NO20092918L - Fremgangsmater og apparat for a utfore trykktesting av geologiske formasjoner - Google Patents
Fremgangsmater og apparat for a utfore trykktesting av geologiske formasjonerInfo
- Publication number
- NO20092918L NO20092918L NO20092918A NO20092918A NO20092918L NO 20092918 L NO20092918 L NO 20092918L NO 20092918 A NO20092918 A NO 20092918A NO 20092918 A NO20092918 A NO 20092918A NO 20092918 L NO20092918 L NO 20092918L
- Authority
- NO
- Norway
- Prior art keywords
- interval
- sample
- methods
- pressure
- test tool
- Prior art date
Links
- 238000012360 testing method Methods 0.000 title abstract 5
- 230000015572 biosynthetic process Effects 0.000 title abstract 3
- 238000005755 formation reaction Methods 0.000 title abstract 3
- 238000000034 method Methods 0.000 title abstract 3
- 239000012530 fluid Substances 0.000 abstract 2
- 238000007789 sealing Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/12—Packers; Plugs
- E21B33/124—Units with longitudinally-spaced plugs for isolating the intermediate space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
- E21B49/088—Well testing, e.g. testing for reservoir productivity or formation parameters combined with sampling
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Geophysics (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Measuring Fluid Pressure (AREA)
- Examining Or Testing Airtightness (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/202,868 US8015869B2 (en) | 2008-09-02 | 2008-09-02 | Methods and apparatus to perform pressure testing of geological formations |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| NO20092918L true NO20092918L (no) | 2010-03-03 |
Family
ID=41171635
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20092918A NO20092918L (no) | 2008-09-02 | 2009-09-01 | Fremgangsmater og apparat for a utfore trykktesting av geologiske formasjoner |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US8015869B2 (es) |
| BR (1) | BRPI0902663A2 (es) |
| EG (1) | EG25940A (es) |
| GB (1) | GB2462911B (es) |
| MX (1) | MX2009009161A (es) |
| MY (1) | MY147671A (es) |
| NO (1) | NO20092918L (es) |
Families Citing this family (35)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8015869B2 (en) * | 2008-09-02 | 2011-09-13 | Schlumberger Technology Corporation | Methods and apparatus to perform pressure testing of geological formations |
| US8985218B2 (en) | 2009-10-05 | 2015-03-24 | Schlumberger Technology Corporation | Formation testing |
| US9238961B2 (en) | 2009-10-05 | 2016-01-19 | Schlumberger Technology Corporation | Oilfield operation using a drill string |
| BR112012007730A2 (pt) | 2009-10-06 | 2016-08-23 | Prad Res & Dev Ltd | planejamento e monitoramento de testes de formação |
| CN102121377B (zh) * | 2011-01-05 | 2013-07-31 | 中国海洋石油总公司 | 一种随钻地层压力测量仪器及其测量方法 |
| US9581019B2 (en) * | 2011-03-23 | 2017-02-28 | Schlumberger Technology Corporation | Measurement pretest drawdown methods and apparatus |
| US8905130B2 (en) * | 2011-09-20 | 2014-12-09 | Schlumberger Technology Corporation | Fluid sample cleanup |
| US9062544B2 (en) * | 2011-11-16 | 2015-06-23 | Schlumberger Technology Corporation | Formation fracturing |
| KR101460029B1 (ko) * | 2013-05-02 | 2014-11-10 | 한국지질자원연구원 | 시추 중 지층 연결성 테스트 방법 |
| US9714570B2 (en) | 2013-07-03 | 2017-07-25 | Schlumberger Technology Corporation | Packer-packer vertical interference testing |
| US9759055B2 (en) * | 2013-12-18 | 2017-09-12 | Schlumberger Technology Corporation | Formation fracturing and sampling methods |
| CN104132761B (zh) | 2014-08-04 | 2016-01-27 | 中国矿业大学 | 多点煤岩体应力实时监测装置及方法 |
| US9976402B2 (en) * | 2014-09-18 | 2018-05-22 | Baker Hughes, A Ge Company, Llc | Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool |
| US9708906B2 (en) | 2014-09-24 | 2017-07-18 | Baker Hughes Incorporated | Method and system for hydraulic fracture diagnosis with the use of a coiled tubing dual isolation service tool |
| US10317875B2 (en) * | 2015-09-30 | 2019-06-11 | Bj Services, Llc | Pump integrity detection, monitoring and alarm generation |
| WO2017196303A1 (en) * | 2016-05-10 | 2017-11-16 | Halliburton Energy Services Inc. | Tester valve below a production packer |
