MX2017000678A - Determinacion de uno o mas parametros de un diseño de terminacion de pozo con base en datos de perforacion que corresponden a variables de energia especifica mecanica. - Google Patents
Determinacion de uno o mas parametros de un diseño de terminacion de pozo con base en datos de perforacion que corresponden a variables de energia especifica mecanica.Info
- Publication number
- MX2017000678A MX2017000678A MX2017000678A MX2017000678A MX2017000678A MX 2017000678 A MX2017000678 A MX 2017000678A MX 2017000678 A MX2017000678 A MX 2017000678A MX 2017000678 A MX2017000678 A MX 2017000678A MX 2017000678 A MX2017000678 A MX 2017000678A
- Authority
- MX
- Mexico
- Prior art keywords
- parameters
- wcd
- specific energy
- mse values
- correspond
- Prior art date
Links
- 238000000034 method Methods 0.000 abstract 3
- 238000005553 drilling Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
Abstract
Se proporcionan métodos para determinar los parámetros de un diseño de terminación de pozo (WCD) para al menos una porción de un pozo perforado con base en los datos de perforación que corresponden a las variables de energía específica mecánica (MSE). En algunos casos, los valores MSE se pueden adquirir y los parámetros WCD se pueden basar en los valores MSE. Los valores MSE se pueden obtener de un proveedor o se pueden adquirir al calcular los valores MSE a través de los datos de perforación. En algunos casos, los datos se pueden enmendar antes de determinar los parámetros WCD para neutralizar sustancialmente las distorsiones de los datos. En algunos casos, los métodos pueden incluir incrementar un modelo geomecánico del pozo perforado de los valores MSE adquiridos, enmendar opcionalmente el modelo geomecánico y determinar los parámetros WCD del modelo geomecánico. También se proporcionan medios de almacenamiento que tienen instrucciones de programa que son ejecutables por un procesador para llevar a cabo cualquiera de los pasos de los métodos.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201462026199P | 2014-07-18 | 2014-07-18 | |
| US14/734,290 US11634979B2 (en) | 2014-07-18 | 2015-06-09 | Determining one or more parameters of a well completion design based on drilling data corresponding to variables of mechanical specific energy |
| PCT/US2015/036190 WO2016010667A1 (en) | 2014-07-18 | 2015-06-17 | Determining one or more parameters of a well completion design based on drilling data corresponding to variables of mechanical specific energy |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| MX2017000678A true MX2017000678A (es) | 2017-07-20 |
| MX382120B MX382120B (es) | 2025-03-13 |
Family
ID=55074163
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2017000678A MX382120B (es) | 2014-07-18 | 2015-06-17 | Determinacion de uno o mas parametros de un diseño de terminacion de pozo con base en datos de perforacion que corresponden a variables de energia especifica mecanica. |
Country Status (8)
| Country | Link |
|---|---|
| US (2) | US11634979B2 (es) |
| EP (2) | EP3330480B1 (es) |
| CN (1) | CN106795748B (es) |
| BR (1) | BR112017001104A2 (es) |
| CA (1) | CA2955343C (es) |
| EA (1) | EA201790214A1 (es) |
| MX (1) | MX382120B (es) |
| WO (1) | WO2016010667A1 (es) |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9085958B2 (en) * | 2013-09-19 | 2015-07-21 | Sas Institute Inc. | Control variable determination to maximize a drilling rate of penetration |
