|
GB2354852B
(en)
*
|
1999-10-01 |
2001-11-28 |
Schlumberger Holdings |
Method for updating an earth model using measurements gathered during borehole construction
|
|
US6826486B1
(en)
|
2000-02-11 |
2004-11-30 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
|
|
WO2001071455A2
(en)
*
|
2000-03-17 |
2001-09-27 |
Optim, L.L.C. |
Optimization apparatus, system, and method of use doing business
|
|
US7035790B2
(en)
*
|
2000-06-02 |
2006-04-25 |
Canon Kabushiki Kaisha |
Speech processing system
|
|
US6954745B2
(en)
*
|
2000-06-02 |
2005-10-11 |
Canon Kabushiki Kaisha |
Signal processing system
|
|
US20020026253A1
(en)
*
|
2000-06-02 |
2002-02-28 |
Rajan Jebu Jacob |
Speech processing apparatus
|
|
US7072833B2
(en)
*
|
2000-06-02 |
2006-07-04 |
Canon Kabushiki Kaisha |
Speech processing system
|
|
US7010483B2
(en)
*
|
2000-06-02 |
2006-03-07 |
Canon Kabushiki Kaisha |
Speech processing system
|
|
US7003439B2
(en)
|
2001-01-30 |
2006-02-21 |
Schlumberger Technology Corporation |
Interactive method for real-time displaying, querying and forecasting drilling event and hazard information
|
|
US7526413B2
(en)
*
|
2001-01-31 |
2009-04-28 |
Exxonmobil Upstream Research Company |
Volumetric laminated sand analysis
|
|
FR2823877B1
(fr)
*
|
2001-04-19 |
2004-12-24 |
Inst Francais Du Petrole |
Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol
|
|
US6581198B1
(en)
|
2001-06-13 |
2003-06-17 |
Cadence Design Systems, Inc. |
Method and arrangement for extracting capacitance in integrated circuits having non Manhattan wiring
|
|
US6892366B1
(en)
*
|
2001-08-28 |
2005-05-10 |
Cadence Design Systems, Inc. |
Method and apparatus for performing extraction using a model trained with Bayesian inference via a Monte Carlo method
|
|
US7051293B1
(en)
|
2001-08-28 |
2006-05-23 |
Cadence Design Systems, Inc. |
Method and apparatus for creating an extraction model
|
|
US7103524B1
(en)
|
2001-08-28 |
2006-09-05 |
Cadence Design Systems, Inc. |
Method and apparatus for creating an extraction model using Bayesian inference implemented with the Hybrid Monte Carlo method
|
|
GB0125713D0
(en)
|
2001-10-26 |
2001-12-19 |
Statoil Asa |
Method of combining spatial models
|
|
US7114138B1
(en)
|
2002-01-31 |
2006-09-26 |
Cadence Design Systems, Inc. |
Method and apparatus for extracting resistance from an integrated circuit design
|
|
FR2837947B1
(fr)
*
|
2002-04-02 |
2004-05-28 |
Inst Francais Du Petrole |
Methode pour quantifier les incertitudes liees a des parametres continus et discrets descriptifs d'un milieu par construction de plans d'experiences et analyse statistique
|
|
CA2482457A1
(en)
*
|
2002-04-10 |
2004-03-18 |
Schlumberger Technology Corporation |
Method, apparatus and system for pore pressure prediction in presence of dipping formations
|
|
US7899657B2
(en)
|
2003-01-24 |
2011-03-01 |
Rockwell Automoation Technologies, Inc. |
Modeling in-situ reservoirs with derivative constraints
|
|
US6810332B2
(en)
*
|
2003-01-31 |
2004-10-26 |
Chevron U.S.A. Inc. |
Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
|
|
MXPA04003024A
(es)
*
|
2003-04-03 |
2004-10-06 |
Schlumberger Technology Bv |
Metodos y aparato para predecir presiones de poro y fractura de una formacion subsuperficial.
|
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
|
US20050004833A1
(en)
*
|
2003-07-03 |
2005-01-06 |
Reaction Design, Llc |
Method and system for integrated uncertainty analysis
|
|
WO2005008379A2
(en)
*
|
2003-07-03 |
2005-01-27 |
Reaction Design |
Method and system for integrated uncertainty analysis
|
|
US20050004969A1
(en)
*
|
2003-07-03 |
2005-01-06 |
Reaction Design, Llc |
System for information exchange for integration of multiple data sources
|
|
US7286214B2
(en)
*
|
2003-08-25 |
2007-10-23 |
University Of South Florida |
Method and program product for determining a radiance field in an optical environment
|
|
NL1024444C2
(nl)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur.