| WO2018182884A1 (en) * | 2017-03-31 | 2018-10-04 | Halliburton Energy Services, Inc. | Downhole, real-time determination of relative permeability with nuclear magnetic resonance and formation testing measurements |
| US10704369B2 (en) * | 2017-06-22 | 2020-07-07 | Saudi Arabian Oil Company | Simultaneous injection and fracturing interference testing |
| CN108729905A (zh) * | 2018-04-20 | 2018-11-02 | 中国石油天然气股份有限公司 | 一种抽油机井过环空对接监测调整电控堵水管柱 |
| CN112714820B (zh) * | 2018-09-14 | 2024-06-07 | 埃尼股份公司 | 通过钻井设备估算待钻的地质构造中孔隙压力值的方法 |
| US11359480B2 (en) * | 2019-05-31 | 2022-06-14 | Halliburton Energy Services, Inc. | Pressure measurement supercharging mitigation |
| IT201900009873A1 (it) * | 2019-06-24 | 2020-12-24 | Eni Spa | Sistema di rilevazione per rilevare interfacce di discontinuita’ e/o anomalie nelle pressioni dei pori in formazioni geologiche. |
| US12000268B2 (en) | 2019-12-27 | 2024-06-04 | Adams Testing Services, Inc. | Hydraulic pressure testing system, and method of testing tubular products |
| US11506050B2 (en) * | 2019-12-27 | 2022-11-22 | Adams Testing Service, Inc. | Hydraulic pressure testing system, and method of testing tubular products |
| US12360026B2 (en) | 2019-12-27 | 2025-07-15 | Adams Testing Service, Inc. | Hydraulic pressure testing system, and method of testing tubular products |
| RU2761909C1 (ru) * | 2021-01-11 | 2021-12-14 | Общество с ограниченной ответственностью "Газпром добыча Уренгой" | Способ опрессовки эксплуатационной обсадной колонны простаивающей скважины |
| US12523105B2 (en) | 2021-06-22 | 2026-01-13 | Schlumberger Technology Corporation | Processes for injection of fluids into a wellbore via drill pipe |
| CN114112181B (zh) * | 2021-11-26 | 2024-06-04 | 山东科技大学 | 一种无线应力监测声光预警仪及监测预警方法 |
| US12345154B2 (en) | 2022-09-14 | 2025-07-01 | Saudi Arabian Oil Company | Untethered logging devices and related methods of logging a wellbore |
| US11913329B1 (en) | 2022-09-21 | 2024-02-27 | Saudi Arabian Oil Company | Untethered logging devices and related methods of logging a wellbore |
| US12134949B2 (en) * | 2022-12-21 | 2024-11-05 | Schlumberger Technology Corporation | Processes for injection of fluids into a wellbore |
| WO2025117494A1 (en) * | 2023-11-29 | 2025-06-05 | Schlumberger Technology Corporation | Method for in situ wellbore cleaning with dual packer |
| CN117418798B (zh) * | 2023-12-19 | 2024-03-15 | 东北石油大学三亚海洋油气研究院 | 一种钻井注液智能调节方法、装置及系统 |
| US12486762B2 (en) | 2024-01-11 | 2025-12-02 | Saudi Arabian Oil Company | Systems and methods for untethered wellbore investigation using modular autonomous device |
| CN117927749B (zh) * | 2024-03-22 | 2024-05-17 | 胜利油田胜机石油装备有限公司 | 一种隔热管用新式隔热接箍 |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3323360A (en) * | 1963-08-13 | 1967-06-06 | Schlumberger Technology Corp | Methods and apparatus for analyzing well production |
| US3871218A (en) | 1972-08-25 | 1975-03-18 | Anvar | Method and apparatus for determining the permeability characteristics of a porous or fissured medium |
| US4353249A (en) * | 1980-10-30 | 1982-10-12 | Systems, Science And Software | Method and apparatus for in situ determination of permeability and porosity |
| US4392376A (en) | 1981-03-31 | 1983-07-12 | S-Cubed | Method and apparatus for monitoring borehole conditions |
| US4936139A (en) | 1988-09-23 | 1990-06-26 | Schlumberger Technology Corporation | Down hole method for determination of formation properties |
| US5831156A (en) * | 1997-03-12 | 1998-11-03 | Mullins; Albert Augustus | Downhole system for well control and operation |
| US6301959B1 (en) * | 1999-01-26 | 2001-10-16 | Halliburton Energy Services, Inc. | Focused formation fluid sampling probe |
| US6478096B1 (en) * | 2000-07-21 | 2002-11-12 | Baker Hughes Incorporated | Apparatus and method for formation testing while drilling with minimum system volume |
| US6986282B2 (en) | 2003-02-18 | 2006-01-17 | Schlumberger Technology Corporation | Method and apparatus for determining downhole pressures during a drilling operation |
| CN1317484C (zh) | 2003-09-19 | 2007-05-23 | 吴孝喜 | 采油井在生产状态下腔式取样找水求产方法 |
