|
US6799637B2
(en)
|
2000-10-20 |
2004-10-05 |
Schlumberger Technology Corporation |
Expandable tubing and method
|
|
US6789621B2
(en)
*
|
2000-08-03 |
2004-09-14 |
Schlumberger Technology Corporation |
Intelligent well system and method
|
|
US7222676B2
(en)
*
|
2000-12-07 |
2007-05-29 |
Schlumberger Technology Corporation |
Well communication system
|
|
NO335594B1
(no)
*
|
2001-01-16 |
2015-01-12 |
Halliburton Energy Serv Inc |
Ekspanderbare anordninger og fremgangsmåte for disse
|
|
US20020148610A1
(en)
*
|
2001-04-02 |
2002-10-17 |
Terry Bussear |
Intelligent well sand control
|
|
US6932161B2
(en)
|
2001-09-26 |
2005-08-23 |
Weatherford/Lams, Inc. |
Profiled encapsulation for use with instrumented expandable tubular completions
|
|
US6877553B2
(en)
*
|
2001-09-26 |
2005-04-12 |
Weatherford/Lamb, Inc. |
Profiled recess for instrumented expandable components
|
|
US6899176B2
(en)
*
|
2002-01-25 |
2005-05-31 |
Halliburton Energy Services, Inc. |
Sand control screen assembly and treatment method using the same
|
|
US7096945B2
(en)
*
|
2002-01-25 |
2006-08-29 |
Halliburton Energy Services, Inc. |
Sand control screen assembly and treatment method using the same
|
|
US7055598B2
(en)
*
|
2002-08-26 |
2006-06-06 |
Halliburton Energy Services, Inc. |
Fluid flow control device and method for use of same
|
|
DE10239863B4
(de)
*
|
2002-08-29 |
2005-03-17 |
Webasto Ag |
Fahrzeugdach mit einem über die Dachhaut nach hinten verschiebbaren Deckel
|
|
NO316288B1
(no)
*
|
2002-10-25 |
2004-01-05 |
Reslink As |
Brönnpakning for en rörstreng og en fremgangsmåte for å före en ledning forbi brönnpakningen
|
|
CA2511826C
(en)
*
|
2002-12-26 |
2008-07-22 |
Baker Hughes Incorporated |
Alternative packer setting method
|
|
US6886634B2
(en)
*
|
2003-01-15 |
2005-05-03 |
Halliburton Energy Services, Inc. |
Sand control screen assembly having an internal isolation member and treatment method using the same
|
|
US6857476B2
(en)
*
|
2003-01-15 |
2005-02-22 |
Halliburton Energy Services, Inc. |
Sand control screen assembly having an internal seal element and treatment method using the same
|
|
US6978840B2
(en)
|
2003-02-05 |
2005-12-27 |
Halliburton Energy Services, Inc. |
Well screen assembly and system with controllable variable flow area and method of using same for oil well fluid production
|
|
US7870898B2
(en)
*
|
2003-03-31 |
2011-01-18 |
Exxonmobil Upstream Research Company |
Well flow control systems and methods
|
|
US6994170B2
(en)
*
|
2003-05-29 |
2006-02-07 |
Halliburton Energy Services, Inc. |
Expandable sand control screen assembly having fluid flow control capabilities and method for use of same
|
|
US7363981B2
(en)
*
|
2003-12-30 |
2008-04-29 |
Weatherford/Lamb, Inc. |
Seal stack for sliding sleeve
|
|
US20050175519A1
(en)
*
|
2004-02-06 |
2005-08-11 |
Rogers William A.Jr. |
Microchannel compression reactor
|
|
US7228900B2
(en)
*
|
2004-06-15 |
2007-06-12 |
Halliburton Energy Services, Inc. |
System and method for determining downhole conditions
|
|
US7721801B2
(en)
*
|
2004-08-19 |
2010-05-25 |
Schlumberger Technology Corporation |
Conveyance device and method of use in gravel pack operation