|
|
GB2410550B8
(en)
*
|
2003-12-04 |
2008-10-01 |
Schlumberger Holdings |
Fluids chain-of-custody
|
|
US7379819B2
(en)
*
|
2003-12-04 |
2008-05-27 |
Schlumberger Technology Corporation |
Reservoir sample chain-of-custody
|
|
WO2005071222A1
(en)
*
|
2004-01-20 |
2005-08-04 |
Saudi Arabian Oil Company |
Real time earth model for collaborative geosteering
|
|
CN1898640A
(zh)
*
|
2004-01-30 |
2007-01-17 |
埃克森美孚上游研究公司 |
储层评价方法
|
|
CN1898675A
(zh)
*
|
2004-01-30 |
2007-01-17 |
埃克森美孚上游研究公司 |
储层模型建立方法
|
|
US20050171700A1
(en)
*
|
2004-01-30 |
2005-08-04 |
Chroma Energy, Inc. |
Device and system for calculating 3D seismic classification features and process for geoprospecting material seams
|
|
US7054750B2
(en)
*
|
2004-03-04 |
2006-05-30 |
Halliburton Energy Services, Inc. |
Method and system to model, measure, recalibrate, and optimize control of the drilling of a borehole
|
|
CN1299127C
(zh)
*
|
2004-03-26 |
2007-02-07 |
中国石油天然气集团公司 |
地震观测系统优化设计的层状介质双聚焦方法及其应用
|
|
CA2572981A1
(en)
*
|
2004-07-07 |
2006-10-26 |
Exxonmobil Upstream Research Company |
Bayesian network applications to geology and geophysics
|
|
AU2005272112B2
(en)
*
|
2004-07-07 |
2010-04-22 |
Exxonmobil Upstream Research Company |
Predicting sand-grain composition and sand texture
|
|
US20060025969A1
(en)
*
|
2004-07-30 |
2006-02-02 |
Conocophillips Company |
Method for converting a geologic panel into a simulator format
|
|
FR2874706B1
(fr)
|
2004-08-30 |
2006-12-01 |
Inst Francais Du Petrole |
Methode de modelisation de la production d'un gisement petrolier
|
|
US7761237B2
(en)
*
|
2004-11-18 |
2010-07-20 |
Exxonmobil Upstream Research Co. |
Method for quantification and mitigation for dip-induced azimuthal AVO
|
|
US8209202B2
(en)
|
2005-04-29 |
2012-06-26 |
Landmark Graphics Corporation |
Analysis of multiple assets in view of uncertainties
|
|
FR2886740B1
(fr)
*
|
2005-06-03 |
2007-09-28 |
Inst Francais Du Petrole |
Methode pour mettre a jour un modele geologique par des donnees sismiques et de production
|
|
WO2007018862A2
(en)
*
|
2005-07-27 |
2007-02-15 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
|
US8301425B2
(en)
|
2005-07-27 |
2012-10-30 |
Exxonmobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
|
CN101233526B
(zh)
*
|
2005-07-27 |
2012-07-04 |
埃克森美孚上游研究公司 |
与从地下岩层抽取碳氢化合物相关的井建模
|
|
GB0524134D0
(en)
*
|
2005-11-26 |
2006-01-04 |
Univ Edinburgh |
Improvements in and relating to hydrocarbon recovery from a hydrocarbon reservoir
|
|
US7366616B2
(en)
*
|
2006-01-13 |
2008-04-29 |
Schlumberger Technology Corporation |
Computer-based method for while-drilling modeling and visualization of layered subterranean earth formations
|
|
US7486589B2
(en)
|
2006-02-09 |
2009-02-03 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting the hydrocarbon production of a well location
|
|
CN101681394B
(zh)
*
|
2006-09-28 |
2012-11-21 |
埃克森美孚上游研究公司 |
来自并发地球物理源的数据的迭代反演
|
|
US8700370B2
(en)
*
|
2006-12-28 |
2014-04-15 |
Chevron U.S.A. Inc. |
Method, system and program storage device for history matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions
|
|
US7467044B2
(en)
*
|
2007-01-15 |
2008-12-16 |
Chevron U.S.A. Inc |
Method and system for assessing exploration prospect risk and uncertainty
|
|
US7636275B2
(en)
*
|
2007-02-06 |
2009-12-22 |
Conocophillips Company |
Direct time lapse inversion of seismic data
|
|
US7529624B2
(en)
*
|
2007-02-21 |
2009-05-05 |
Geomechanics International, Inc. |
