MX2016003641A - Produccion de hidrocarburos. - Google Patents
Produccion de hidrocarburos.Info
- Publication number
- MX2016003641A MX2016003641A MX2016003641A MX2016003641A MX2016003641A MX 2016003641 A MX2016003641 A MX 2016003641A MX 2016003641 A MX2016003641 A MX 2016003641A MX 2016003641 A MX2016003641 A MX 2016003641A MX 2016003641 A MX2016003641 A MX 2016003641A
- Authority
- MX
- Mexico
- Prior art keywords
- zone
- well
- formation
- fracture
- producing hydrocarbons
- Prior art date
Links
- 229930195733 hydrocarbon Natural products 0.000 title abstract 3
- 150000002430 hydrocarbons Chemical class 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 6
- 239000000463 material Substances 0.000 abstract 2
- 239000012530 fluid Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/162—Injecting fluid from longitudinally spaced locations in injection well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/17—Interconnecting two or more wells by fracturing or otherwise attacking the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/255—Methods for stimulating production including the injection of a gaseous medium as treatment fluid into the formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
Abstract
Se describen un método y aparato para producir hidrocarburos de una formación subterránea. Se proporciona un primer pozo en la formación. El primer pozo se separa por un material aislante en al menos una primera y una segunda zona, la primera zona estando sustancialmente aislada de la segunda zona. En la formación también se proporciona un segundo pozo. El segundo pozo está separado por un material aislante en al menos una primera y segunda zona, la primera zona estando sustancialmente aislada de la segunda zona. En la formación se proporciona una primera fractura, la primera fractura extendiéndose substancialmente entre las primeras zonas de los primero y segundo pozos. En la formación también se proporciona una segunda fractura, la segunda fractura se extiende sustancialmente entre las segundas zonas de los primero y segundo pozos. Un fluido se inyecta en la formación de la primera zona en el primer pozo y se producen hidrocarburos en la segunda zona del segundo pozo.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/033,079 US9828840B2 (en) | 2013-09-20 | 2013-09-20 | Producing hydrocarbons |
| PCT/EP2014/069983 WO2015040155A2 (en) | 2013-09-20 | 2014-09-19 | Producing hydrocarbons |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| MX2016003641A true MX2016003641A (es) | 2017-01-09 |
| MX370614B MX370614B (es) | 2019-12-18 |
Family
ID=51589295
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2016003641A MX370614B (es) | 2013-09-20 | 2014-09-19 | Produccion de hidrocarburos. |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US9828840B2 (es) |
| CA (1) | CA2924715A1 (es) |
| MX (1) | MX370614B (es) |
| WO (1) | WO2015040155A2 (es) |
Families Citing this family (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20150167437A1 (en) * | 2013-12-13 | 2015-06-18 | Statoil Gulf Services LLC | Stimulation method and system for enhancing oil production |
| US10012064B2 (en) | 2015-04-09 | 2018-07-03 | Highlands Natural Resources, Plc | Gas diverter for well and reservoir stimulation |
| US10344204B2 (en) | 2015-04-09 | 2019-07-09 | Diversion Technologies, LLC | Gas diverter for well and reservoir stimulation |
| US9988900B2 (en) * | 2015-06-30 | 2018-06-05 | Statoil Gulf Services LLC | Method of geometric evaluation of hydraulic fractures by using pressure changes |
| US10982520B2 (en) | 2016-04-27 | 2021-04-20 | Highland Natural Resources, PLC | Gas diverter for well and reservoir stimulation |
| US10215014B2 (en) * | 2016-07-03 | 2019-02-26 | Reveal Energy Services, Inc. | Mapping of fracture geometries in a multi-well stimulation process |
| US20180187533A1 (en) * | 2017-01-05 | 2018-07-05 | Saudi Arabian Oil Company | Hydrocarbon production by fluidically isolating vertical regions of formations |
| US11028679B1 (en) | 2017-01-24 | 2021-06-08 | Devon Energy Corporation | Systems and methods for controlling fracturing operations using monitor well pressure |
| US11365617B1 (en) | 2017-01-24 | 2022-06-21 | Devon Energy Corporation | Systems and methods for controlling fracturing operations using monitor well pressure |
| CA2997822C (en) | 2017-03-08 | 2024-01-02 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
| CA3012203A1 (en) | 2017-07-24 | 2019-01-24 | Reveal Energy Services, Inc. | Dynamically modeling a hydraulic fracture |
| US10851643B2 (en) | 2017-11-02 | 2020-12-01 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
| US12031087B2 (en) | 2019-03-21 | 2024-07-09 | Board Of Regents, The University Of Texas System | Oxygenated solvents for improved production of oil and gas |
| US11624277B2 (en) | 2020-07-20 | 2023-04-11 | Reveal Energy Services, Inc. | Determining fracture driven interactions between wellbores |
| CN115478818B (zh) * | 2021-05-31 | 2024-07-26 | 中国石油化工股份有限公司 | 一种co2与n2复合吞吐提高采收率的方法 |