|
|
US7191833B2
(en)
*
|
2004-08-24 |
2007-03-20 |
Halliburton Energy Services, Inc. |
Sand control screen assembly having fluid loss control capability and method for use of same
|
|
US7367395B2
(en)
|
2004-09-22 |
2008-05-06 |
Halliburton Energy Services, Inc. |
Sand control completion having smart well capability and method for use of same
|
|
RU2300668C2
(ru)
*
|
2004-12-27 |
2007-06-10 |
Махир Зафар оглы Шарифов |
Насосная установка шарифова для эксплуатации скважины (варианты)
|
|
US7870909B2
(en)
*
|
2005-06-09 |
2011-01-18 |
Schlumberger Technology Corporation |
Deployable zonal isolation system
|
|
US7441605B2
(en)
*
|
2005-07-13 |
2008-10-28 |
Baker Hughes Incorporated |
Optical sensor use in alternate path gravel packing with integral zonal isolation
|
|
US7377327B2
(en)
*
|
2005-07-14 |
2008-05-27 |
Weatherford/Lamb, Inc. |
Variable choke valve
|
|
AU2006284981B2
(en)
*
|
2005-08-30 |
2011-09-08 |
Baker Hughes Incorporated |
A method for gravel or frac packing in a wellbore and for monitoring the packing process
|
|
CN101326340B
(zh)
*
|
2005-12-19 |
2012-10-31 |
埃克森美孚上游研究公司 |
一种与烃的生产有关的系统和方法
|
|
US7896070B2
(en)
*
|
2006-03-30 |
2011-03-01 |
Schlumberger Technology Corporation |
Providing an expandable sealing element having a slot to receive a sensor array
|
|
US7712524B2
(en)
*
|
2006-03-30 |
2010-05-11 |
Schlumberger Technology Corporation |
Measuring a characteristic of a well proximate a region to be gravel packed
|
|
US7735555B2
(en)
*
|
2006-03-30 |
2010-06-15 |
Schlumberger Technology Corporation |
Completion system having a sand control assembly, an inductive coupler, and a sensor proximate to the sand control assembly
|
|
US8056619B2
(en)
|
2006-03-30 |
2011-11-15 |
Schlumberger Technology Corporation |
Aligning inductive couplers in a well
|
|
US7793718B2
(en)
*
|
2006-03-30 |
2010-09-14 |
Schlumberger Technology Corporation |
Communicating electrical energy with an electrical device in a well
|
|
EP2007968A4
(en)
*
|
2006-04-03 |
2015-12-23 |
Exxonmobil Upstream Res Co |
DRILLING METHOD AND DEVICE FOR SANDING AND INFLUENCE CONTROL DURING BOHROPERATIONS
|
|
US7510011B2
(en)
*
|
2006-07-06 |
2009-03-31 |
Schlumberger Technology Corporation |
Well servicing methods and systems employing a triggerable filter medium sealing composition
|
|
US20090173493A1
(en)
*
|
2006-08-03 |
2009-07-09 |
Remi Hutin |
Interface and method for transmitting information to and from a downhole tool
|
|
MX2009003995A
(es)
|
2006-11-15 |
2009-07-10 |
Exxonmobil Upstream Res Co |
Metodo y aparato de perforacion de pozos para completacion, produccion e inyeccion.
|
|
US8056628B2
(en)
*
|
2006-12-04 |
2011-11-15 |
Schlumberger Technology Corporation |
System and method for facilitating downhole operations
|
|
US8245782B2
(en)
*
|
2007-01-07 |
2012-08-21 |
Schlumberger Technology Corporation |
Tool and method of performing rigless sand control in multiple zones
|
|
US7828056B2
(en)
*
|
2007-07-06 |
2010-11-09 |
Schlumberger Technology Corporation |
Method and apparatus for connecting shunt tubes to sand screen assemblies
|
|
US7950454B2
(en)
*
|
2007-07-23 |
2011-05-31 |