Method and apparatus for remote characterization of faults in the vicinity of boreholes
|
|
CA2690992C
(en)
*
|
2007-08-24 |
2014-07-29 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
|
WO2009029133A1
(en)
*
|
2007-08-24 |
2009-03-05 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
CA2705319C
(en)
*
|
2007-11-10 |
2019-01-15 |
Laurence Reid |
Systems and methods for workflow automation, adaptation and integration
|
|
US7886844B2
(en)
*
|
2007-11-12 |
2011-02-15 |
Schlumberger Technology Corporation |
Borehole survey method and apparatus
|
|
GB0722469D0
(en)
*
|
2007-11-16 |
2007-12-27 |
Statoil Asa |
Forming a geological model
|
|
FR2923855B1
(fr)
*
|
2007-11-21 |
2009-12-11 |
Inst Francais Du Petrole |
Methode pour optimiser la trajectoire d'un forage par mise a jour d'une interpretation structurale.
|
|
AU2008335609B2
(en)
*
|
2007-12-12 |
2013-07-18 |
Exxonmobil Upstream Research Company |
Method and apparatus for evaluating submarine formations
|
|
US9638830B2
(en)
|
2007-12-14 |
2017-05-02 |
Westerngeco L.L.C. |
Optimizing drilling operations using petrotechnical data
|
|
US8417497B2
(en)
*
|
2008-01-18 |
2013-04-09 |
Westerngeco L.L.C. |
Updating a model of a subterranean structure using decomposition
|
|
US7869955B2
(en)
*
|
2008-01-30 |
2011-01-11 |
Chevron U.S.A. Inc. |
Subsurface prediction method and system
|
|
ES2651923T3
(es)
*
|
2008-03-21 |
2018-01-30 |
Exxonmobil Upstream Research Company |
Un método eficiente para la inversión de datos geofísicos
|
|
US8793111B2
(en)
*
|
2009-01-20 |
2014-07-29 |
Schlumberger Technology Corporation |
Automated field development planning
|
|
US8527248B2
(en)
*
|
2008-04-18 |
2013-09-03 |
Westerngeco L.L.C. |
System and method for performing an adaptive drilling operation
|
|
WO2009137181A1
(en)
*
|
2008-05-05 |
2009-11-12 |
Exxonmobil Upstream Research Company |
Modeling dynamic systems by visualizing and narrowing a parameter space
|
|
US8527203B2
(en)
|
2008-05-27 |
2013-09-03 |
Schlumberger Technology Corporation |
Method for selecting well measurements
|
|
US8577613B2
(en)
*
|
2008-07-01 |
2013-11-05 |
Schlumberger Technology Corporation |
Effective hydrocarbon reservoir exploration decision making
|
|
CN102112894B
(zh)
*
|
2008-08-11 |
2015-03-25 |
埃克森美孚上游研究公司 |
用地震表面波的波形评估土壤性质
|
|
CA2993073C
(en)
*
|
2008-10-14 |
2020-06-02 |
Schlumberger Canada Limited |
System and method for online automation
|
|
AU2009311619B2
(en)
*
|
2008-11-06 |
2015-10-01 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
|
US8849623B2
(en)
*
|
2008-12-16 |
2014-09-30 |
Exxonmobil Upstream Research Company |
Systems and methods for reservoir development and management optimization
|
|
ES2847600T3
(es)
*
|
2008-12-18 |
2021-08-03 |
Exxonmobil Upstream Res Co |
Transporte de sedimentos por flujos turbulentos completamente desarrollados
|
|
BRPI1006862B1
(pt)
|
2009-01-13 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos
|
|
GB0905261D0
(en)
*
|
2009-03-27 |
2009-05-13 |
Geco Technology Bv |
Processing seismic data
|
|
US20100257004A1
(en)
*
|
2009-04-01 |
2010-10-07 |
Chervon U.S.A. Inc. |
Method and system for conducting geologic basin analysis
|
|
US8341984B2
(en)
*
|
2009-05-27 |
2013-01-01 |
Westerngeco L.L.C. |
Estimating velocities with uncertainty
|
|
US8494827B2
(en)
*
|
2009-09-25 |
2013-07-23 |
Exxonmobil Upstream Research Company |
Method of predicting natural fractures and damage in a subsurface region
