NO20073658L - System og fremgangsmate for produksjon av fluider fra undergrunnsformasjoner - Google Patents
System og fremgangsmate for produksjon av fluider fra undergrunnsformasjonerInfo
- Publication number
- NO20073658L NO20073658L NO20073658A NO20073658A NO20073658L NO 20073658 L NO20073658 L NO 20073658L NO 20073658 A NO20073658 A NO 20073658A NO 20073658 A NO20073658 A NO 20073658A NO 20073658 L NO20073658 L NO 20073658L
- Authority
- NO
- Norway
- Prior art keywords
- well
- subsurface
- flow
- drainage
- underground formations
- Prior art date
Links
- 239000012530 fluid Substances 0.000 title abstract 4
- 230000015572 biosynthetic process Effects 0.000 title abstract 3
- 238000005755 formation reaction Methods 0.000 title abstract 3
- 238000004519 manufacturing process Methods 0.000 title 1
- 238000011084 recovery Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Earth Drilling (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
- Heterocyclic Carbon Compounds Containing A Hetero Ring Having Nitrogen And Oxygen As The Only Ring Hetero Atoms (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
System av undergrunnsbrønner inkluderer en undergrunns-strømningsbrønn (20) som har i det minste en del beliggende inne i eller under én eller flere undergrunnsformasjoner (12). Én eller flere dreneringsbrønner (26, 28, 30, 32 og 34) strekker seg hver fra overflaten og krysser/skjærer i det minste én av undergrunnsformasjonene ved en respektiv krysnings/skjærings-lokalitet. En nedre del av hver dreneringsbrønn er i fluidkommunikasjon med undergrunns-strømningsbrønnen (20). En utvinningsbrønn (42) strekker seg fra overflaten og er også i fluidkommunikasjon med undergrunns-strømningsbrønnen (20), slik at fluider som går inn i dreneringsbrønnen strømmer inn i undergrunns-strømningsbrønnen (20) og deretter inn i utvinningsbrønnen.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US64438505P | 2005-01-14 | 2005-01-14 | |
| PCT/US2006/001180 WO2006076547A2 (en) | 2005-01-14 | 2006-01-12 | System and method for producing fluids from a subterranean formation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| NO20073658L true NO20073658L (no) | 2007-08-13 |
| NO341183B1 NO341183B1 (no) | 2017-09-04 |
Family
ID=36678218
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| NO20073658A NO341183B1 (no) | 2005-01-14 | 2007-07-17 | System og fremgangsmåte for produksjon av fluider fra undergrunnsformasjoner |
Country Status (8)
| Country | Link |
|---|---|
| US (2) | US7451814B2 (no) |
| CN (1) | CN101395338B (no) |
| BR (1) | BRPI0605923B1 (no) |
| CA (1) | CA2595018C (no) |
| MX (1) | MX2007008515A (no) |
| MY (1) | MY143983A (no) |
| NO (1) | NO341183B1 (no) |
| WO (1) | WO2006076547A2 (no) |
Families Citing this family (44)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8760657B2 (en) * | 2001-04-11 | 2014-06-24 | Gas Sensing Technology Corp | In-situ detection and analysis of methane in coal bed methane formations with spectrometers |
| BRPI0605923B1 (pt) * | 2005-01-14 | 2018-07-03 | Halliburton Energy Services, Inc. | "Sistema de poços subterrâneos, sistema para produção de fluidos a partir de duas ou mais formações subterrâneas, método de construção de um sistema de poço, método de construção de um sistema de poço em um campo contendo um ou mais poços existentes, método de produção de fluidos a partir de duas ou mais formações subterrâneas separadas verticalmente por uma ou mais camadas impermeáveis, sistema de poços subterrâneos para produzir fluidos, sistema para produção de fluidos a partir de uma ou mais formações subterrâneas, método de produção de fluidos a partir de uma ou mais formações subterrâneas" |
