AR092189A1 - Prueba de inyeccion de fractura natural - Google Patents
Prueba de inyeccion de fractura naturalInfo
- Publication number
- AR092189A1 AR092189A1 ARP130102959A ARP130102959A AR092189A1 AR 092189 A1 AR092189 A1 AR 092189A1 AR P130102959 A ARP130102959 A AR P130102959A AR P130102959 A ARP130102959 A AR P130102959A AR 092189 A1 AR092189 A1 AR 092189A1
- Authority
- AR
- Argentina
- Prior art keywords
- pressure
- information
- time interval
- formation
- injection
- Prior art date
Links
- 238000002347 injection Methods 0.000 title abstract 5
- 239000007924 injection Substances 0.000 title abstract 5
- 230000015572 biosynthetic process Effects 0.000 abstract 4
- 239000012530 fluid Substances 0.000 abstract 4
- 238000005259 measurement Methods 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Measuring Fluid Pressure (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Control Of Positive-Displacement Pumps (AREA)
- Examining Or Testing Airtightness (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Un método para la estimación de una propiedad de una formación terrestre penetrada por un pozo incluye: la realización de una prueba de integridad del pozo, a una presión inferior a una presión de gradiente de fractura de la formación, de manera de proporcionar información de pérdida de derrame; la inyección de un fluido en la formación, a una primera presión mayor que la presión de gradiente de fractura, durante un primer intervalo de tiempo de inyección usando un inyector de fluido; la medición de la presión frente al tiempo, usando un sensor de presión y un cronómetro durante un primer intervalo de tiempo de prueba a fin de proporcionar primera información de presión; la inyección de un fluido en la formación, con un segundo caudal mayor que el primer caudal durante un segundo intervalo de tiempo de inyección usando el inyector de fluido; la medición de la presión frente al tiempo, usando el sensor de presión y el cronómetro durante un segundo intervalo de tiempo de prueba a fin de proporcionar segunda información de presión: y la estimación de la propiedad usando la primera información de presión, la segunda información de presión y la información de pérdida de derrame.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/591,745 US9366122B2 (en) | 2012-08-22 | 2012-08-22 | Natural fracture injection test |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| AR092189A1 true AR092189A1 (es) | 2015-04-08 |
Family
ID=49036430
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| ARP130102959A AR092189A1 (es) | 2012-08-22 | 2013-08-21 | Prueba de inyeccion de fractura natural |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US9366122B2 (es) |
| EP (1) | EP2700785B1 (es) |
| CN (1) | CN103628865B (es) |
| AR (1) | AR092189A1 (es) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9611737B2 (en) * | 2013-09-17 | 2017-04-04 | Husky Oil Operations Limited | Method for determining regions for stimulation along a wellbore within a hydrocarbon formation, and using such method to improve hydrocarbon recovery from the reservoir |
| WO2016099470A1 (en) * | 2014-12-17 | 2016-06-23 | Halliburton Energy Services Inc. | Optimizing matrix acidizing treatment |
| GB2539056A (en) * | 2015-06-03 | 2016-12-07 | Geomec Eng Ltd | Improvements in or relating to injection wells |
| GB2539001B (en) * | 2015-06-03 | 2021-04-21 | Geomec Eng Ltd | Improvements in or relating to hydrocarbon production from shale |
| CN105545271A (zh) * | 2015-12-22 | 2016-05-04 | 中国石油化工股份有限公司 | 一种低渗透凝析气藏压裂液返排控制方法 |
| GB2591207B (en) | 2016-01-18 | 2021-10-20 | Equinor Energy As | Method and apparatus for automated pressure integrity testing (APIT) |