|
|
NO20101371A1
(no)
*
|
2009-10-05 |
2011-04-06 |
Logined Bv |
Fremgangsmate, system og apparat for modellering av usikkerhet i produksjonssystemnettverk
|
|
US8234073B2
(en)
*
|
2009-10-23 |
2012-07-31 |
Chevron U.S.A. Inc. |
System and method for estimating geological architecture of a geologic volume
|
|
US20110098996A1
(en)
*
|
2009-10-26 |
2011-04-28 |
David Nichols |
Sifting Models of a Subsurface Structure
|
|
CA2777346C
(en)
*
|
2009-11-18 |
2017-01-10 |
Conocophillips Company |
Attribute importance measure for parametric multivariate modeling
|
|
US9260947B2
(en)
|
2009-11-30 |
2016-02-16 |
Exxonmobil Upstream Research Company |
Adaptive Newton's method for reservoir simulation
|
|
WO2011097055A2
(en)
*
|
2010-02-02 |
2011-08-11 |
Conocophillips Company |
Multilevel percolation aggregation solver for petroleum reservoir simulations
|
|
WO2011096964A1
(en)
|
2010-02-03 |
2011-08-11 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
|
US8537638B2
(en)
*
|
2010-02-10 |
2013-09-17 |
Exxonmobil Upstream Research Company |
Methods for subsurface parameter estimation in full wavefield inversion and reverse-time migration
|
|
BR112012017275A2
(pt)
|
2010-02-12 |
2016-04-19 |
Exxonmobil Upstream Res Co |
método e sistema para divisão de modelos de simulação paralelos
|
|
EP2545461A4
(en)
|
2010-03-12 |
2017-09-27 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
|
US8223587B2
(en)
*
|
2010-03-29 |
2012-07-17 |
Exxonmobil Upstream Research Company |
Full wavefield inversion using time varying filters
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US8694299B2
(en)
|
2010-05-07 |
2014-04-08 |
Exxonmobil Upstream Research Company |
Artifact reduction in iterative inversion of geophysical data
|
|
US8756042B2
(en)
|
2010-05-19 |
2014-06-17 |
Exxonmobile Upstream Research Company |
Method and system for checkpointing during simulations
|
|
EP2599023B1
(en)
|
2010-07-29 |
2019-10-23 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
|
EP2599029A4
(en)
|
2010-07-29 |
2014-01-08 |
Exxonmobil Upstream Res Co |
METHODS AND SYSTEMS FOR AUTOMATIC LEARNING FLOW SIMULATION
|
|
EP2599032A4
(en)
|
2010-07-29 |
2018-01-17 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
US8767508B2
(en)
|
2010-08-18 |
2014-07-01 |
Exxonmobil Upstream Research Company |
Using seismic P and S arrivals to determine shallow velocity structure
|
|
US8855986B2
(en)
|
2010-09-03 |
2014-10-07 |
Chevron U.S.A. Inc. |
Iterative method and system to construct robust proxy models for reservoir simulation
|
|
CA2807300C
(en)
|
2010-09-20 |
2017-01-03 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
US8437998B2
(en)
|
2010-09-27 |
2013-05-07 |
Exxonmobil Upstream Research Company |
Hybrid method for full waveform inversion using simultaneous and sequential source method
|
|
WO2012047378A1
(en)
|
2010-09-27 |
2012-04-12 |
Exxonmobil Upstream Research Company |
Simultaneous source encoding and source separation as a practical solution for full wavefield inversion
|
|
AU2011332274B2
(en)
|
2010-11-23 |
2017-02-23 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
|
WO2012074592A1
(en)
|
2010-12-01 |
2012-06-07 |
Exxonmobil Upstream Research Company |
Simultaneous source inversion for marine streamer data with cross-correlation objective function
|
|
MX2013006752A
(es)
*
|
2010-12-16 |
2013-12-06 |
Landmark Graphics Corp |
Metodo y sistema para graficar informacion correlacionada.