| US11859490B2 (en) | 2021-08-19 | 2024-01-02 | Devon Energy Corporation | Systems and methods for monitoring fracturing operations using monitor well flow |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3358756A (en) * | 1965-03-12 | 1967-12-19 | Shell Oil Co | Method for in situ recovery of solid or semi-solid petroleum deposits |
| US3513914A (en) * | 1968-09-30 | 1970-05-26 | Shell Oil Co | Method for producing shale oil from an oil shale formation |
| US3739851A (en) * | 1971-11-24 | 1973-06-19 | Shell Oil Co | Method of producing oil from an oil shale formation |
| US3908762A (en) * | 1973-09-27 | 1975-09-30 | Texaco Exploration Ca Ltd | Method for establishing communication path in viscous petroleum-containing formations including tar sand deposits for use in oil recovery operations |
| US3888307A (en) * | 1974-08-29 | 1975-06-10 | Shell Oil Co | Heating through fractures to expand a shale oil pyrolyzing cavern |
| US5025859A (en) | 1987-03-31 | 1991-06-25 | Comdisco Resources, Inc. | Overlapping horizontal fracture formation and flooding process |
| US4889186A (en) | 1988-04-25 | 1989-12-26 | Comdisco Resources, Inc. | Overlapping horizontal fracture formation and flooding process |
| US5095983A (en) * | 1990-10-02 | 1992-03-17 | Chevron And Research And Technology Company | Multiphase production evaluation method using thru-tubing, wireline packoff devices |
| OA13131A (en) * | 2000-09-20 | 2006-12-13 | Sofitech Nv | Method for gravel packing open holes fracturing pressure. |
| GB2379685A (en) | 2002-10-28 | 2003-03-19 | Shell Internat Res Maatschhapp | Enhanced oil recovery with asynchronous cyclic variation of injection rates |
| EA010677B1 (ru) * | 2003-11-03 | 2008-10-30 | Эксонмобил Апстрим Рисерч Компани | Способ извлечения углеводородов из непроницаемых нефтеносных сланцев |
| DK2189622T3 (en) * | 2007-01-25 | 2019-02-04 | Welldynamics Inc | Casing valve system for selective borehole stimulation and control |
| US7647966B2 (en) * | 2007-08-01 | 2010-01-19 | Halliburton Energy Services, Inc. | Method for drainage of heavy oil reservoir via horizontal wellbore |
| CN104981584A (zh) | 2012-03-01 | 2015-10-14 | 国际壳牌研究有限公司 | 低渗透率轻质油储层中的流体注入 |
| CA2820742A1 (en) | 2013-07-04 | 2013-09-20 | IOR Canada Ltd. | Improved hydrocarbon recovery process exploiting multiple induced fractures |
-
2013
- 2013-09-20 US US14/033,079 patent/US9828840B2/en not_active Expired - Fee Related
-
2014
- 2014-09-19 MX MX2016003641A patent/MX370614B/es active IP Right Grant
- 2014-09-19 CA CA2924715A patent/CA2924715A1/en not_active Abandoned
- 2014-09-19 WO PCT/EP2014/069983 patent/WO2015040155A2/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| WO2015040155A2 (en) | 2015-03-26 |
| US20150083398A1 (en) | 2015-03-26 |
| WO2015040155A3 (en) | 2015-08-27 |
| CA2924715A1 (en) | 2015-03-26 |
| MX370614B (es) | 2019-12-18 |
| US9828840B2 (en) | 2017-11-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX370614B (es) | Produccion de hidrocarburos. | |
| MX2016009840A (es) | Pozo de inyeccion y metodos de produccion, aparatos y sistemas. | |
| GB2522145A (en) | Improved hydraulic fracturing process for deviated wellbores | |
| MX373398B (es) | Sistema y metodo para re-fracturar perforaciones de pozo horizontales de multizonas. | |
| MX337567B (es) | Método para la fracturación de múltiples zonas dentro de un pozo. | |
| WO2014163853A3 (en) | Producing hydrocarbons from a formation | |
| WO2012058027A3 (en) | Method and system for fracturing a formation | |
| GB2536527A (en) | Wettability altering fluids during downhole operations | |
| AR096590A1 (es) | Inhibidores de arcilla para perforación, fracturación, y otros procedimientos | |
| MX2016002796A (es) | Perdidas de circulacion y materiales de perdidas de fluidos que contienen paja guar y metodos para producir y usar los mismos. | |
| GB2554209A (en) | Providing communication between wellbores through directional hydraulic fracturing | |
| MX343560B (es) | Metodos y dispositivos para la fracturacion hidraulica y optimizacion: una modificacion a la fracturacion tipo cremallera. | |
| EP3152392A4 (en) | Method for improved design of hydraulic fracture height in a subterranean laminated rock formation | |
| EA201391474A1 (ru) | Способ добычи нефти из подземных пластов | |
| MX2015014465A (es) | Metodo para la recuperacion mejorada de petroleo por dioxido de carbono y su almacenamiento, y uso de los mismos. | |
| MX2015015881A (es) | Registro de produccion en pozos multilaterales. | |
| GB2541306A (en) | Forming multilateral wells | |
| MX2016003267A (es) | Metodos para el tratamiento de una formacion subterranea. | |
| WO2013043663A3 (en) | Dual purpose observation and production well | |
| SA520411763B1 (ar) | مادة خافضة للتوتر السطحي ذاتية الدعم لتحفيز بئر | |
| MX2015013366A (es) | Metodo de produccion de gas, petroleo y mineral usando un metodo y sistema de prosamiento de limpieza. | |
| MX363284B (es) | Metodo y dispositivo para limpiar las particulas de control de un pozo. | |
| MY176815A (en) | Process for mining alluvial deposits | |
| SA516371568B1 (ar) | نظام وطريقة لتجهيز بئر | |
| MX389421B (es) | Desviador de gas para pozo y estimulacion de yaciemiento. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant or registration |