AR109009A1 - Modelo en tiempo real para decisión de colocación de desviador usando das y análisis de disminución gradual - Google Patents
Modelo en tiempo real para decisión de colocación de desviador usando das y análisis de disminución gradualInfo
- Publication number
- AR109009A1 AR109009A1 ARP170101908A ARP170101908A AR109009A1 AR 109009 A1 AR109009 A1 AR 109009A1 AR P170101908 A ARP170101908 A AR P170101908A AR P170101908 A ARP170101908 A AR P170101908A AR 109009 A1 AR109009 A1 AR 109009A1
- Authority
- AR
- Argentina
- Prior art keywords
- well
- gradual decrease
- processor
- flow distribution
- days
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/107—Locating fluid leaks, intrusions or movements using acoustic means
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/138—Plastering the borehole wall; Injecting into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
- E21B47/07—Temperature
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/006—Measuring wall stresses in the borehole
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Acoustics & Sound (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Geophysics And Detection Of Objects (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
Abstract
Un sistema incluye al menos un procesador, y una memoria acoplada a al menos un procesador con instrucciones almacenadas en esta. Cuando son ejecutadas por al menos un procesador, las instrucciones hacen que al menos un procesador lleve a cabo funciones que incluyen funciones para: aplicar un tratamiento en un primer pozo en la formación subterránea, donde el tratamiento tiene el objetivo de estimular la producción; realizar un análisis de disminución gradual del primer pozo en cada una de las múltiples etapas del primer pozo; determinar una distribución de flujo en el fondo del pozo en cada una de las múltiples etapas; desarrollar un modelo para correlacionar la distribución de flujo en el fondo del pozo y el análisis de disminución gradual en cada una de las múltiples etapas; usar el modelo desarrollado para calcular una distribución de flujo en el fondo del pozo en una etapa de un segundo pozo; y determinar si evitar una colocación del material desviador en la etapa del segundo pozo en función de la distribución de flujo en el fondo del pozo calculada.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/US2016/060862 WO2018084871A1 (en) | 2016-11-07 | 2016-11-07 | Real-time model for diverter drop decision using das and step down analysis |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AR109009A1 true AR109009A1 (es) | 2018-10-17 |
Family
ID=62076330
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ARP170101908A AR109009A1 (es) | 2016-11-07 | 2017-07-10 | Modelo en tiempo real para decisión de colocación de desviador usando das y análisis de disminución gradual |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US20190249542A1 (es) |
| AR (1) | AR109009A1 (es) |
| WO (1) | WO2018084871A1 (es) |
Families Citing this family (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2579929B (en) * | 2017-09-28 | 2022-03-02 | Landmark Graphics Corp | Multi-stage placement of material in a wellbore |
| CA3074009C (en) * | 2017-12-13 | 2022-05-24 | Halliburton Energy Services, Inc. | Real-time perforation plug deployment and stimulation in a subsurface formation |
| CA3074010C (en) | 2017-12-13 | 2022-05-24 | Halliburton Energy Services, Inc. | Real-time perforation plug deployment and stimulation in a subsurface formation |
| US11143005B2 (en) * | 2019-07-29 | 2021-10-12 | Halliburton Energy Services, Inc. | Electric pump flow rate modulation for fracture monitoring and control |
| US11556612B2 (en) * | 2019-09-09 | 2023-01-17 | Halliburton Energy Services, Inc. | Predicting material distribution in a hydraulic fracturing treatment stage |
| US11449645B2 (en) * | 2019-09-09 | 2022-09-20 | Halliburton Energy Services, Inc. | Calibrating a diversion model for a hydraulic fracturing well system |
| US11373058B2 (en) * | 2019-09-17 | 2022-06-28 | Halliburton Energy Services Inc. | System and method for treatment optimization |
| US11326936B2 (en) | 2020-03-02 | 2022-05-10 | Halliburton Energy Services, Inc. | Topside distributed acoustic sensing interrogation of subsea wells with a single optical waveguide |
| US11066915B1 (en) | 2020-06-09 | 2021-07-20 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
| US11028677B1 (en) | 2020-06-22 | 2021-06-08 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