| CN106339564B (zh) * | 2016-09-06 | 2017-11-24 | 西安石油大学 | 一种基于灰色关联聚类的射孔方案优选方法 |
| US10260331B2 (en) * | 2016-11-03 | 2019-04-16 | Nabors Drilling Technologies Usa, Inc. | Autodrilling control with annulus pressure modification of differential pressure |
| WO2018212781A1 (en) * | 2017-05-19 | 2018-11-22 | Halliburton Energy Services, Inc. | Predictive lithology and formation type for downhole drilling |
| CN109145322A (zh) * | 2017-06-19 | 2019-01-04 | 中国石油化工股份有限公司 | 一种应用于空气锤钻井的机械比能计算方法和系统 |
| US11346215B2 (en) | 2018-01-23 | 2022-05-31 | Baker Hughes Holdings Llc | Methods of evaluating drilling performance, methods of improving drilling performance, and related systems for drilling using such methods |
| GB201801354D0 (en) * | 2018-01-26 | 2018-03-14 | Antech Ltd | Drilling apparatus and method for the determination of formation location |
| US10808517B2 (en) | 2018-12-17 | 2020-10-20 | Baker Hughes Holdings Llc | Earth-boring systems and methods for controlling earth-boring systems |
| CN112031749A (zh) * | 2019-05-16 | 2020-12-04 | 中国石油集团工程技术研究院有限公司 | 一种油气钻探用钻头综合性能评价方法 |
| CN110714745A (zh) * | 2019-10-17 | 2020-01-21 | 中国石油集团长城钻探工程有限公司 | 页岩气水平井压裂分段优化方法 |
| CN112364560B (zh) * | 2020-10-19 | 2022-07-05 | 武汉理工大学 | 矿山凿岩装备作业工时智能预测方法 |
| CN114764519A (zh) * | 2021-01-14 | 2022-07-19 | 中国石油天然气集团有限公司 | 水平井分段多簇压裂射孔簇位置设计方法 |
| CN114705208B (zh) * | 2022-03-30 | 2025-07-04 | 阿波罗智联(北京)科技有限公司 | 导航方法、装置、电子设备和介质 |
| CN115839227B (zh) * | 2022-11-23 | 2025-03-04 | 中国石油天然气集团有限公司 | 基于机械比能的水平井压裂分段分簇方法及装置 |
Family Cites Families (31)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7036610B1 (en) * | 1994-10-14 | 2006-05-02 | Weatherford / Lamb, Inc. | Apparatus and method for completing oil and gas wells |
| US7108084B2 (en) * | 1994-10-14 | 2006-09-19 | Weatherford/Lamb, Inc. | Methods and apparatus for cementing drill strings in place for one pass drilling and completion of oil and gas wells |
| US7181380B2 (en) * | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
| US7835893B2 (en) * | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
| WO2007018860A2 (en) * | 2005-07-27 | 2007-02-15 | Exxonmobil Upstream Research Company | Well modeling associated with extraction of hydrocarbons from subsurface formations |
| EP1954915A4 (en) * | 2005-11-18 | 2015-08-12 | Exxonmobile Upstream Res Company | METHOD FOR DRILLING AND PRODUCING HYDROCARBONS FROM SUBSURFACE FORMATIONS |
| US7325617B2 (en) | 2006-03-24 | 2008-02-05 | Baker Hughes Incorporated | Frac system without intervention |
| US7953587B2 (en) | 2006-06-15 | 2011-05-31 | Schlumberger Technology Corp | Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs |
| US7857047B2 (en) * | 2006-11-02 | 2010-12-28 | Exxonmobil Upstream Research Company | Method of drilling and producing hydrocarbons from subsurface formations |
| BRPI0720903B8 (pt) * | 2007-02-02 | 2019-10-15 | Exxonmobil Upstream Res Co | métodos de modelar equipamento de perfuração e de produzir hidrocarbonetos e sistema de modelagem |
| WO2009032416A1 (en) * | 2007-09-07 | 2009-03-12 | Exxonmobill Upstream Research Company | Well performance modeling in a collaborative well planning environment |
| US7963327B1 (en) * | 2008-02-25 | 2011-06-21 | QRI Group, LLC | Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics |
| WO2009139949A1 (en) * | 2008-05-13 | 2009-11-19 | Exxonmobil Upstream Research Company | Modeling of hydrocarbon reservoirs using design of experiments methods |
| WO2010021786A1 (en) * | 2008-08-19 | 2010-02-25 | Exxonmobil Upstream Research Company | Fluid injection completion techniques |
| US8892407B2 (en) * | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
| US8280709B2 (en) * | 2008-10-03 | 2012-10-02 | Schlumberger Technology Corporation | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations |
| US8798978B2 (en) * | 2009-08-07 | 2014-08-05 | Exxonmobil Upstream Research Company | Methods to estimate downhole drilling vibration indices from surface measurement |
| DK2542753T3 (en) * | 2010-03-05 | 2016-12-05 | Safekick Americas Llc | System and method for safe well control operation |
| CN103015967B (zh) * | 2010-04-12 | 2016-01-20 | 国际壳牌研究有限公司 | 为滑动钻井控制井底钻具组合的工具面方向的方法 |
| US20120067567A1 (en) * | 2010-09-22 | 2012-03-22 | Schlumberger Technology Corporation | Downhole completion system with retrievable power unit |
| US9027671B2 (en) * | 2010-11-12 | 2015-05-12 | National Oilwell Varco, L.P. | Apparatus and method for automated drilling of a borehole in a subsurface formation |
| US20130140031A1 (en) * | 2010-12-30 | 2013-06-06 | Schlumberger Technology Corporation | System and method for performing optimized downhole stimulation operations |
| GB2500517B (en) * | 2010-12-30 | 2018-12-05 | Schlumberger Holdings | System and method for performing downhole stimulation operations |
| CA2822810A1 (en) * | 2011-02-21 | 2012-08-30 | Exxonmobil Upstream Research Company | Method and system for field planning |
| US20130048307A1 (en) * | 2011-08-23 | 2013-02-28 | Schlumberger Technology Corporation | Completion for downhole applications |
| US9057245B2 (en) | 2011-10-27 | 2015-06-16 | Aps Technology, Inc. | Methods for optimizing and monitoring underground drilling |
| GB201120916D0 (en) * | 2011-12-05 | 2012-01-18 | Halliburton Energy Serv Inc | Method for assessing the performance of a drill bit configuration, and for comparing the performance of different drill bit configurations for drilling |
| US8596385B2 (en) | 2011-12-22 | 2013-12-03 | Hunt Advanced Drilling Technologies, L.L.C. | System and method for determining incremental progression between survey points while drilling |
| CA2863586C (en) | 2012-02-24 | 2018-05-15 | Landmark Graphics Corporation | Determining optimal parameters for a downhole operation |
| US9482084B2 (en) | 2012-09-06 | 2016-11-01 | Exxonmobil Upstream Research Company | Drilling advisory systems and methods to filter data |
| CN103790568B (zh) * | 2014-01-07 | 2016-08-17 | 西南石油大学 | 一种钻井参数与效率实时优化方法 |
-
2015
- 2015-06-09 US US14/734,290 patent/US11634979B2/en active Active
- 2015-06-17 EP EP18150844.1A patent/EP3330480B1/en active Active
- 2015-06-17 CN CN201580046456.4A patent/CN106795748B/zh active Active
- 2015-06-17 EP EP15738510.5A patent/EP3169869B1/en active Active
- 2015-06-17 WO PCT/US2015/036190 patent/WO2016010667A1/en not_active Ceased
- 2015-06-17 CA CA2955343A patent/CA2955343C/en active Active
- 2015-06-17 BR BR112017001104A patent/BR112017001104A2/pt not_active Application Discontinuation
- 2015-06-17 EA EA201790214A patent/EA201790214A1/ru unknown
- 2015-06-17 MX MX2017000678A patent/MX382120B/es unknown
-
2023
- 2023-04-24 US US18/138,221 patent/US20230265754A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| CA2955343A1 (en) | 2016-01-21 |
