NO348162B1 - One-trip packer and perforating gun system, including a completion tool, a system for completing a wellbore, and a method of installing a packer in a wellbore - Google Patents

One-trip packer and perforating gun system, including a completion tool, a system for completing a wellbore, and a method of installing a packer in a wellbore Download PDF

Info

Publication number
NO348162B1
NO348162B1 NO20161843A NO20161843A NO348162B1 NO 348162 B1 NO348162 B1 NO 348162B1 NO 20161843 A NO20161843 A NO 20161843A NO 20161843 A NO20161843 A NO 20161843A NO 348162 B1 NO348162 B1 NO 348162B1
Authority
NO
Norway
Prior art keywords
packer
wellbore
completion tool
perforating gun
work string
Prior art date
Application number
NO20161843A
Other languages
Norwegian (no)
Other versions
NO20161843A1 (en
Inventor
Thomas Roane
Daniel Patterson
Gary Freeman
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Publication of NO20161843A1 publication Critical patent/NO20161843A1/en
Publication of NO348162B1 publication Critical patent/NO348162B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • E21B43/116Gun or shaped-charge perforators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/124Units with longitudinally-spaced plugs for isolating the intermediate space
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators

Landscapes

  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Shovels (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
  • Jib Cranes (AREA)

Description

ONE-TRIP PACKER AND PERFORATING GUN SYSTEM, INCLUDING A
COMPLETION TOOL, A SYSTEM FOR COMPLETING A WELLBORE, AND A
METHOD OF INSTALLING A PACKER IN A WELLBORE
BACKGROUND
In the course of completing a hydrocarbon well, a string of protective casing may be run into the wellbore followed by production tubing inside the casing. The casing is perforated across one or more production intervals to allow formation fluids to enter the casing.
During production of the formation fluid, formation sand may become entrained in the fluid and swept into the production stream. Producing sand is undesirable for multiple reasons. For example, formation sand can lead to significant wear and damage to downstream production equipment, necessitating additional filtration and separating equipment. Sand production can also compromise the integrity of the well because as sand is removed from the formation, the formation becomes increasingly unstable and prone to collapse or subsidence. Removal of sand can also lead to voids along the outside of the casing, reducing the support provided to the casing and increasing the risk of casing collapse.
To control formation sand, operators may perform a gavel pack. This process involves locating a screened section of production tubing at the production interval and packing the annulus between the production tubing and the casing with gravel. The gravel is generally sized to prevent migration of formation sand while still permitting formation fluid to flow into the production tubing.
A similar process, called a frac pack, combines a gravel pack with a fracturing operation. As with standard fracturing operations, a frac pack involves injection of high pressure fluid into the wellbore following perforation. As the fluid enters the formation via the casing perforations, the high pressure of the fluid creates fractures in the formation and causes the fractures to propagate through the formation. The fractures improve production by increasing the available flow paths between the wellbore and the formation. Fluids used in frac pack operations further contain gravel or other granular solids. These solids fill the annulus and the fractures and provide similar filtration effects as the gravel used in gravel pack operations.
Preparing a wellbore interval for a frac or gravel pack operation involves isolating the section by installing a sump packer. The sump packer is installed below the target production interval before perforating the casing and provides a lower boundary for the section being frac or gravel packed.
Typically, the sump packer is inserted into the wellbore using a wireline or work string. Wireline or e-line is generally made of flexible cord or cable, and depends in part on the force of gravity to insert tools into the wellbore. As a result, wireline is suitable for use only in substantially vertical wells (i.e., wells having less than 45 degrees of deviation) or operations in which the tool can be pumped through the wellbore.
For deviated or horizontal wells, a work string may be required. A work string is generally made of rigid or semi-rigid tubing and can be used to push the packer across deviated or horizontal portions of the wellbore.