| EA200801333A1 (ru) * | 2005-11-16 | 2009-02-27 | Шелл Интернэшнл Рисерч Маатсхаппий Б.В. | Система стволов скважин |
| US20090090499A1 (en) * | 2007-10-05 | 2009-04-09 | Schlumberger Technology Corporation | Well system and method for controlling the production of fluids |
| US7775271B2 (en) * | 2007-10-19 | 2010-08-17 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7775277B2 (en) * | 2007-10-19 | 2010-08-17 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US20090101336A1 (en) * | 2007-10-19 | 2009-04-23 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7913755B2 (en) | 2007-10-19 | 2011-03-29 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7793714B2 (en) * | 2007-10-19 | 2010-09-14 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7784543B2 (en) * | 2007-10-19 | 2010-08-31 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US7789139B2 (en) * | 2007-10-19 | 2010-09-07 | Baker Hughes Incorporated | Device and system for well completion and control and method for completing and controlling a well |
| US8898017B2 (en) * | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
| US8171999B2 (en) | 2008-05-13 | 2012-05-08 | Baker Huges Incorporated | Downhole flow control device and method |
| US8555958B2 (en) | 2008-05-13 | 2013-10-15 | Baker Hughes Incorporated | Pipeless steam assisted gravity drainage system and method |
| US7789152B2 (en) * | 2008-05-13 | 2010-09-07 | Baker Hughes Incorporated | Plug protection system and method |
| US8113292B2 (en) | 2008-05-13 | 2012-02-14 | Baker Hughes Incorporated | Strokable liner hanger and method |
| WO2009148723A1 (en) * | 2008-06-04 | 2009-12-10 | Exxonmobil Upstream Research Company | Inter and intra-reservoir flow controls |
| CA2749591C (en) * | 2009-02-05 | 2017-04-18 | Cft Technologies (Hk) Limited | Recovery or storage process |
| US8132624B2 (en) | 2009-06-02 | 2012-03-13 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints and method |
| US8151881B2 (en) | 2009-06-02 | 2012-04-10 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints |
| US8056627B2 (en) | 2009-06-02 | 2011-11-15 | Baker Hughes Incorporated | Permeability flow balancing within integral screen joints and method |
| US8196655B2 (en) * | 2009-08-31 | 2012-06-12 | Halliburton Energy Services, Inc. | Selective placement of conformance treatments in multi-zone well completions |
| CA2784496A1 (en) * | 2009-12-15 | 2011-07-14 | Chevron U.S.A. Inc. | System, method and assembly for wellbore maintenance operations |
| US8347960B2 (en) | 2010-01-25 | 2013-01-08 | Water Tectonics, Inc. | Method for using electrocoagulation in hydraulic fracturing |
| US8490695B2 (en) * | 2010-02-08 | 2013-07-23 | Apache Corporation | Method for drilling and fracture treating multiple wellbores |
| US9286437B2 (en) * | 2010-03-15 | 2016-03-15 | Landmark Graphics Corporation | Systems and methods for positioning horizontal wells within boundaries |
| US8561704B2 (en) * | 2010-06-28 | 2013-10-22 | Halliburton Energy Services, Inc. | Flow energy dissipation for downhole injection flow control devices |
| US8672034B2 (en) * | 2011-04-19 | 2014-03-18 | Saudi Arabian Oil Company | Well system with lateral main bore and strategically disposed lateral bores and method of forming |
| CN103174191A (zh) * | 2011-12-20 | 2013-06-26 | 袁波 | 联井结构 |