|
|
GB201022128D0
(en)
|
2010-12-31 |
2011-02-02 |
Foster Findlay Ass Ltd |
Active contour segmentation
|
|
EA201391035A1
(ru)
*
|
2011-01-13 |
2013-12-30 |
Лэндмарк Графикс Корпорейшн |
Способ и система для обновления геоячеечной модели
|
|
CA2823017A1
(en)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
|
US9146330B2
(en)
*
|
2011-03-29 |
2015-09-29 |
Westerngeco L.L.C. |
Selecting a survey setting for characterizing a target structure
|
|
KR101931488B1
(ko)
|
2011-03-30 |
2018-12-24 |
엑손모빌 업스트림 리서치 캄파니 |
스펙트럼 성형을 이용하는 전 파동장 반전의 수렴 레이트
|
|
SG193233A1
(en)
|
2011-03-31 |
2013-10-30 |
Exxonmobil Upstream Res Co |
Method of wavelet estimation and multiple prediction in full wavefield inversion
|
|
US8902221B2
(en)
*
|
2011-06-10 |
2014-12-02 |
Schlumberger Technology Corporation |
Prospect assessment and play chance mapping tools
|
|
US8749549B2
(en)
*
|
2011-06-10 |
2014-06-10 |
Schlumberger Technology Corporation |
Prospect assessment and play chance mapping tools
|
|
US9846256B2
(en)
|
2011-08-09 |
2017-12-19 |
Schlumberger Technology Corporation |
Interactive display of results obtained from the inversion of logging data
|
|
US8694262B2
(en)
*
|
2011-08-15 |
2014-04-08 |
Chevron U.S.A. Inc. |
System and method for subsurface characterization including uncertainty estimation
|
|
ES2640824T3
(es)
|
2011-09-02 |
2017-11-06 |
Exxonmobil Upstream Research Company |
Utilización de la proyección sobre conjuntos convexos para limitar la inversión del campo de onda completa
|
|
US9489176B2
(en)
|
2011-09-15 |
2016-11-08 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform EOS calculations
|
|
RU2014120155A
(ru)
*
|
2011-10-20 |
2015-11-27 |
Шлюмбергер Текнолоджи Б.В. |
Оптимизация модели с несколькими периодами для экономического оценивания регуляторов расхода
|
|
US20130223187A1
(en)
*
|
2011-11-11 |
2013-08-29 |
International Geophysical Company, Inc. |
Geological Structure Contour Modeling and Imaging
|
|
US9176930B2
(en)
*
|
2011-11-29 |
2015-11-03 |
Exxonmobil Upstream Research Company |
Methods for approximating hessian times vector operation in full wavefield inversion
|
|
US10030499B2
(en)
|
2011-12-06 |
2018-07-24 |
Bp Corporation North America Inc. |
Geological monitoring console
|
|
SG11201404094RA
(en)
|
2012-03-08 |
2014-10-30 |
Exxonmobil Upstream Res Co |
Orthogonal source and receiver encoding
|
|
WO2013148900A1
(en)
*
|
2012-03-28 |
2013-10-03 |
Geco Technology B.V. |
Providing an objective function based on variation in predicted data
|
|
US20130261981A1
(en)
*
|
2012-04-03 |
2013-10-03 |
Westerngeco L.L.C. |
Covariance estimation using sparse wavelet representation
|
|
US9595129B2
(en)
|
2012-05-08 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Canvas control for 3D data volume processing
|
|
NO342738B1
(no)
*
|
2012-12-06 |
2018-08-06 |
Roxar Software Solutions As |
Fremgangsmåte og et system for å presentere seismisk informasjon
|
|
US20130341093A1
(en)
*
|
2012-06-21 |
2013-12-26 |
Stuart Inglis Jardine |
Drilling risk avoidance
|
|
EP2877690B1
(en)
|
2012-08-10 |
2023-03-01 |
Halliburton Energy Services Inc. |
Methods and systems for borehole image forward modeling of formation properties
|
|
US10036829B2
(en)
|
2012-09-28 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
CN102937724B
(zh)
*
|
2012-11-20 |
2016-06-08 |
中国神华能源股份有限公司 |
一种露天煤矿采场底部岩层的探测方法
|
|
CA2892041C
(en)
|
2012-11-28 |
2018-02-27 |
Exxonmobil Upstream Research Company |
Reflection seismic data q tomography
|
|
NO20121473A1
(no)
*
|
2012-12-06 |
2014-06-09 |
Roxar Software Solutions As |
System for modellering av geologiske strukturer
|
|
US9575205B2
(en)
*
|
2013-01-17 |
2017-02-21 |
Pgs Geophysical As |
Uncertainty-based frequency-selected inversion of electromagnetic geophysical data
|
|
WO2014134655A1
(en)
*
|
2013-03-05 |
2014-09-12 |
Technological Resources Pty Ltd |
Estimating material properties
|
|
US20140257700A1
(en)
*
|
2013-03-08 |
2014-09-11 |
The Government Of The United States Of America, As Represented By The Secretary Of The Navy |
System and method for estimating uncertainty for geophysical gridding routines lacking inherent uncertainty estimation
|
|
MX353907B
(es)
*
|
2013-04-22 |
2018-02-02 |
Statoil Petroleum As |
Mejoras para determinar la temperatura de la sub-superficie.