Once inserted into the wellbore, the sump packer is correlated on depth using loggingwhile-drilling or similar equipment and then set, causing the sump packer to engage the wellbore. The e-line or work string is then detached from the packer and withdrawn from the wellbore. Perforating guns are then run into the wellbore to perforate the casing. Similar to the sump packer, the perforating guns may be correlated on depth using logging-while-drilling or similar equipment. Alternatively, the perforating gun may be inserted into the wellbore until it contacts the sump packer, then backed up to the proper position.
Separately running the sump packer and perforating gun can significantly increase rig time. As depths of modern drilling and completion operations increase, rig time stands to increase. Further, in highly deviated wells, the generally faster approach of using wireline to insert the packer and perforating gun is not available.
As a result, there is a need for a completion tool that reduces the number of wireline or work string runs necessary for preparing a wellbore for gravel or frac packing operations.
US 2008/0314591 relates generally to operations performed and equipment utilized in conjunction with a subterranean well and, in an embodiment described therein, more particularly provides a single trip well abandonment system and method with dual permanent packers and perforating gun.
BRIEF DESCRIPTION OF THE DRAWINGS
A more complete understanding of the present embodiments and advantages thereof may be acquired by referring to the following description taken in conjunction with the accompanying drawings, in which like reference numbers indicate like features.
FIG. 1 is a schematic view of a wellbore having a completed gravel pack operation.
FIG. 2 is a schematic view of a completion tool in accordance with one embodiment inserted into a wellbore
FIG. 3 is a schematic view of the completion tool of FIG. 2 in position to install a sump packer.
FIG. 4 is a schematic view of the completion tool of FIGS. 2 and 3 following firing of a perforation gun.
FIGS. 5A–5B show a cross-sectional view of a portion of the completion tool depicting a first coupling mechanism in an engaged and disengaged position for retaining a sump packer on the completion tool.
FIGS. 6A–6B show a cross-sectional view of a portion of the completion tool depicting a second coupling mechanism in an engaged and disengaged position for retaining a sump packer on the completion tool.
While embodiments of this disclosure have been depicted and described and are defined by reference to exemplary embodiments of the disclosure, such references do not imply a limitation on the disclosure, and no such limitation is to be inferred. The subject matter disclosed is capable of considerable modification, alteration, and equivalents in form and function, as will occur to those skilled in the pertinent art and having the benefit of this disclosure. The depicted and described embodiments of this disclosure are examples only, and not exhaustive of the scope of the disclosure.
DETAILED DESCRIPTION
The invention is set out in the appended set of claims.
The present disclosure relates generally to completion of hydrocarbon wells and specifically to preparations of a well bore for gravel pack or frac packing operations.
Illustrative embodiments of the present invention are described in detail herein. In the interest of clarity, not all features of an actual implementation may be described in this specification. It will of course be appreciated that in the development of any such actual embodiment, numerous implementation specific decisions must be made to achieve the specific implementation goals, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time consuming, but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of the present disclosure.
To facilitate a better understanding of this disclosure, the following examples of certain embodiments are given. In no way should the following examples be read to limit, or define, the scope of the claims.
In FIG. 1, a casing 106 is cemented into place and lines a wellbore 108. As depicted, the wellbore extends through three distinct layers of a formation 102A, 102B, and 104. The casing 106 includes a series of perforations 110 previously made using a perforating gun. The perforations 110 permit communication of fluids between the surrounding formation 104 and the inside of the casing 106. The perforations 110 correspond to a production interval 111 of the casing 106.
The production interval 111 is delineated from the rest of the wellbore by a sump packer 112, a gravel packer 114, and production tubing 116. The production tubing 116 is hollow and runs from the gravel packer 114 through the production interval 111, and through the sump packer 112. A screen section 118 of the production tubing 116 permits fluid to communicate into the production tubing 116.