Schlumberger Technology Corporation |
Technique and system for completing a well
|
|
US7823636B2
(en)
*
|
2007-09-10 |
2010-11-02 |
Schlumberger Technology Corporation |
Packer
|
|
US8511380B2
(en)
*
|
2007-10-10 |
2013-08-20 |
Schlumberger Technology Corporation |
Multi-zone gravel pack system with pipe coupling and integrated valve
|
|
US7866414B2
(en)
*
|
2007-12-12 |
2011-01-11 |
Schlumberger Technology Corporation |
Active integrated well completion method and system
|
|
RU2365744C1
(ru)
*
|
2008-01-09 |
2009-08-27 |
Василий Александрович Леонов |
Способ одновременно-раздельной добычи углеводородов электропогружным насосом и установка для его реализации (варианты)
|
|
US7721810B2
(en)
*
|
2008-01-24 |
2010-05-25 |
Baker Hughes Incorporated |
Large inside diameter completion with position indication
|
|
US20100013663A1
(en)
|
2008-07-16 |
2010-01-21 |
Halliburton Energy Services, Inc. |
Downhole Telemetry System Using an Optically Transmissive Fluid Media and Method for Use of Same
|
|
US8794323B2
(en)
*
|
2008-07-17 |
2014-08-05 |
Bp Corporation North America Inc. |
Completion assembly
|
|
EP2350423B1
(en)
*
|
2008-11-03 |
2017-12-20 |
Exxonmobil Upstream Research Company |
Well flow control systems and methods
|
|
US8496055B2
(en)
*
|
2008-12-30 |
2013-07-30 |
Schlumberger Technology Corporation |
Efficient single trip gravel pack service tool
|
|
US8347968B2
(en)
*
|
2009-01-14 |
2013-01-08 |
Schlumberger Technology Corporation |
Single trip well completion system
|
|
US20100243243A1
(en)
*
|
2009-03-31 |
2010-09-30 |
Schlumberger Technology Corporation |
Active In-Situ Controlled Permanent Downhole Device
|
|
EP2419600B1
(en)
|
2009-04-14 |
2018-12-19 |
Exxonmobil Upstream Research Company |
Systems and methods for providing zonal isolation in wells
|
|
US8267173B2
(en)
*
|
2009-05-20 |
2012-09-18 |
Halliburton Energy Services, Inc. |
Open hole completion apparatus and method for use of same
|
|
US8839850B2
(en)
|
2009-10-07 |
2014-09-23 |
Schlumberger Technology Corporation |
Active integrated completion installation system and method
|
|
MY164284A
(en)
|
2009-11-20 |
2017-11-30 |
Exxonmobil Upstream Res Co |
Open-hole packer for alternate path gravel packing, and method for completing an open-hole wellbore
|
|
WO2011149597A1
(en)
|
2010-05-26 |
2011-12-01 |
Exxonmobil Upstream Research Company |
Assembly and method for multi-zone fracture stimulation of a reservoir using autonomous tubular units
|
|
WO2012027283A1
(en)
*
|
2010-08-23 |
2012-03-01 |
Schlumberger Canada Limited |
Sand control well completion method and apparutus
|
|
US8657010B2
(en)
|
2010-10-26 |
2014-02-25 |
Weatherford/Lamb, Inc. |
Downhole flow device with erosion resistant and pressure assisted metal seal
|
|
CN103261576B
(zh)
|
2010-12-16 |
2016-02-24 |
埃克森美孚上游研究公司 |
更替路径砾石充填的通信模块和完成井筒的方法
|
|
US9303485B2
(en)
|
2010-12-17 |
2016-04-05 |
Exxonmobil Upstream Research Company |
Wellbore apparatus and methods for zonal isolations and flow control
|
|
MX342258B
(es)
|
2010-12-17 |
2016-09-22 |
Exxonmobil Upstream Res Co |
Aparato de sondeo y métodos para completación, producción e inyección de pozos de varias zonas.