|
|
MX346526B
(es)
|
2013-05-24 |
2017-03-23 |
Exxonmobil Upstream Res Co |
Inversión multi-parámetro a través de fwi elástica dependiente de compensación.
|
|
US9746577B2
(en)
|
2013-06-03 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Uncertainty estimation of subsurface resistivity solutions
|
|
US10459117B2
(en)
|
2013-06-03 |
2019-10-29 |
Exxonmobil Upstream Research Company |
Extended subspace method for cross-talk mitigation in multi-parameter inversion
|
|
US10584570B2
(en)
|
2013-06-10 |
2020-03-10 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
|
US9702998B2
(en)
|
2013-07-08 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Full-wavefield inversion of primaries and multiples in marine environment
|
|
ES2671789T3
(es)
|
2013-08-23 |
2018-06-08 |
Exxonmobil Upstream Research Company |
Búsqueda simultánea de fuentes durante la adquisición sísmica y la inversión sísmica
|
|
WO2015026365A1
(en)
*
|
2013-08-23 |
2015-02-26 |
Landmark Graphics Corporation |
Local updating of 3d geocellular model
|
|
US10036818B2
(en)
|
2013-09-06 |
2018-07-31 |
Exxonmobil Upstream Research Company |
Accelerating full wavefield inversion with nonstationary point-spread functions
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
US10400570B2
(en)
*
|
2013-11-13 |
2019-09-03 |
Schlumberger Technology Corporation |
Automatic wellbore condition indicator and manager
|
|
US9910189B2
(en)
|
2014-04-09 |
2018-03-06 |
Exxonmobil Upstream Research Company |
Method for fast line search in frequency domain FWI
|
|
SG11201608175SA
(en)
|
2014-05-09 |
2016-11-29 |
Exxonmobil Upstream Res Co |
Efficient line search methods for multi-parameter full wavefield inversion
|
|
US10185046B2
(en)
|
2014-06-09 |
2019-01-22 |
Exxonmobil Upstream Research Company |
Method for temporal dispersion correction for seismic simulation, RTM and FWI
|
|
MX362753B
(es)
|
2014-06-17 |
2019-02-07 |
Exxonmobil Upstream Res Co |
Inversion rapida de campo de ondas completo viscoacustico y viscoelastico.
