AR104575A1 - Método de monitorización y optimización en tiempo real de alcance extendido para operaciones con tubería en espiral - Google Patents
Método de monitorización y optimización en tiempo real de alcance extendido para operaciones con tubería en espiralInfo
- Publication number
- AR104575A1 AR104575A1 ARP160101334A ARP160101334A AR104575A1 AR 104575 A1 AR104575 A1 AR 104575A1 AR P160101334 A ARP160101334 A AR P160101334A AR P160101334 A ARP160101334 A AR P160101334A AR 104575 A1 AR104575 A1 AR 104575A1
- Authority
- AR
- Argentina
- Prior art keywords
- spiral pipe
- real time
- sensors
- bottom assembly
- pipe string
- Prior art date
Links
- 238000012544 monitoring process Methods 0.000 title abstract 4
- 238000000034 method Methods 0.000 title abstract 3
- 238000005457 optimization Methods 0.000 title 1
- 238000002347 injection Methods 0.000 abstract 3
- 239000007924 injection Substances 0.000 abstract 3
- 239000000314 lubricant Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/20—Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
- E21B17/206—Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables with conductors, e.g. electrical, optical
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
- E21B23/14—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells for displacing a cable or a cable-operated tool, e.g. for logging or perforating operations in deviated wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/024—Determining slope or direction of devices in the borehole
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Un método de monitorización de una operación de tubería en espiral incluye situar un ensamblaje de fondo (BHA, por sus siglas en inglés) conectado a una sarta de tubería en espiral dentro de un pozo horizontal. El método incluye monitorizar una pluralidad de sensores conectados al ensamblaje de fondo a través de una línea de comunicación colocada dentro de la sarta de tubería en espiral y determinar una velocidad de inyección óptima de la sarta de tubería en espiral mediante la monitorización de los sensores en tiempo real. La velocidad de inyección de la tubería en espiral puede cambiarse basándose en la determinación en tiempo real de la velocidad de inyección óptima. Los sensores pueden ser monitorizados en tiempo real para determinar una cantidad óptima de lubricante que se inyecta en un pozo o si la sarta de tubería en espiral está formando una hélice. El ensamblaje de fondo puede incluir un tractor o una herramienta vibratoria para ayudar en el movimiento del ensamblaje de fondo a lo largo de un pozo horizontal. La línea de comunicación puede ser usada para alimentar los sensores, el tractor y la herramienta vibratoria.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/877,149 US10174600B2 (en) | 2014-09-05 | 2015-10-07 | Real-time extended-reach monitoring and optimization method for coiled tubing operations |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AR104575A1 true AR104575A1 (es) | 2017-08-02 |
Family
ID=58488372
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ARP160101334A AR104575A1 (es) | 2015-10-07 | 2016-05-09 | Método de monitorización y optimización en tiempo real de alcance extendido para operaciones con tubería en espiral |
Country Status (3)
| Country | Link |
|---|---|
| AR (1) | AR104575A1 (es) |
| SA (1) | SA518391244B1 (es) |
| WO (1) | WO2017062329A1 (es) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20190195049A1 (en) * | 2017-12-22 | 2019-06-27 | Baker Hughes, A Ge Company, Llc | System and method for guiding a tubular along a borehole |
| US11808097B2 (en) | 2019-05-20 | 2023-11-07 | Schlumberger Technology Corporation | Flow rate pressure control during mill-out operations |
| US12000261B2 (en) | 2019-05-20 | 2024-06-04 | Schlumberger Technology Corporation | System and methodology for determining appropriate rate of penetration in downhole applications |