FIG. 1 depicts a cross-section of an example formation in which gravel packing is commonly used. The first formation layer 102A and third formation layer 102B are intended to be made of stable rock having low permeability. The middle layer 104, on the other hand, is a looser formation, consisting of high permeability rock having a high sand content. As a result, middle layer 104 is suitable as a production zone but may be unstable and, absent operator intervention, is prone to sand production.
To prevent production of sand, gravel 120 is inserted inside the casing 106 between the production tubing 116 and the casing 106. As formation fluid flows from the formation 104, through the screen 118, and into the production tubing 116, the gravel 120 acts as a filter, retaining sand that would otherwise enter the production stream.
The gravel used in a given gravel pack operation is determined by the properties of the formation sand. The specific details of gravel selection are known in the art, but generally, gravel is selected based on the size and composition of the formation sand such that the formation sand is prevented from entering the production stream with minimal restriction to formation fluid flow between the formation and the production tubing.
The formation depicted in FIG. 1 is intended to illustrate a common gravel pack application. The characteristics of the formation depicted in FIG. 1 should not be regarded as limiting the scope or applications of this disclosure. Gravel pack operations are suitable for a wide range of formations having varying compositions. Further, gravel pack operations are suitable not only for substantially vertical wells, such as that depicted in FIG.1, but may also be applied in deviated wells.
The system and methods described in this disclosure may also be applied to combination fracturing and gravel packing operations, commonly referred to as frac pack operations. Preparation of a wellbore for gravel pack and frac pack operations is substantially similar. Both operations involve the general steps of isolating a production zone, perforating the production zone, and filling the space between the wellbore and production tubing with gravel or similar solids that act to retain formation sand.
In frac pack operations, however, the step of filling the wellbore with gravel or solids is combined with a fracturing operation. Specifically, fluid containing gravel or other solids is pumped into the wellbore and into the formation under high pressure. The pressure causes fractures in the formation and propagation of those fractures. In addition to filling the wellbore, as in a standard gravel pack operation, the gravel or solids in a fracturing operation penetrate into the newly created fractures. Once completed, the gravel or solids perform a similar function as in a gravel pack operation, retaining formation sand while permitting flow of hydrocarbons into a production tubing. By filling the newly created fractures, the gravel or solids also act as a proppant, maintaining the fractures open during the course of production.
FIGS. 2–4 depict the sequence of operation of one embodiment of a completion tool in accordance with this disclosure.
FIG. 2 is a schematic view of a completion tool according to one embodiment. The completion tool 200 is depicted inside a casing 206 cemented in a wellbore 208. The completion tool 200 is further depicted disposed on the end of a work string 222. The work string 222 may be any tubular suitable for inserting the completion tool 200 into the wellbore 208. For example, the work string 222 may be a series of work string segments, a length of coiled tubing, or any combination of similar work string elements.
To facilitate one-trip sump packer installation and perforation, the completion tool 200 includes a hydrostatic-set sump packer 212 connected beyond the distal end of a perforating gun 230. Hydrostatic-set sump packers, like sump packer 212, are generally configured to activate when exposed to a predetermined hydrostatic pressure. Activation expands one or more flexible, elastomeric packer elements, causing the elements to engage the inner surface of the casing or wellbore and fixing the packer in place.
The sump packer 212 is connected to the completion tool 200 by a coupling 232. As will be discussed later in this disclosure, the coupling 232 is configured so that the sump packer 212 is detachable from the rest of the completion tool 200 once the sump packer 212 is anchored or set in the casing 206.