|
|
GB2528129A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume
|
|
GB2528130A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method of constraining an inversion in the characterisation of the evolution of a subsurface volume
|
|
US10838092B2
(en)
|
2014-07-24 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Estimating multiple subsurface parameters by cascaded inversion of wavefield components
|
|
US10422899B2
(en)
|
2014-07-30 |
2019-09-24 |
Exxonmobil Upstream Research Company |
Harmonic encoding for FWI
|
|
AU2015298233B2
(en)
|
2014-07-30 |
2018-02-22 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
|
US10386511B2
(en)
|
2014-10-03 |
2019-08-20 |
Exxonmobil Upstream Research Company |
Seismic survey design using full wavefield inversion
|
|
EP3210050A1
(en)
|
2014-10-20 |
2017-08-30 |
Exxonmobil Upstream Research Company |
Velocity tomography using property scans
|
|
WO2016067111A1
(en)
*
|
2014-10-27 |
2016-05-06 |
Cgg Services Sa |
Multi-vintage energy mapping
|
|
US11598195B2
(en)
|
2014-10-27 |
2023-03-07 |
Baker Hughes, A Ge Company, Llc |
Statistical approach to incorporate uncertainties of parameters in simulation results and stability analysis for earth drilling
|
|
EP3213127A1
(en)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
|
AU2015339884B2
(en)
|
2014-10-31 |
2018-03-15 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
AU2015339883B2
(en)
|
2014-10-31 |
2018-03-29 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
|
WO2016099747A1
(en)
|
2014-12-18 |
2016-06-23 |
Exxonmobil Upstream Research Company |
Scalable scheduling of parallel iterative seismic jobs
|
|
US10190406B2
(en)
*
|
2014-12-23 |
2019-01-29 |
Baker Hughes, A Ge Company, Llc |
Formation fracturing potential using surrounding pore pressures
|
|
EP3243089B1
(en)
|
2015-01-06 |
2021-09-22 |
TotalEnergies SE |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume over a period of time
|
|
US10520618B2
(en)
|
2015-02-04 |
2019-12-31 |
ExxohnMobil Upstream Research Company |
Poynting vector minimal reflection boundary conditions
|
|
EP3256886B1
(en)
|
2015-02-13 |
2020-01-29 |
Exxonmobil Upstream Research Company |
Efficient and stable absorbing boundary condition in finite-difference calculations
|
|
KR20170118185A
(ko)
|
2015-02-17 |
2017-10-24 |
엑손모빌 업스트림 리서치 캄파니 |
다중반사파 없는 데이터 세트를 생성하는 다단식 전 파동장 역산 프로세스
|
|
EP3304133A1
(en)
|
2015-06-04 |
2018-04-11 |
Exxonmobil Upstream Research Company |
Method for generating multiple free seismic images
|
|
US10838093B2
(en)
|
2015-07-02 |
2020-11-17 |
Exxonmobil Upstream Research Company |
Krylov-space-based quasi-newton preconditioner for full-wavefield inversion
|
|
US10310113B2
(en)
|
2015-10-02 |
2019-06-04 |
Exxonmobil Upstream Research Company |
Q-compensated full wavefield inversion
|
|
US20170103144A1
(en)
*
|
2015-10-08 |
2017-04-13 |
Schlumbeger Technology Corporation |
Well trajectory adjustment
|
|
MX2018003495A
(es)
|
2015-10-15 |
2018-06-06 |
Exxonmobil Upstream Res Co |
Apilados angulares de dominio de modelo de fwi con conservacion de amplitud.
|
|
FR3043227A1
(no)
*
|
2015-11-04 |
2017-05-05 |
Services Petroliers Schlumberger |
|
|
CN105653808A
(zh)
*
|
2016-01-05 |
2016-06-08 |
成都阳光铝制品有限公司 |
一种基于蒙特卡洛的规定塑性延伸强度不确定度评定方法
|
|
US10768324B2
(en)
|
2016-05-19 |
2020-09-08 |
Exxonmobil Upstream Research Company |
Method to predict pore pressure and seal integrity using full wavefield inversion
|
|
US10605937B2
(en)
*
|
2016-05-26 |
2020-03-31 |
Cgg Services Sas |
Device and method for smart picking surface waves dispersion curves
|
|
GB2556621B
(en)
*
|
2016-09-30 |
2020-03-25 |
Equinor Energy As |
Improved structural modelling
|
|
US11249208B2
(en)
|
2016-10-14 |
2022-02-15 |
Schlumberger Technology Corporation |
Geologic structural model generation
|
|
EP3559401B1
(en)
|
