (en) * | 2018-03-26 | 2024-03-19 | 贵州慧联科技有限公司 | Multi-channel horizontal sorting bin smoke filling system and use method |
| US10583986B2 (en) | 2018-05-04 | 2020-03-10 | Berkshire Grey, Inc. | Systems and methods for processing objects, including automated processing stations |
| EP3871168B1 (en) | 2018-10-23 | 2025-04-16 | Berkshire Grey Operating Company, Inc. | Systems and methods for dynamic processing of objects with data verification |
| WO2020086995A1 (en) | 2018-10-25 | 2020-04-30 | Berkshire Grey, Inc. | Systems and methods for learning to extrapolate optimal object routing and handling parameters |
| CN109772715A (en) * | 2019-03-07 | 2019-05-21 | 赖辉 | A kind of method for sorting, stacking machine and sorting system |
| CN111822367B (en) * | 2019-04-17 | 2025-04-04 | 原力聚合(重庆)机器人科技有限公司 | Cargo handling systems and sorting container mobile equipment |
| CN211687083U (en) * | 2019-05-24 | 2020-10-16 | 深圳市海铭德科技有限公司 | Three-rail conveying and detecting device |
| US11866224B2 (en) | 2019-06-24 | 2024-01-09 | Berkshire Grey Operating Company, Inc. | Systems and methods for providing shipping of orders in an order fulfillment center |
| CN111760808B (en) * | 2019-06-28 | 2022-02-01 | 北京京东乾石科技有限公司 | Sorting device and sorting method |
| CA3234674A1 (en) | 2021-10-06 | 2023-04-13 | Berkshire Grey Operating Company, Inc. | Dynamic processing of objects provided in elevated vehicles with evacuation systems and methods for receiving objects |
| TWI838909B (en) * | 2021-10-12 | 2024-04-11 | 美商靈巧公司 | Modular stack mover system, kitting system, method for controlling a robotic modular pusher system, and computer program product embodied in a non-transitory computer readable medium |
| US12441553B2 (en) | 2022-03-23 | 2025-10-14 | Berkshire Grey Operating Company, Inc. | Buffering systems and methods for dynamic processing of objects |
| CN115057218B (en) * | 2022-06-22 | 2025-02-07 | 广东汇兴精工智造股份有限公司 | Battery binning machine |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5538391A (en) * | 1991-11-21 | 1996-07-23 | United Parcel Service Of America, Inc. | Method and apparatus for mechanized loading and unloading |
| US6431346B1 (en) * | 1996-04-24 | 2002-08-13 | Rapistan Systems Advertising Corp. | Extendable trailer loader/unloader with user interface section |
| DE102005061309A1 (en) * | 2005-12-21 | 2007-07-05 | Siemens Ag | Sorting device for sorting of articles, has several buffer channels, in which several articles can be arranged, and in and out movable vessel is provided at inlet end or outlet end of buffer channels along the end |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE9321626U1 (en) * | 1993-11-13 | 2001-06-21 | Ahbel, Thomas A., 82544 Egling | Device for stacking piece goods |
| DE10313576B4 (en) | 2003-03-26 | 2006-01-05 | Witron Logistik & Informatik Gmbh | Carrier loader |
| DE202004008679U1 (en) * | 2004-06-02 | 2004-09-02 | Witron Logistik + Informatik Gmbh | Storage system comprises two storage levels fitted with shelves, order assembly area containing several levels with work stations and sequencing and buffer area separating two |
| NO322426B1 (en) | 2004-12-15 | 2006-10-02 | Optimar Giske As | palletizing |
| AT504128B1 (en) * | 2006-10-02 | 2008-03-15 | Tgw Transportgeraete Gmbh | DEVICE AND METHOD FOR REMOVING LOADED PRODUCTS |
| DE102007010191A1 (en) * | 2007-03-02 | 2008-09-04 | Dematic Gmbh & Co. Kg | Method and system for providing transport units from a warehouse in a desired predetermined order on at least one collection line |
| DE102007017035B4 (en) * | 2007-04-11 | 2017-10-19 | Alpma Alpenland Maschinenbau Gmbh | Device for conveying isolated goods |
| DE102007023909A1 (en) * | 2007-05-23 | 2008-11-27 | Siemens Ag | Air baggage loading system and method for manual or machine assisted sorting |