| US10415382B2 (en) * | 2016-05-03 | 2019-09-17 | Schlumberger Technology Corporation | Method and system for establishing well performance during plug mill-out or cleanout/workover operations |
| EP3481913A4 (en) * | 2016-07-07 | 2020-01-08 | Integrity Bio-Chemicals, LLC | CROSSLINKED LEVANE MIXTURES USED AS LOSS OF TRAFFIC MATERIALS |
| US11187074B2 (en) | 2017-01-13 | 2021-11-30 | Halliburton Energy Services, Inc. | Determining wellbore parameters through analysis of the multistage treatments |
| RU173763U1 (ru) * | 2017-04-04 | 2017-09-11 | Федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский государственный нефтяной технический университет" | Установка для моделирования газопроявлений в скважине в период ожидания затвердевания цемента |
| CN108956052B (zh) * | 2018-05-04 | 2020-01-03 | 中国石油化工股份有限公司 | 一种橡胶密封圈耐二氧化碳性能试验方法 |
| US11098561B2 (en) | 2019-06-21 | 2021-08-24 | Halliburton Energy Services, Inc. | Evaluating hydraulic fracturing breakdown effectiveness |
| CN109372498B (zh) * | 2018-09-29 | 2021-09-21 | 中国石油大学(北京) | 确定岩层中破碎带的方法及装置 |
| WO2020117248A1 (en) | 2018-12-06 | 2020-06-11 | Halliburton Energy Services, Inc. | Interpretation of pumping pressure behavior and diagnostic for well perforation efficiency during pumping operations |
| US11268365B2 (en) | 2019-05-17 | 2022-03-08 | Halliburton Energy Services, Inc. | Estimating active fractures during hydraulic fracturing operations |
| US20250122789A1 (en) * | 2023-10-17 | 2025-04-17 | Saudi Arabian Oil Company | Stimulating Hydrocarbon Production in a Subsurface Reservoir |
Family Cites Families (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3636762A (en) | 1970-05-21 | 1972-01-25 | Shell Oil Co | Reservoir test |
| US4192182A (en) * | 1978-11-16 | 1980-03-11 | Sylvester G Clay | Method for performing step rate tests on injection wells |
| US4378845A (en) * | 1980-12-30 | 1983-04-05 | Mobil Oil Corporation | Sand control method employing special hydraulic fracturing technique |
| CA1202882A (en) * | 1982-03-01 | 1986-04-08 | Owen Richmond | Method of removing gas from an underground seam |
| CN1019520B (zh) * | 1985-09-25 | 1992-12-16 | 施卢默格海外有限公司 | 估计一个储油层中至少两层地层的渗透性及表层系数的方法 |
| US4793413A (en) * | 1987-12-21 | 1988-12-27 | Amoco Corporation | Method for determining formation parting pressure |
| US5163321A (en) * | 1989-10-17 | 1992-11-17 | Baroid Technology, Inc. | Borehole pressure and temperature measurement system |
| US6378363B1 (en) * | 1999-03-04 | 2002-04-30 | Schlumberger Technology Corporation | Method for obtaining leak-off test and formation integrity test profiles from limited downhole pressure measurements |
| NO313923B1 (no) * | 2001-04-03 | 2002-12-23 | Silver Eagle As | FremgangsmÕte for Õ hindre et fluid i Õ strömme i eller omkring et brönnrör ved hjelp av lösmasse |
| US6705398B2 (en) * | 2001-08-03 | 2004-03-16 | Schlumberger Technology Corporation | Fracture closure pressure determination |
| US7054751B2 (en) | 2004-03-29 | 2006-05-30 | Halliburton Energy Services, Inc. | Methods and apparatus for estimating physical parameters of reservoirs using pressure transient fracture injection/falloff test analysis |
| ITMI20060995A1 (it) * | 2006-05-19 | 2007-11-20 | Eni Spa | Procedimento per testare pozzi di idrocarburi a zero emissioni |
| US8056630B2 (en) * | 2007-03-21 | 2011-11-15 | Baker Hughes Incorporated | Methods of using viscoelastic surfactant gelled fluids to pre-saturate underground formations |
| US20090204328A1 (en) * | 2008-02-12 | 2009-08-13 | Precision Energey Services, Inc. | Refined analytical model for formation parameter calculation |