| AU2012371599B2 (en) * | 2012-03-02 | 2016-05-05 | Halliburton Energy Services, Inc. | Subsurface well systems with multiple drain wells extending from a production well and methods for use thereof |
| US9388668B2 (en) * | 2012-11-23 | 2016-07-12 | Robert Francis McAnally | Subterranean channel for transporting a hydrocarbon for prevention of hydrates and provision of a relief well |
| CN103867179B (zh) * | 2012-12-11 | 2016-08-24 | 中国石油化工股份有限公司 | U型井水力喷射压裂方法 |
| CN103628848B (zh) * | 2013-12-02 | 2016-09-07 | 中国地质大学(武汉) | 多方位层间注水驱替采油方法和系统 |
| US20170362491A1 (en) * | 2014-12-09 | 2017-12-21 | University of Virginia Patent Foundation, d/b/a University of VA Licensing & Ventures Group | System and related method to seal fractured shale |
| CN104790931A (zh) * | 2015-03-10 | 2015-07-22 | 中国海洋石油总公司 | 一种海上低渗油藏薄互层注采分枝井增控方法 |
| CN104947741A (zh) * | 2015-07-03 | 2015-09-30 | 张清才 | 一种地下微量山泉水引水装置 |
| US11168542B2 (en) * | 2015-11-16 | 2021-11-09 | Halliburton Energy Services, Inc. | Scheduling treatment fluid placement and fluid diversion in a subterranean formation |
| US10875209B2 (en) | 2017-06-19 | 2020-12-29 | Nuwave Industries Inc. | Waterjet cutting tool |
| CN107387056A (zh) * | 2017-08-22 | 2017-11-24 | 陕西省煤田地质集团有限公司 | 一种换热型水平对接地热井的井身结构 |
| CN107366531B (zh) * | 2017-08-22 | 2019-08-27 | 陕西省煤田地质集团有限公司 | 一种基于斜井水平对接型地热井井眼轨道及设计方法 |
| CN107605455A (zh) * | 2017-08-22 | 2018-01-19 | 陕西省煤田地质集团有限公司 | 一种基于直井负位移水平对接型地热井井眼轨道及设计方法 |
| CN107476797A (zh) * | 2017-08-22 | 2017-12-15 | 陕西省煤田地质集团有限公司 | 一种换热型水平对接地热井的井身结构的施工方法 |
| US11988081B2 (en) * | 2021-03-22 | 2024-05-21 | Ghw Solutions, Llc | Gravity assisted reservoir drainage systems and methods |
| US20240026863A1 (en) * | 2022-07-25 | 2024-01-25 | Gti Energy | Vertical and helical well designs for enhanced geothermal systems |
Family Cites Families (33)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2970826A (en) * | 1958-11-21 | 1961-02-07 | Texaco Inc | Recovery of oil from oil shale |
| US3386508A (en) * | 1966-02-21 | 1968-06-04 | Exxon Production Research Co | Process and system for the recovery of viscous oil |
| US4016942A (en) * | 1972-06-10 | 1977-04-12 | Trunkline Gas Company | Method and apparatus for indicating the position of one well bore with respect to a second well bore |
| FR2398874A1 (fr) * | 1977-07-25 | 1979-02-23 | Inst Francais Du Petrole | Utilisation de mouts de fermentation pour la recuperation assistee du petrole |
| US4248302A (en) * | 1979-04-26 | 1981-02-03 | Otis Engineering Corporation | Method and apparatus for recovering viscous petroleum from tar sand |
| US4343363A (en) * | 1981-01-02 | 1982-08-10 | Marathon Oil Company | Process for cleaning a subterranean injection surface and for selectively reducing the permeability of a subterranean formation |
| US4390067A (en) * | 1981-04-06 | 1983-06-28 | Exxon Production Research Co. | Method of treating reservoirs containing very viscous crude oil or bitumen |
| US4393939A (en) * | 1981-04-20 | 1983-07-19 | Halliburton Services | Clay stabilization during oil and gas well cementing operations |
| US4458945A (en) * | 1981-10-01 | 1984-07-10 | Ayler Maynard F | Oil recovery mining method and apparatus |
| US4460483A (en) * | 1981-10-09 | 1984-07-17 | Halliburton Company | Methods and hydrocarbon base treating fluids for stabilizing water sensitive clay containing formations |
| US4501674A (en) * | 1982-09-01 | 1985-02-26 | Phillips Petroleum Company | Method for reducing corrosiveness of aqueous fluids |
| US4532986A (en) * | 1983-05-05 | 1985-08-06 | Texaco Inc. | Bitumen production and substrate stimulation with flow diverter means |