| BR112017001104A2 (pt) | 2018-07-10 |
| EP3330480A1 (en) | 2018-06-06 |
| US20230265754A1 (en) | 2023-08-24 |
| WO2016010667A1 (en) | 2016-01-21 |
| HK1256682A1 (en) | 2019-10-04 |
| MX382120B (es) | 2025-03-13 |
| EP3169869A1 (en) | 2017-05-24 |
| EP3169869B1 (en) | 2018-01-10 |
| EP3330480B1 (en) | 2019-09-25 |
| EA201790214A1 (ru) | 2017-06-30 |
| CN106795748A (zh) | 2017-05-31 |
| US20160017696A1 (en) | 2016-01-21 |
| CA2955343C (en) | 2018-06-12 |
| US11634979B2 (en) | 2023-04-25 |
| CN106795748B (zh) | 2020-08-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX2017000678A (es) | Determinacion de uno o mas parametros de un diseño de terminacion de pozo con base en datos de perforacion que corresponden a variables de energia especifica mecanica. | |
| GB2544696A (en) | Casing wear prediction using integrated physics-driven and data-driven models | |
| KR101638378B9 (ko) | 2차원 도면에 기반한 3차원 자동 입체모델링 방법 및 프로그램 | |
| IL247611B (en) | Methods and devices for displaying trend and variability in a physiological dataset | |
| AR101843A1 (es) | Predicción de fallas de herramientas de fondo de pozo inducidas por ciclo de temperatura | |
| EP3667611A4 (en) | INFORMATION PROCESSING DEVICE, MODEL DATA CREATION PROGRAM AND MODEL DATA CREATION PROCESS | |
| IL282118A (en) | Electrolytic devices and methods for dry hydrogen peroxide production | |
| EP3627404A4 (en) | PREDICTION DEVICE, PREDICTION PROCESS, PREDICTION PROGRAM, LEARNING MODEL INPUT DATA PRODUCTION DEVICE, AND LEARNING MODEL INPUT DATA PRODUCTION PROGRAM | |
| SG11201707373RA (en) | Space information generating device, space information generating method, and program | |
| SA516380495B1 (ar) | جهاز وطريقة للإزالة المستمرة للردم من مصفاة الرمل أسفل البئر | |
| PL3696816T3 (pl) | Urządzenie generujące sekwencję okresowej połączonej obwiedni, sposób generowania sekwencji okresowej połączonej obwiedni, program do generowania sekwencji okresowej połączonej obwiedni i nośnik rejestrujący | |
| EP3002701A4 (en) | METHOD AND DEVICE FOR UPDATING PROGRAM DATA | |
| BR112016021565A2 (pt) | aparelho e método para estimar um tempo de mistura geral com base em pelo menos um primeiro par de respostas impulsivas de sala, bem como programa de computador correspondente | |
| PL3688473T3 (pl) | Sposób i program komputerowy do przewidywania poziomów bilirubiny u noworodków | |
| EA201891718A1 (ru) | Способ вычисления выработки радиогенного тепла | |
| PL3160089T3 (pl) | Sposób i urządzenie do generowania zależności sieciowych | |
| TW201614530A (en) | Method for modeling a photoresist profile | |
| EP3625990A4 (en) | RESOURCE SELECTION PROCESS, DEVICE AND COMPUTER STORAGE MEDIA | |
| NO20141572A1 (no) | En modifisert elektrolysecelle og en fremgangsmåte for modifisering av samme | |
| KR102127449B9 (ko) | 생존율 예측 모델 생성 방법, 장치 및 컴퓨터 프로그램 | |
| EP3606315A4 (en) | DATA CREATION DEVICE AND DATA CREATION METHOD | |
| DK4093036T3 (da) | Data genererende metode | |
| EP3447638A4 (en) | TEMPLATE GENERATION DEVICE, TEMPLATE GENERATION PROCEDURE AND PRESENTATION GENERATION METHOD | |
| SG10201403973YA (en) | A Method And A Corresponding Server, Computer-Readable Storage Medium And Computer Program | |
| Tchaava | Advancing management process of surrogacy and egg donation agency, through contemporary informational technologies |