| US8087292B2 (en) * | 2008-04-30 | 2012-01-03 | Chevron U.S.A. Inc. | Method of miscible injection testing of oil wells and system thereof |
| CA2750374A1 (en) * | 2009-01-13 | 2010-07-22 | Schlumberger Canada Limited | In-situ stress measurements in hydrocarbon bearing shales |
| US9790788B2 (en) * | 2009-05-05 | 2017-10-17 | Baker Hughes Incorporated | Apparatus and method for predicting properties of earth formations |
-
2012
- 2012-08-22 US US13/591,745 patent/US9366122B2/en active Active
-
2013
- 2013-08-21 EP EP13181146.5A patent/EP2700785B1/en active Active
- 2013-08-21 AR ARP130102959A patent/AR092189A1/es active IP Right Grant
- 2013-08-22 CN CN201310463542.8A patent/CN103628865B/zh active Active
Also Published As
| Publication number | Publication date |
|---|---|
| US20140058686A1 (en) | 2014-02-27 |
| US9366122B2 (en) | 2016-06-14 |
| CN103628865A (zh) | 2014-03-12 |
| EP2700785A3 (en) | 2017-08-16 |
| EP2700785A2 (en) | 2014-02-26 |
| EP2700785B1 (en) | 2023-10-04 |
| CN103628865B (zh) | 2017-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AR092189A1 (es) | Prueba de inyeccion de fractura natural | |
| AR098709A1 (es) | Válvula de retención | |
| EA201200864A1 (ru) | Способ измерения смачиваемости горных пород | |
| AR072304A1 (es) | Metodos para estimar la permeabilidad de la formacion utilizando las mediciones de intervalos de tiempo | |
| WO2012121769A3 (en) | Method and systems for reservoir modeling, evaluation and simulation | |
| MX2015010395A (es) | Metodo y sistema para produccion e inyeccion de pozo. | |
| AR081027A1 (es) | Barreras para flujos subterraneos que contienen trazadores | |
| AR078110A1 (es) | Metodos mejorados de desviacion y colocacion de fluidos en formaciones subterraneas | |
| CO6731110A2 (es) | Sistema y método para el control del paso de fluído en el fondo del pozo, teniendo resistencia de flujo dependiente de la dirección | |
| AR086937A1 (es) | Sistemas y metodos para medir parametros de una formacion | |
| AR096088A1 (es) | Operaciones de facturación que emplean dióxido de cloro | |
| WO2013177161A3 (en) | Methods and systems for testing the integrity of components of a hydrocarbon well system | |
| AR091026A1 (es) | Sistemas y metodos para iniciar una prueba de verificacion dentro de un medidor de flujo a traves de una computadora de flujo | |
| CO2020013940A2 (es) | Medición de la respuesta a la presión poroelástica | |
| BR112014018798A2 (pt) | Sistema e método para determinar fontes de água em um fluido de furo descendente, e, sistema para determinar uma vazão de um componente de fluido de furo descendente | |
| GB2528192A (en) | Downhole flow measurements with optical distributed vibration/Acoustic sensing systems | |
| AR104654A1 (es) | Método para insertar sensores en un espacio anular formado entre la tubería de revestimiento y una formación en la que penetra un pozo para adquirir datos del fluido | |
| GB2506569A (en) | An apparatus, system and method for injecting a fluid into a formation downhole | |
| AR096173A1 (es) | Rompedores que contienen composiciones de hierro y sus métodos de uso | |
| BR112014001373A2 (pt) | viscômetro para uso em fundo de poço | |
| BR112016010056A8 (pt) | método de gerar ácidos fortes em furo descendente | |
| AR068290A1 (es) | Metodo y sistema para la interpretacion de ensayos de descarga usando regresion no lineal | |
| BR112014018019A8 (pt) | Método de teste da resistência de um pneu a uma perda de pressão | |
| DK2032794T3 (da) | Topfyldning af rørledning | |
| AR090635A1 (es) | Aparato, metodos y sistemas de correccion de la velocidad de compresion |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant, registration |