2016-12-23 |
2023-10-18 |
ExxonMobil Technology and Engineering Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
|
US11644589B2
(en)
|
2017-05-23 |
2023-05-09 |
Schlumberger Technology Corporation |
Analogue facilitated seismic data interpretation system
|
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
|
EP3645834B1
(en)
|
2017-06-27 |
2024-04-10 |
Services Pétroliers Schlumberger |
Real-time well construction process inference through probabilistic data fusion
|
|
CN110412530B
(zh)
*
|
2018-04-27 |
2021-09-17 |
深圳市优必选科技有限公司 |
一种识别充电桩的方法、装置及机器人
|
|
US10557345B2
(en)
|
2018-05-21 |
2020-02-11 |
Saudi Arabian Oil Company |
Systems and methods to predict and inhibit broken-out drilling-induced fractures in hydrocarbon wells
|
|
US10753203B2
(en)
|
2018-07-10 |
2020-08-25 |
Saudi Arabian Oil Company |
Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells
|
|
RU2718137C1
(ru)
*
|
2018-12-05 |
2020-03-30 |
Общество с ограниченной ответственностью "Газпромнефть Научно-Технический Центр" (ООО "Газпромнефть НТЦ") |
Способ оценки параметра затухания волнового поля для определения углеводородного насыщения пласта в межскважинном пространстве при построении геологической модели
|
|
WO2020163242A1
(en)
|
2019-02-05 |
2020-08-13 |
Magnetic Variation Services, Llc |
Geosteering methods and systems for improved drilling performance
|
|
WO2020163372A1
(en)
|
2019-02-05 |
2020-08-13 |
Motive Drilling Technologies, Inc. |
Downhole display
|
|
RU2720859C1
(ru)
*
|
2019-05-29 |
2020-05-13 |
Общество с ограниченной ответственностью "Газпром добыча Кузнецк" |
Способ выбора конструкции горизонтальной метаноугольной скважины
|
|
US12247484B2
(en)
|
2019-06-28 |
2025-03-11 |
Schlumberger Technology Corporation |
Field data acquisition and virtual training system
|
|
CN110322563B
(zh)
*
|
2019-07-09 |
2020-11-10 |
吉林大学 |
构建地质模型的补充钻孔选址方法及系统
|
|
US12372683B2
(en)
|
2019-09-04 |
2025-07-29 |
Schlumberger Technology Corporation |
Autonomous operations in oil and gas fields
|
|
US12091960B2
(en)
|
2019-09-04 |
2024-09-17 |
Schlumberger Technology Corporation |
Autonomous wireline operations in oil and gas fields
|
|
US11348218B2
(en)
*
|
2020-03-30 |
2022-05-31 |
Halliburton Energy Services, Inc. |
Hybrid interpretation approach for borehole imaging
|
|
US11572785B2
(en)
|
2021-01-26 |
2023-02-07 |
Saudi Arabian Oil Company |
Drilling uncertainty real time updates for accurate well placement
|
|
WO2022186843A1
(en)
*
|
2021-03-03 |
2022-09-09 |
Landmark Graphics Corporation |
Predicting a drill string packoff event
|
|
EP4330732B1
(en)
*
|
2021-04-30 |
2025-08-20 |
Zed Depth Exploration Data GmbH |
Geophysical data-space mining using a trans-dimensional algorithm
|
|
US12421829B2
(en)
|
2021-09-21 |
2025-09-23 |
Saudi Arabian Oil Company |
Combined carbon dioxide disposal and freshwater production from a saline aquifer
|
|
US20230114935A1
(en)
*
|
2021-10-07 |
2023-04-13 |
Exxonmobil Upstream Research Company |
Method for determining and implementing a data collection program for one or more phases of hydrocarbon extraction based on sequential subsurface uncertainty characterization
|
|
CN114137612B
(zh)
*
|
2021-11-30 |
2024-05-28 |
沈阳建筑大学 |
一种考虑谱型相关性的竖向地震动的条件均值谱生成方法
|
|
US20240018869A1
(en)
*
|
2022-03-29 |
2024-01-18 |
Koloma, Inc. |
Systems and methods for discovering and recovering subsurface fluids and verification of subsurface storage fluids
|
|
CN119096166A
(zh)
*
|
2022-05-02 |
2024-12-06 |
阿布扎比国家石油公司 |
用于开采地下储层的方法和系统
|
|
US12509981B2
(en)
|
2022-09-09 |
2025-12-30 |
Saudi Arabian Oil Company |
Parametric attribute of pore volume of subsurface structure from structural depth map
|
|
WO2024243558A2
(en)
*
|
2023-05-25 |
2024-11-28 |
Schlumberger Technology Corporation |
Implementation of generative artificial intelligence in oilfield operations
|