As depicted in FIG.2, the completion tool 200 is inserted into the casing 206 by the work string 222. Positioning of the completion tool within the wellbore 208 may be assisted by a navigation sub 226 containing logging-while-drilling (LWD) or measurement-while-drilling (MWD) equipment. Depending on the specific equipment within the navigation sub 226, the position of the completion tool 200 may be determined based on various measurements, including but not limited to position and orientation of the navigation sub 226 and properties of the surrounding formation.
The sump packer 212 is then positioned and set within the wellbore, as shown in Fig. 3. The sump packer 212 is positioned below the intended production interval to form a lower boundary of the gravel or frac pack operation. Once in position, fluid is pumped into the work string 222 and into the casing 206 through a ported sub 228, increasing the hydrostatic pressure within the casing 206 until the setting pressure of the sump packer 212 is reached. When the setting pressure is reached, the sump packer 212 sets, expanding to engage the inner surface of the casing 206 and becoming fixed within the casing 206.
As depicted in FIG. 4, after the sump packer 212 is set, the coupling 232 is disengaged, detaching the sump packer 212 from the rest of the completion tool 200. Once detached from the sump packer 212, the completion tool 200 can be repositioned within the casing 206 to align the perforating gun 230 with a target production zone. Repositioning the completion tool 200 may be accomplished using the navigation sub 226 or by simply retracting the completion tool 200 a known distance from the set sump packer 212.
FIGS. 2–4 include a second packer 234 disposed on the completion tool 200 and located above the perforating gun 230. In embodiments having a second packer, the second packer may be mechanically set. Such packers depend on twisting or thrusting of the work string to set the packer. Once operations are complete, a substantially opposite movement of the work string may be used to disengage the packer.
The second packer 234 is optional but may be used to isolate the production zone. Isolating the production zone is useful during the steps of setting the packer and firing the perforating gun, which may be hydrostatically activated in certain embodiments. The hydrostatic pressure necessary to set the packer and/or fire the perforating gun is achieved by pumping fluid into the wellbore. Isolating the production zone using the second packer minimizes the volume necessary to be filled in order to build pressure within the production zone and as a consequence, minimizes the time required to set the packer or fire the perforating gun.
Coupling of the sump packer 212 to the completion tool 200 can be accomplished using various approaches. For example, FIGS.5A and 5B are cross-sectional views of a portion of one embodiment of a completion tool in which a sump packer 512 is connected to the completion tool using shearing members. In FIGS. 5A and 5B, the shearing members are depicted as shear pins 534A, B. Other types of shearing members include shear screws and shear sleeves, and any type of shearing member may be used alone or in combination with any other type of shearing member.
The shear pins 534A, B extend from the sump packer 512 into a coupling 532 disposed on the end of a perforating gun 530. Once the sump packer 512 is set and engages the inner surface of the casing, the completion tool is retracted, as depicted in FIG. 5B, causing the shear pins to shear and detaching the sump packer 512 from the completion tool.
FIGS. 6A and 6B are cross-sectional views of a portion of a second embodiment of a completion tool in which a sump packer 612 is connected to a coupling 632 of the completion tool using a threaded connection 634. In this embodiment, once the sump packer 612 is set and engages the inner surface of the casing, the coupling 632 may be detached from the packer 612 by disengaging the threaded connection 634 by rotating and withdrawing the work string on which the completion tool is disposed.
Other methods for coupling the sump packer to the completion tool may also be implemented. For example, in one embodiment, magnets located on the coupler and on the inside of the packer may couple the sump packer to the completion tool. In another embodiment, the shear pins depicted in FIG.5A may be replaced with pins that retract into either the sump packer or coupling. The pins may retract based on hydrostatic pressure, spring force, or electromagnetic force, such as with a solenoid.
Although numerous characteristics and advantages of embodiments of the present invention have been set forth in the foregoing description and accompanying figures, this description is illustrative only. Changes to details regarding structure and arrangement that are not specifically included in this description may nevertheless be within the full extent indicated by the claims.