| US11933153B2 (en) | 2020-06-22 | 2024-03-19 | Bj Energy Solutions, Llc | Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control |
| US11939853B2 (en) | 2020-06-22 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units |
| US11473413B2 (en) | 2020-06-23 | 2022-10-18 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
| US11466680B2 (en) | 2020-06-23 | 2022-10-11 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
| US11220895B1 (en) | 2020-06-24 | 2022-01-11 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
| US11149533B1 (en) | 2020-06-24 | 2021-10-19 | Bj Energy Solutions, Llc | Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
| US12523143B2 (en) | 2024-05-30 | 2026-01-13 | Halliburton Energy Services, Inc. | Addressing plug movement in hydraulic fracturing |
| US12486747B1 (en) | 2024-05-30 | 2025-12-02 | Halliburton Energy Services, Inc. | Well plug integrity |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6367548B1 (en) * | 1999-03-05 | 2002-04-09 | Bj Services Company | Diversion treatment method |
| US7451812B2 (en) * | 2006-12-20 | 2008-11-18 | Schlumberger Technology Corporation | Real-time automated heterogeneous proppant placement |
| US10655442B2 (en) * | 2012-12-28 | 2020-05-19 | Schlumberger Technology Corporation | Method for wellbore stimulation optimization |
| US10386215B2 (en) * | 2013-08-23 | 2019-08-20 | Baker Hughes, A Ge Company, Llc | Method for monitoring a flow using distributed acoustic sensing |
| US9702247B2 (en) * | 2013-09-17 | 2017-07-11 | Halliburton Energy Services, Inc. | Controlling an injection treatment of a subterranean region based on stride test data |
| US10590747B2 (en) * | 2015-09-21 | 2020-03-17 | Halliburton Energy Services, Inc. | Real-time control of diverters |
-
2016
- 2016-11-07 US US16/340,448 patent/US20190249542A1/en not_active Abandoned
- 2016-11-07 WO PCT/US2016/060862 patent/WO2018084871A1/en not_active Ceased
-
2017
- 2017-07-10 AR ARP170101908A patent/AR109009A1/es active IP Right Grant
Also Published As
| Publication number | Publication date |
|---|---|
| WO2018084871A1 (en) | 2018-05-11 |
| US20190249542A1 (en) | 2019-08-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AR109009A1 (es) | Modelo en tiempo real para decisión de colocación de desviador usando das y análisis de disminución gradual | |
| AR104404A1 (es) | Control de flujo en pozos subterráneos | |
| AR109008A1 (es) | Decisión de estimulación permanente del pozo en tiempo real | |
| AR102370A1 (es) | Sistema y método para tratar una formación subterránea | |
| AR088572A1 (es) | Metodos y sistemas de modelado de flujo de hidrocarburos de querogenos en una formacion que contiene hidrocarburos | |
| CL2019000762A1 (es) | Sistemas y métodos para programar un receptáculo de crecimiento. | |
| MX2016009295A (es) | Cromatografia esteril y procesos de fabricacion. | |
| AR102798A1 (es) | Tratamiento de pozos | |
| AR103387A1 (es) | Dispositivo de fluido que emula una fractura en una formación y se utiliza para analizar el flujo de un fluido de tratamiento en el dispositivo | |
| AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión | |
| AR113592A1 (es) | Composición de fluido divergente en estimulación de pozo | |
| CR20160507A (es) | Valvula de descarga de inodoro de varias etapas | |
| AR095105A1 (es) | Métodos para producir lechadas de cemento resistentes a la migración de fluidos | |
| GB2545583A (en) | Stage tool | |
| PE20190516A1 (es) | Sistema control de mantenimiento de desgaste de hidrociclon | |
| AR101540A1 (es) | Regulación de caudal a través de una sarta de herramientas de pozo | |
| AR087856A1 (es) | Metodos y equipamiento para mejorar la confiabilidad de las operaciones de estimulacion en puntos localizados | |
| AR103819A1 (es) | Aparato, sistemas y métodos para la presión de abatimiento | |
| MX2016014601A (es) | Sistemas y metodos de hidratacion. | |
| MX2017012472A (es) | Ensamblaje de terminacion inteligente a base de tuberia de revestimiento alimentado de forma remota. | |
| CL2019000287A1 (es) | Fluidos y métodos | |
| AR102667A1 (es) | Tratamiento de pozos | |
| CL2018001763A1 (es) | Sistema de riego. | |
| MX2017004840A (es) | Adaptacion de un cabezal de cementacion de mando superior a una herramienta de servicio de la tuberia de revestimiento. | |
| CO2018001650A2 (es) | Sistema y método de extracción de recursos |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant, registration |