|
US8145463B2
(en)
*
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
|
FR2894672B1
(fr)
*
|
2005-12-12 |
2008-01-18 |
Inst Francais Du Petrole |
Methode de determination des capacites de stockage de gaz acides d'un milieu geologique a l'aide d'un modele de transport reactif multiphasique
|
|
US7877246B2
(en)
*
|
2006-09-22 |
2011-01-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US7895241B2
(en)
*
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
|
US8352227B2
(en)
*
|
2006-10-30 |
2013-01-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
WO2008086196A1
(en)
*
|
2007-01-05 |
2008-07-17 |
Landmark Graphics Corporation, A Halliburton Company |
Systems and methods for selectively imaging objects in a display of multiple three-dimensional data-objects
|
|
US20080319726A1
(en)
|
2007-06-19 |
2008-12-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US8775141B2
(en)
*
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
|
US8244509B2
(en)
*
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
|
US7900700B2
(en)
*
|
2007-08-02 |
2011-03-08 |
Schlumberger Technology Corporation |
Method and system for cleat characterization in coal bed methane wells for completion optimization
|
|
US8156131B2
(en)
*
|
2007-08-27 |
2012-04-10 |
Schlumberger Technology Corporation |
Quality measure for a data context service
|
|
US9070172B2
(en)
*
|
2007-08-27 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and system for data context service
|
|
US20090083006A1
(en)
*
|
2007-09-20 |
2009-03-26 |
Randall Mackie |
Methods and apparatus for three-dimensional inversion of electromagnetic data
|
|
US8099267B2
(en)
*
|
2008-01-11 |
2012-01-17 |
Schlumberger Technology Corporation |
Input deck migrator for simulators
|
|
US9074454B2
(en)
*
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
|
BRPI0908036A2
(pt)
*
|
2008-02-05 |
2015-08-04 |
Logined Bv |
Método de integrar dados de campo, sistema para integrar dados de campo, e meio legível por computador que armazena instruções para integrar dados de campo
|
|
US8155942B2
(en)
*
|
2008-02-21 |
2012-04-10 |
Chevron U.S.A. Inc. |
System and method for efficient well placement optimization
|
|
US8560969B2
(en)
*
|
2008-06-26 |
2013-10-15 |
Landmark Graphics Corporation |
Systems and methods for imaging operations data in a three-dimensional image
|
|
US8499829B2
(en)
*
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
|
US8280709B2
(en)
*
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
|
US9228415B2
(en)
*
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
|
GB2478213B
(en)
|
2008-11-03 |
2012-04-18 |
Schlumberger Holdings |
Methods and apparatus for planning and dynamically updating sampling operations while drilling in a subterranean formation
|
|
US8849623B2
(en)
*
|
2008-12-16 |
2014-09-30 |
Exxonmobil Upstream Research Company |
Systems and methods for reservoir development and management optimization
|
|
AU2009341851B2
(en)
|
2009-03-11 |
2015-07-16 |
Exxonmobil Upstream Research Company |
Gradient-based workflows for conditioning of process-based geologic models
|
|
WO2010104537A1
(en)
*
|
2009-03-11 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Adjoint-based conditioning of process-based geologic models
|
|
CA2753544A1
(en)
*
|
2009-03-27 |
2010-09-30 |
Exxonmobil Upstream Research Company |
Reservoir quality characterization using heterogeneity equations with spatially-varying parameters
|
|
US8600717B2
(en)
|
2009-05-14 |
2013-12-03 |
Schlumberger Technology Corporation |
Production optimization for oilfields using a mixed-integer nonlinear programming model
|
|
US20120130696A1
(en)
*
|
2009-08-12 |
2012-05-24 |
Exxonmobil Upstream Research Company |
Optimizing Well Management Policy
|
|
WO2011043862A1
(en)
*
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
|
EP2499567A4
(en)
*
|
2009-11-12 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Method and apparatus for reservoir modeling and simulation
|
|
US20110225097A1
(en)
*
|
2009-11-23 |
2011-09-15 |
The University Of Manchester |