| AT506443A1 (en) * | 2008-01-28 | 2009-09-15 | Tgw Mechanics Gmbh | Picking system for manual or automated loading of loading equipment e.g. order pallet, has positioning conveying device with paths adjusted to distance determined from conveying property of loading unit and/or from gap width of stack gap |
-
2009
- 2009-10-02 AT AT15592009A patent/AT508843A1/en not_active Application Discontinuation
-
2010
- 2010-10-04 DE DE212010000161U patent/DE212010000161U1/en not_active Expired - Lifetime
- 2010-10-04 AT ATGM9012/2010U patent/AT13828U1/en not_active IP Right Cessation
- 2010-10-04 WO PCT/AT2010/000368 patent/WO2011038442A2/en not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5538391A (en) * | 1991-11-21 | 1996-07-23 | United Parcel Service Of America, Inc. | Method and apparatus for mechanized loading and unloading |
| US6431346B1 (en) * | 1996-04-24 | 2002-08-13 | Rapistan Systems Advertising Corp. | Extendable trailer loader/unloader with user interface section |
| DE102005061309A1 (en) * | 2005-12-21 | 2007-07-05 | Siemens Ag | Sorting device for sorting of articles, has several buffer channels, in which several articles can be arranged, and in and out movable vessel is provided at inlet end or outlet end of buffer channels along the end |
Also Published As
| Publication number | Publication date |
|---|---|
| DE212010000161U1 (en) | 2012-07-06 |
| WO2011038442A3 (en) | 2011-06-03 |
| AT508843A1 (en) | 2011-04-15 |
| WO2011038442A2 (en) | 2011-04-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AT13828U1 (en) | Picking system and method for loading of load carriers | |
| EP2753559B1 (en) | Order picking station, and method for the order picking of articles from loading aids | |
| AT516875B1 (en) | Method for storing piece goods in a storage rack and storage system | |
| AT391671B (en) | METHOD AND DEVICE FOR AUTOMATIC STACKING, STORAGE AND REMOVAL OF ITEMS | |
| EP3036164B1 (en) | Storage device for stackable containers | |
| EP0396960B1 (en) | Method and installation for rearranging objects palletized in classes in to groups of definite sorting composition | |
| EP2456696B1 (en) | Method for loading a load carrier with loading units | |
| EP2753558B1 (en) | Order-picking station and method for order-picking of articles from a loading aid | |
| AT501897B1 (en) | METHOD AND DEVICE FOR AUTOMATIC FEEDING OF A GOODS OUTPUT DEVICE | |
| DE2824304A1 (en) | METHOD FOR FEEDING FOLDING BOXES FROM A PRODUCTION DEVICE FOR THE FOLDING BOXES TO A DEVICE FOR FURTHER PROCESSING OF THE FOLDING BOXES AND PRODUCTION LINE FOR FOLDING BOXES | |
| DE19501637C2 (en) | Palletizer | |
| AT507811B1 (en) | STORAGE SYSTEM AND METHOD FOR AUTOMATED DISTRIBUTION OF PACKAGES | |
| DE3614013A1 (en) | TRANSPORT AND SORTING DEVICE FOR A COMPUTER-CONTROLLED ANGLE SHEAR | |
| EP2243731B1 (en) | Device for palletizing articles layer by layer | |
| EP3766812A1 (en) | Depalletizer with device for the transfer and partitioning of depalletized load | |
| EP1440923B1 (en) | Arrangement and method for selective stacking signatures having different sizes and/or forms | |
| DE10006482C2 (en) | stacker | |
| DE60001711T2 (en) | Automatic distribution system for items for picking one or more orders | |
| EP1275600A1 (en) | Apparatus for feeding articles to a processing unit, particulary to a printing machine | |
| EP0945376B1 (en) | Method and apparatus for transferring objects in cavities of an accumulator. | |
| DE202010015943U1 (en) | Device for temporarily storing unpainted cans | |
| DE102010032604A1 (en) | Apparatus and method for temporarily storing unpainted cans |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MK07 | Expiry |
Effective date: 20201031 |