Claims (14)

1. A completion tool (200) c h a r a c t e r i z e d in that it comprises:
a proximal end for connecting to a work string (222);
a distal end opposite the proximal end;
a perforating gun (230) disposed between the distal end and the proximal end; and a packer (212, 512, 612) detachably attached to the distal end by a coupling (232, 532, 632) disposed between the perforating gun (230) and the packer (212, 512, 612); wherein the packer (212, 512, 612) is detachable from the distal end by setting the packer and disengaging the coupling (232, 532, 632); and
the packer (212, 512, 612) is detachably attached to the coupling (232, 532, 632) by a threaded connection.
2. The completion tool (200) of claim 1, wherein
the work string (222) includes at least one of the group of a segmented work string and coiled tubing.
3. The completion tool (200) of claim 1 or 2, wherein
the packer (212, 512, 612) includes a hydrostatic packer.
4. The completion tool (200) of claim 1, 2 or 3, further comprising
at least one of the group of a logging-while-drilling tool and a measurement while drilling tool.
5. The completion tool (200) of any one of claims 1 to 4, further comprising
a second packer (234) disposed between the proximal end and the perforating gun (230).
6. A system for completing a wellbore (208), c h a r a c t e r i z e d in that it comprises
a work string (222);
a completion tool (200) disposed on the work string (222), the completion tool (200) comprising:
a proximal end for connecting to a work string (222);
a distal end opposite the proximal end;
a perforating gun (230) disposed between the distal end and the proximal end; and a packer (212, 512, 612) detachably attached to the distal end by a coupling (232, 532, 632) disposed between the perforating gun (230) and the packer (212, 512, 612); wherein
the packer (212, 512, 612) is detachable from the distal end by setting the packer and disengaging the coupling (232, 532, 632); and
the packer (212, 512, 612) is detachably attached to the coupling (232, 532, 632) by a threaded connection.
7. The system of claim 6, wherein
the packer (212, 512, 612) includes a hydrostatic packer.
8. The system of claim 6 or 7, further comprising
one of the group of a logging-while-drilling tool and a measurement while drilling tool.
9. The system of claim 6, 7 or 8, further comprising
a second packer (234) disposed between the proximal end and the perforating gun (230).
10. A method of installing a packer (212, 512, 612) in a wellbore (208), c h a r a c t e r i z e d in that the method comprises
positioning a completion tool (200) within the wellbore (208), the completion tool (200) comprising
a proximal end for connecting to a work string (222);
a distal end opposite the proximal end;
a perforating gun (230) disposed between the distal end and the proximal end; and a packer (212, 512, 612) detachably attached to the distal end by a coupling (232, 532, 632) disposed between the perforating gun (230) and the packer(212, 512, 612); wherein
the packer (212, 512, 612) is detachable from the distal end by setting the packer and disengaging the coupling (232, 532, 632); and
the packer (212, 512, 612) is coupled to the perforating gun (230) by a threaded connection, and the step of detaching the packer (212, 512, 612) comprises rotating the perforating gun (230), causing the threaded connection to disengage;
setting the packer within the wellbore (208); and
detaching the packer by disengaging the coupling (232, 532, 632).
11. The method of claim 10, wherein
the completion tool (200) is inserted into the wellbore (208) on a work string (222), the work string (222) including at least one of the group of a segmented work string and coiled tubing.
12. The method of claim 10 or 11, wherein
the packer (212, 512, 612) includes a hydrostatic packer and setting the packer is performed by increasing hydrostatic pressure within the wellbore (208).
13. The method of claim 10, 11 or 12, further comprising
setting a second packer (234), the second packer (234) being disposed between the proximal end and the perforating gun (230).
14. The method of any one of claims 10 to 13, wherein
the completion tool (200) further comprises at least one of the group of a logging-whiledrilling tool and a measuring-while-drilling tool and data from the logging-while-drilling tool is used to position the completion tool (200) within the wellbore (208).
NO20161843A 2014-07-02 2016-11-22 One-trip packer and perforating gun system, including a completion tool, a system for completing a wellbore, and a method of installing a packer in a wellbore NO348162B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2014/045269 WO2016003463A1 (en) 2014-07-02 2014-07-02 One-trip packer and perforating gun system

Publications (2)

Publication Number Publication Date
NO20161843A1 NO20161843A1 (en) 2016-11-22
NO348162B1 true NO348162B1 (en) 2024-09-09