| US4519463A (en) * | 1984-03-19 | 1985-05-28 | Atlantic Richfield Company | Drainhole drilling |
| US4646836A (en) * | 1984-08-03 | 1987-03-03 | Hydril Company | Tertiary recovery method using inverted deviated holes |
| US4676313A (en) * | 1985-10-30 | 1987-06-30 | Rinaldi Roger E | Controlled reservoir production |
| US4682652A (en) * | 1986-06-30 | 1987-07-28 | Texaco Inc. | Producing hydrocarbons through successively perforated intervals of a horizontal well between two vertical wells |
| US5074360A (en) * | 1990-07-10 | 1991-12-24 | Guinn Jerry H | Method for repoducing hydrocarbons from low-pressure reservoirs |
| US5054551A (en) * | 1990-08-03 | 1991-10-08 | Chevron Research And Technology Company | In-situ heated annulus refining process |
| US5258755A (en) * | 1992-04-27 | 1993-11-02 | Vector Magnetics, Inc. | Two-source magnetic field guidance system |
| US5402851A (en) * | 1993-05-03 | 1995-04-04 | Baiton; Nick | Horizontal drilling method for hydrocarbon recovery |
| US5450902A (en) * | 1993-05-14 | 1995-09-19 | Matthews; Cameron M. | Method and apparatus for producing and drilling a well |
| US5732776A (en) * | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
| US6729394B1 (en) * | 1997-05-01 | 2004-05-04 | Bp Corporation North America Inc. | Method of producing a communicating horizontal well network |
| US6119776A (en) * | 1998-02-12 | 2000-09-19 | Halliburton Energy Services, Inc. | Methods of stimulating and producing multiple stratified reservoirs |
| US6263965B1 (en) * | 1998-05-27 | 2001-07-24 | Tecmark International | Multiple drain method for recovering oil from tar sand |
| US7048049B2 (en) * | 2001-10-30 | 2006-05-23 | Cdx Gas, Llc | Slant entry well system and method |
| US6280000B1 (en) * | 1998-11-20 | 2001-08-28 | Joseph A. Zupanick | Method for production of gas from a coal seam using intersecting well bores |
| US6681855B2 (en) * | 2001-10-19 | 2004-01-27 | Cdx Gas, L.L.C. | Method and system for management of by-products from subterranean zones |
| US7360595B2 (en) | 2002-05-08 | 2008-04-22 | Cdx Gas, Llc | Method and system for underground treatment of materials |
| US7264048B2 (en) * | 2003-04-21 | 2007-09-04 | Cdx Gas, Llc | Slot cavity |
| US20050241834A1 (en) | 2004-05-03 | 2005-11-03 | Mcglothen Jody R | Tubing/casing connection for U-tube wells |
| BRPI0518347B1 (pt) | 2004-11-19 | 2017-12-19 | Halliburton Energy Services, Inc. | Method for connecting a underground road, and, well hole network |
| BRPI0605923B1 (pt) | 2005-01-14 | 2018-07-03 | Halliburton Energy Services, Inc. | "Sistema de poços subterrâneos, sistema para produção de fluidos a partir de duas ou mais formações subterrâneas, método de construção de um sistema de poço, método de construção de um sistema de poço em um campo contendo um ou mais poços existentes, método de produção de fluidos a partir de duas ou mais formações subterrâneas separadas verticalmente por uma ou mais camadas impermeáveis, sistema de poços subterrâneos para produzir fluidos, sistema para produção de fluidos a partir de uma ou mais formações subterrâneas, método de produção de fluidos a partir de uma ou mais formações subterrâneas" |
-
2006
- 2006-01-12 BR BRPI0605923-6A patent/BRPI0605923B1/pt not_active IP Right Cessation
- 2006-01-12 CA CA2595018A patent/CA2595018C/en not_active Expired - Fee Related
- 2006-01-12 MY MYPI20060141A patent/MY143983A/en unknown
- 2006-01-12 CN CN2006800022220A patent/CN101395338B/zh not_active Expired - Fee Related