| US7031841B2 (en) | 2004-01-30 | 2006-04-18 | Schlumberger Technology Corporation | Method for determining pressure of earth formations |
| US20080066535A1 (en) | 2006-09-18 | 2008-03-20 | Schlumberger Technology Corporation | Adjustable Testing Tool and Method of Use |
| US8015869B2 (en) * | 2008-09-02 | 2011-09-13 | Schlumberger Technology Corporation | Methods and apparatus to perform pressure testing of geological formations |
| CN101403293B (zh) | 2008-11-11 | 2012-06-06 | 大庆油田有限责任公司 | 一种适用于油井的管柱式井下关井分层测压工艺 |
| US8322416B2 (en) * | 2009-06-18 | 2012-12-04 | Schlumberger Technology Corporation | Focused sampling of formation fluids |
-
2008
- 2008-09-02 US US12/202,868 patent/US8015869B2/en active Active
-
2009
- 2009-08-19 EG EG2009081248A patent/EG25940A/xx active
- 2009-08-20 GB GB0914525A patent/GB2462911B/en not_active Expired - Fee Related
- 2009-08-20 BR BRPI0902663-0A patent/BRPI0902663A2/pt active Search and Examination
- 2009-08-27 MX MX2009009161A patent/MX2009009161A/es active IP Right Grant
- 2009-09-01 NO NO20092918A patent/NO20092918L/no not_active Application Discontinuation
- 2009-09-01 MY MYPI20093613A patent/MY147671A/en unknown
Also Published As
| Publication number | Publication date |
|---|---|
| EG25940A (en) | 2012-11-05 |
| BRPI0902663A2 (pt) | 2010-08-03 |
| MX2009009161A (es) | 2010-04-30 |
| GB2462911A (en) | 2010-03-03 |
| US20100050762A1 (en) | 2010-03-04 |
| US8015869B2 (en) | 2011-09-13 |
| GB0914525D0 (en) | 2009-09-30 |
| MY147671A (en) | 2012-12-31 |
| GB2462911B (en) | 2011-05-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20092918L (no) | Fremgangsmater og apparat for a utfore trykktesting av geologiske formasjoner | |
| US10669832B2 (en) | Well system of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad | |
| US11435336B2 (en) | Method for determining content of lost gas in shale gas content test | |
| NO20063888L (no) | Fremgangsmate og apparat for fluidanalyse | |
| CN106596380B (zh) | 一种页岩分段压裂水平井压裂液返排能力评价方法及装置 | |
| NO20092892L (no) | Fremgangsmate og anordning for a redusere tettheten til et bronnhullsfluid ved nedihulls fluidanalyse | |
| NO20065932L (no) | Fremgangsmater for anvendelse av en formasjonstester | |
| NO20081624L (no) | Fremgangsmate for boring og produksjon av hydrokarboner fra undergrunnsformasjoner | |
| NO20100712L (no) | Anordning og fremgangsmate for a analysere fluider i bronnhull ved bruk av ioniserte fluidprover | |
| NO20083322L (no) | Bronnboremetode og apparat for komplettering, produksjon og injeksjon | |
| NO20093585L (no) | Fremgangsmate og anordning for a evaluere undergrunnsformasjoner | |
| WO2008106376A3 (en) | Logging method for determining characteristic of fluid in a downhole measurement region | |
| Desroches et al. | Modelling the propagation and closure of micro-hydraulic fractures | |
| CA3029607A1 (en) | Mapping of fracture geometries in a multi-well stimulation process | |
| PL408174A1 (pl) | Układ i sposób przeprowadzania operacji stymulacji odwiertu | |
| NO341575B1 (no) | Fremgangsmåte for måling av overtrykk i et undergrunnsreservoar krysset av et borehull | |
| NO20052121L (no) | Fremgangsmate for bestemmelse av formasjonsfluiders egenskaper | |
| NO20093266L (no) | Fremgangsmate for a estimere produktivitet fra formasjoner ved hjelp av kjernemagnetiske resonansmalinger | |
| NO20082750L (no) | Fremgangsmate for kvantitativt a evaluere fluid trykk og for a detektere overtrykk i et undergrunnsmedium | |
| NO20064386L (no) | Fremgangsmate og anordning for a pavise sprekker fra tidligere frakturering i underjordiske formasjoner | |
| CN112304842B (zh) | 一种页岩油co2/n2交替驱替注入量模拟分析方法 | |
| NO20100223L (no) | System og fremgangsmate for integrering av datamaskinmodeller av undergrunnen for olje- og gassleting | |
| NO20091574L (no) | Elektromagnetisk seismisk loggesystem og fremgangsmate | |
| CN106522933A (zh) | 一种模拟固井水泥浆对储层伤害的评价装置及评价方法 | |
| MY170650A (en) | Measurement pretest drawdown methods and apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FC2A | Withdrawal, rejection or dismissal of laid open patent application |