| US11619124B2 (en) | 2019-12-20 | 2023-04-04 | Schlumberger Technology Corporation | System and methodology to identify milling events and performance using torque-thrust curves |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7617873B2 (en) * | 2004-05-28 | 2009-11-17 | Schlumberger Technology Corporation | System and methods using fiber optics in coiled tubing |
| GB2469403B (en) * | 2008-01-02 | 2012-10-17 | Pine Tree Gas Llc | Slim-hole parasite string |
| CN104285029B (zh) * | 2012-03-21 | 2017-05-10 | 沙特阿拉伯石油公司 | 用于移动连续管柱的井下方法和可膨胀箍 |
| US9222316B2 (en) * | 2012-12-20 | 2015-12-29 | Schlumberger Technology Corporation | Extended reach well system |
| US10041313B2 (en) * | 2013-12-11 | 2018-08-07 | Schlumberger Technology Corporation | Method and system for extending reach in deviated wellbores using selected injection speed |
-
2016
- 2016-05-09 AR ARP160101334A patent/AR104575A1/es unknown
- 2016-10-04 WO PCT/US2016/055259 patent/WO2017062329A1/en not_active Ceased
-
2018
- 2018-03-31 SA SA518391244A patent/SA518391244B1/ar unknown
Also Published As
| Publication number | Publication date |
|---|---|
| WO2017062329A1 (en) | 2017-04-13 |
| SA518391244B1 (ar) | 2023-01-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CL2020000674A1 (es) | Unidad de cabezal de barril de núcleo con una herramienta de orientación de muestra integrada y sistema para su uso (divisional solicitud 201602684) | |
| CO6650386A2 (es) | Monitoreo de objetos en conjunción con un pozo subterraneo | |
| CO2017006512A2 (es) | Sistemas y métodos de funcionamiento de sensores y herramientas de tubería flexible accionados por electricidad | |
| AR098175A1 (es) | Predicción de riesgos en tiempo real durante operaciones de perforación | |
| CL2016000996A1 (es) | Método de monitoreo de un taladro de minería y sistema monitor de máquina minera. | |
| CO2019007455A2 (es) | Dispositivo de activación remota de fondo de pozo para herramientas de servicio configuradas para monoperforaciones y grandes perforaciones de vlh con lógica de programación | |
| SA516371696B1 (ar) | طريقة لتفسير بيانات مستشعرات درجة الحرارة الموزعة خلال عمليات حفرة البئر | |
| AR103089A1 (es) | Generación de modelos para predicción de tasa de penetración en tiempo real | |
| MX2017007454A (es) | Metodos y sistemas para modelar un ensamblaje de fondo de pozo tridimensional avanzado. | |
| AR097876A1 (es) | Predicción de riesgos en tiempo real durante las operaciones de perforación | |
| AR102682A1 (es) | Sistemas y métodos para optimizar operaciones de fracturación en una formación | |
| AR057892A1 (es) | Metodo para perforar y obtener hidrocarburos de formaciones subterraneas | |
| AR100325A1 (es) | Control de tubería elástica con perforación de presión controlada | |
| AR094925A1 (es) | Aditivos para el control de pérdida de fluido limpio | |
| AR102540A1 (es) | Métodos para manejar el reemplazo de vacío de formación en operaciones de producción de inyección de agua para aumentar la recuperación de petróleo | |
| GB2547592A (en) | Statistical approach to incorporate uncertainties of parameters in simulation results and stability analysis for earth drilling | |
| AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión | |
| AR100596A1 (es) | Formación de pozos multilaterales | |
| AR104575A1 (es) | Método de monitorización y optimización en tiempo real de alcance extendido para operaciones con tubería en espiral | |
| GB2545860A (en) | Real-time control of drilling fluid properties using predictive models | |
| AR103524A1 (es) | Visualización de desempeño de limpieza de pozo | |
| MX2015014153A (es) | Control y transmision de datos del pozo de sondeo a la superficie. | |
| NO20150744A1 (en) | A method of plugging and abandoning a well | |
| AR104525A1 (es) | Estimación del desgaste de la tubería de revestimiento durante la perforación usando múltiples factores de desgaste a lo largo de la sarta de perforación | |
| CL2019000333A1 (es) | Sistema de control de mantenimiento de desgaste de hidrociclón. |