- 2006-01-12 US US11/331,293 patent/US7451814B2/en active Active
- 2006-01-12 WO PCT/US2006/001180 patent/WO2006076547A2/en not_active Ceased
- 2006-01-12 MX MX2007008515A patent/MX2007008515A/es active IP Right Grant
-
2007
- 2007-07-17 NO NO20073658A patent/NO341183B1/no not_active IP Right Cessation
-
2008
- 2008-10-23 US US12/256,720 patent/US7819187B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| US7819187B2 (en) | 2010-10-26 |
| WO2006076547A2 (en) | 2006-07-20 |
| US20090038792A1 (en) | 2009-02-12 |
| US7451814B2 (en) | 2008-11-18 |
| WO2006076547B1 (en) | 2008-11-06 |
| BRPI0605923A2 (pt) | 2009-06-02 |
| CN101395338B (zh) | 2013-12-11 |
| WO2006076547A3 (en) | 2008-10-09 |
| MX2007008515A (es) | 2007-11-09 |
| US20060157242A1 (en) | 2006-07-20 |
| BRPI0605923B1 (pt) | 2018-07-03 |
| CN101395338A (zh) | 2009-03-25 |
| CA2595018A1 (en) | 2006-07-20 |
| CA2595018C (en) | 2011-08-16 |
| NO341183B1 (no) | 2017-09-04 |
| MY143983A (en) | 2011-07-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| NO20073658L (no) | System og fremgangsmate for produksjon av fluider fra undergrunnsformasjoner | |
| EA200870408A1 (ru) | Скважинные способ и устройство для предотвращения выноса песка и регулирования притока во время скважинных операций | |
| CN102080526B (zh) | 地面煤层顶板顺层水平压裂井抽采瓦斯方法 | |
| WO2011143639A3 (en) | Materials and methods for temporarily obstructing portions of drilled wells | |
| US10408033B2 (en) | Well design to enhance hydrocarbon recovery | |
| ECSP19086138A (es) | Sistema y métodos relacionados para fracturar y completar un pozo que instala fluyentemente rejillas de arena para el control de arena | |
| GB2450829A (en) | Perforating and fracturing | |
| MX2010003218A (es) | Metodo para completar depositos de petroleo y gas hermeticos. | |
| BRPI0715142B8 (pt) | método e sistema para realizar operações em campos de petróleo com base em predição de pressão de poro | |
| EA201070207A1 (ru) | Способ управления добычей из нефтегазоносного коллектора в режиме реального времени | |
| MX2009013365A (es) | Metodo para recuperar petroleo crudo de una formacion subterranea. | |
| ECSP109954A (es) | Drenaje de yacimientos de petróleo pesado a través de una perforación de pozo horizontal | |
| NO20061330L (no) | System og fremgangsmate for styring av uonsket fluidinntrengning under hydrokarbonproduksjon | |
| GB2456925A (en) | System and method for performing oilfield simulation operations | |
| US20160047179A1 (en) | Increasing hydrocarbon recovery from reservoirs | |
| GB2464003B (en) | System and method for performing oilfield simulation operations | |
| RU2007148901A (ru) | Система буровых скважин с полостью | |
| EA200801333A1 (ru) | Система стволов скважин | |
| WO2023225467A1 (en) | Carbon dioxide sequestration in horizontal subterranean wells | |
| RU2438008C1 (ru) | Способ совместной эксплуатации нескольких объектов в добывающей скважине и устройство для его осуществления | |
| RU2014132034A (ru) | Подземная скважинная система со множеством дренажных скважин, отходящих от эксплуатационной скважины, и способ ее использования | |
| RU2667210C1 (ru) | Способ эксплуатации месторождения углеводородов | |
| GB2437017A (en) | System and method for producing fluids from a subterranean formation | |
| Cao et al. | Re-Fracturing and Water Flooding Western Canada Tight Oil Reservoir Horizontal Wells | |
| CN104818977A (zh) | 一种海上低渗油藏单井平行裂缝注水采油方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM1K | Lapsed by not paying the annual fees |