|
|
PH12013501059A1
(en)
|
2010-12-17 |
2022-10-24 |
Exxonmobil Upstream Res Co |
Method for automatic control and positioning of autonomous downhole tools
|
|
CN103797211B
(zh)
|
2010-12-17 |
2016-12-14 |
埃克森美孚上游研究公司 |
用于替代流动通道砾石充填的封隔器和用于完成井筒的方法
|
|
SG10201510412SA
(en)
|
2010-12-17 |
2016-01-28 |
Exxonmobil Upstream Res Co |
Autonomous downhole conveyance system
|
|
BR112013013149B1
(pt)
|
2010-12-17 |
2020-10-06 |
Exxonmobil Upstream Research Company |
Junta de ligação para trajetórias de fluxo excêntricas a trajetórias de fluxo concêntricas
|
|
US9181796B2
(en)
|
2011-01-21 |
2015-11-10 |
Schlumberger Technology Corporation |
Downhole sand control apparatus and method with tool position sensor
|
|
US9903192B2
(en)
|
2011-05-23 |
2018-02-27 |
Exxonmobil Upstream Research Company |
Safety system for autonomous downhole tool
|
|
US8869903B2
(en)
*
|
2011-06-30 |
2014-10-28 |
Baker Hughes Incorporated |
Apparatus to remotely actuate valves and method thereof
|
|
US9249559B2
(en)
|
2011-10-04 |
2016-02-02 |
Schlumberger Technology Corporation |
Providing equipment in lateral branches of a well
|
|
MY167992A
(en)
|
2011-10-12 |
2018-10-10 |
Exxonmobil Upstream Res Co |
Fluid filtering device for a wellbore and method for completing a wellbore
|
|
US9644476B2
(en)
|
2012-01-23 |
2017-05-09 |
Schlumberger Technology Corporation |
Structures having cavities containing coupler portions
|
|
US9175560B2
(en)
|
2012-01-26 |
2015-11-03 |
Schlumberger Technology Corporation |
Providing coupler portions along a structure
|
|
US9938823B2
(en)
|
2012-02-15 |
2018-04-10 |
Schlumberger Technology Corporation |
Communicating power and data to a component in a well
|
|
US10036234B2
(en)
|
2012-06-08 |
2018-07-31 |
Schlumberger Technology Corporation |
Lateral wellbore completion apparatus and method
|
|
AU2013335181B2
(en)
|
2012-10-26 |
2016-03-24 |
Exxonmobil Upstream Research Company |
Wellbore apparatus and method for sand control using gravel reserve
|
|
MY170367A
(en)
|
2012-10-26 |
2019-07-24 |
Exxonmobil Upstream Res Co |
Downhole flow control, joint assembly and method
|
|
WO2014077948A1
(en)
|
2012-11-13 |
2014-05-22 |
Exxonmobil Upstream Research Company |
Drag enhancing structures for downhole operations, and systems and methods including the same
|
|
US10030473B2
(en)
|
2012-11-13 |
2018-07-24 |
Exxonmobil Upstream Research Company |
Method for remediating a screen-out during well completion
|
|
BR102014002103A2
(pt)
*
|
2013-01-28 |
2016-03-08 |
Schlumberger Technology Bv |
sistema de completação em manobra única, e método
|
|
US9638013B2
(en)
|
2013-03-15 |
2017-05-02 |
Exxonmobil Upstream Research Company |
Apparatus and methods for well control
|
|
US9725989B2
(en)
|
2013-03-15 |
2017-08-08 |
Exxonmobil Upstream Research Company |
Sand control screen having improved reliability
|
|
US9816361B2
(en)
|
2013-09-16 |
2017-11-14 |
Exxonmobil Upstream Research Company |
Downhole sand control assembly with flow control, and method for completing a wellbore
|
|
US10041332B2
(en)
|
2014-01-13 |
2018-08-07 |
Halliburton Energy Services, Inc. |
Dual isolation well assembly
|
|
US9670756B2
(en)
|
2014-04-08 |
2017-06-06 |
Exxonmobil Upstream Research Company |
Wellbore apparatus and method for sand control using gravel reserve
|
|
US9856720B2
(en)
|
2014-08-21 |
2018-01-02 |
Exxonmobil Upstream Research Company |
Bidirectional flow control device for facilitating stimulation treatments in a subterranean formation
|
|
US9951596B2
(en)
|
2014-10-16 |
2018-04-24 |
Exxonmobil Uptream Research Company |
Sliding sleeve for stimulating a horizontal wellbore, and method for completing a wellbore
|
|
MX2017012425A
(es)
|
2015-04-30 |
2018-01-26 |
Halliburton Energy Services Inc |
Ensamblaje de terminacion inteligente a base de tuberia de revestimiento.
|
|
US10487629B2
(en)
|
2015-04-30 |
2019-11-26 |
Halliburton Energy Services, Inc. |
Remotely-powered casing-based intelligent completion assembly
|
|
US10662762B2
(en)
*
|
2017-11-02 |
2020-05-26 |
Saudi Arabian Oil Company |
Casing system having sensors
|
|
US10724350B2
(en)
|
2017-11-22 |
2020-07-28 |
Exxonmobil Upstream Research Company |
Perforation devices including trajectory-altering structures and methods of utilizing the same
|
|
WO2019103780A1
(en)
|
2017-11-22 |
2019-05-31 |
Exxonmobil Upstream Research Company |
Perforation devices including gas supply structures and methods of utilizing the same
|
|
CN108533234A
(zh)
*
|
2018-06-13 |
2018-09-14 |
邹佳宸 |
水平井不动管柱分段充填及配套工具
|