Method and apparatus for valuation of a resource
|
|
CA2776764A1
(en)
|
2009-11-30 |
2011-06-03 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
|
US8568320B2
(en)
*
|
2010-03-01 |
2013-10-29 |
Uti Limited Partnership |
System and method for using orthogonally-coded active source signals for reflected signal analysis
|
|
US9134454B2
(en)
|
2010-04-30 |
2015-09-15 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
CA2803068C
(en)
|
2010-07-29 |
2016-10-11 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
CA2807300C
(en)
*
|
2010-09-20 |
2017-01-03 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
US9031674B2
(en)
*
|
2010-10-13 |
2015-05-12 |
Schlumberger Technology Corporation |
Lift-gas optimization with choke control
|
|
US8437999B2
(en)
*
|
2011-02-08 |
2013-05-07 |
Saudi Arabian Oil Company |
Seismic-scale reservoir simulation of giant subsurface reservoirs using GPU-accelerated linear equation systems
|
|
WO2013039606A1
(en)
|
2011-09-15 |
2013-03-21 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
|
AU2013324162B2
(en)
|
2012-09-28 |
2018-08-09 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
US20140222403A1
(en)
*
|
2013-02-07 |
2014-08-07 |
Schlumberger Technology Corporation |
Geologic model via implicit function
|
|
CA2948667A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
|
US10184320B2
(en)
|
2014-09-02 |
2019-01-22 |
Saudi Arabian Oil Company |
Systems, methods, and computer medium to enhance hydrocarbon reservoir simulation
|
|
EP3213126A1
(en)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
US11409023B2
(en)
|
2014-10-31 |
2022-08-09 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space using moving least squares
|
|
US10280722B2
(en)
|
2015-06-02 |
2019-05-07 |
Baker Hughes, A Ge Company, Llc |
System and method for real-time monitoring and estimation of intelligent well system production performance
|
|
CA2994529A1
(en)
*
|
2015-09-04 |
2017-03-09 |
Halliburton Energy Services, Inc. |
Time-to-finish simulation forecaster
|
|
CA3043231C
(en)
|
2016-12-23 |
2022-06-14 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
|
CN108729911A
(zh)
*
|
2017-04-24 |
2018-11-02 |
通用电气公司 |
用于资源生产系统的优化装置、系统和方法
|
|
US11486235B2
(en)
*
|
2017-05-16 |
2022-11-01 |
Bp Corporation North America Inc. |
Tools for selecting and sequencing operating parameter changes to control a hydrocarbon production system
|
|
US11755795B2
(en)
*
|
2017-09-22 |
2023-09-12 |
ExxonMobil Technology and Engineering Company |
Detecting and mitigating flow instabilities in hydrocarbon production wells
|
|
CN109763809B
(zh)
*
|
2017-11-01 |
2022-05-03 |
中国石油化工股份有限公司 |
一种优化水平井分段液流控制完井段内参数的方法
|
|
NO20210770A1
(en)
|
2019-03-05 |
2021-06-11 |
Landmark Graphics Corp |
Reservoir Simulation Systems And Methods To Dynamically Improve Performance Of Reservoir Simulations
|
|
US11401786B2
(en)
*
|
2019-03-06 |
2022-08-02 |
Saudi Arabian Oil Company |
Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development
|
|
WO2020185809A1
(en)
|
2019-03-11 |
2020-09-17 |
Schlumberger Technology Corporation |
Formation analysis incorporating identification of immovable and viscous hydrocarbons
|
|
WO2021062753A1
(zh)
*
|
2019-09-30 |
2021-04-08 |
西门子股份公司 |
综合能源系统的仿真方法、装置和计算机可读存储介质
|
|
US20220357713A1
(en)
*
|
2019-09-30 |
2022-11-10 |
Siemens Aktiengesellschaft |
Method and Apparatus for Optimizing Integrated Energy System, and Computer-Readable Storage Medium
|
|
CA3183709A1
(en)
*
|
2020-05-15 |
2021-11-18 |
Schlumberger Canada Limited |
Stability check for thermal compositional simulation
|
|
CN112580861B
(zh)
*
|
2020-12-11 |
2022-11-01 |
西南石油大学 |
一种针对非常规油气藏生产优化问题的控制方法及系统
|
|
US20230313647A1
(en)
*
|
2022-03-31 |
2023-10-05 |
Halliburton Energy Services, Inc. |
Methods to dynamically control fluid flow in a multi-well system, methods to dynamically provide real-time status of fluid flow in a multi-well system, and multi-well fluid flow control systems
|
|
CN115358167B
(zh)
*
|
2022-08-30 |
2023-03-28 |
西北工业大学 |
一种考虑发动机参数的飞发一体气动伴随优化设计方法
|