Family

ID=55019805

Family Applications (1)

Application Number Title Priority Date Filing Date
NO20161843A NO348162B1 (en) 2014-07-02 2016-11-22 One-trip packer and perforating gun system, including a completion tool, a system for completing a wellbore, and a method of installing a packer in a wellbore

Country Status (4)

Country Link
AU (1) AU2014399903B2 (en)
GB (1) GB2541591B (en)
NO (1) NO348162B1 (en)
WO (1) WO2016003463A1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080314591A1 (en) * 2007-06-21 2008-12-25 Hales John H Single trip well abandonment with dual permanent packers and perforating gun

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5366014A (en) * 1993-11-04 1994-11-22 Halliburton Company Method and apparatus for perforating a well using a modular perforating gun system
US5704426A (en) * 1996-03-20 1998-01-06 Schlumberger Technology Corporation Zonal isolation method and apparatus
US6206100B1 (en) * 1999-12-20 2001-03-27 Osca, Inc. Separable one-trip perforation and gravel pack system and method
US20080006407A1 (en) * 2006-07-10 2008-01-10 Lehr Douglas J Annular fracturing service tool system
US7559364B2 (en) * 2006-09-14 2009-07-14 Gerald Bullard Bridge plug and setting tool
GB0801730D0 (en) * 2008-01-31 2008-03-05 Red Spider Technology Ltd Retrofit gas lift straddle

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080314591A1 (en) * 2007-06-21 2008-12-25 Hales John H Single trip well abandonment with dual permanent packers and perforating gun

Also Published As

Publication number Publication date
GB2541591B (en) 2019-03-13
NO20161843A1 (en) 2016-11-22
WO2016003463A1 (en) 2016-01-07
GB201620079D0 (en) 2017-01-11
AU2014399903A1 (en) 2016-11-24
GB2541591A (en) 2017-02-22
AU2014399903B2 (en) 2017-11-23

Similar Documents

Publication Publication Date Title
US20160084034A1 (en) One-trip packer and perforating gun system
JP5325233B2 (en) Method and apparatus for programmable pressure drilling and programmable gradient drilling and finishing
US7036610B1 (en) Apparatus and method for completing oil and gas wells
US9103207B2 (en) Multi-zone completion systems and methods
US20070284106A1 (en) Method and apparatus for well drilling and completion
US11708745B2 (en) Method for incorporating scrapers in multi zone packer assembly
Acock et al. Practical approaches to sand management
GB2503559B (en) Hybrid-tieback seal assembly
US20150252669A1 (en) Method and apparatus for reservoir testing and monitoring
WO2018132105A1 (en) Simulated wellbore control for dynamic underbalance testing
WO2019140287A2 (en) Method of avoiding frac hits during formation stimulation
EP2929135B1 (en) Systems and methods for optimized well creation in a shale formation
US8944170B2 (en) Real time downhole intervention during wellbore stimulation operations
Burton et al. Multizone Casedhole Frac Packs and Intelligent-Well Systems Improve Recovery in Subsea Gas Fields
WO2015074042A2 (en) Subsea intervention plug pulling device
CN112313392A (en) Well Construction and Completion Methods
US20090101343A1 (en) High rate gravel packing
AU2014399903B2 (en) One-trip packer and perforating gun system
EP3548696B1 (en) Single-trip wellbore liner drilling system
US12312871B2 (en) Interventionless methods and systems for testing a liner top
Abbasy et al. Challenges in completing long horizontal wells selectively
Al-Azkawi et al. Multilateral wells improve development of heavy crude production in the Mukhaizna field, Sultanate of Oman
Urbina et al. Successful Installation of a New 15K Multistage Frac (MSF) Completion in a Challenging Extended Reach Lateral HPHT Gas Well
CN101772617B (en) Method for altering the stress state of a formation and/or a tubular
Cappiello et al. Three Decades of Multilateral Technology Advancements on the Norwegian Continental Shelf