MX2014010766A - Control de operaciones de perforacion utilizando multiples modelos hidraulicos concurrentes. - Google Patents
Control de operaciones de perforacion utilizando multiples modelos hidraulicos concurrentes.Info
- Publication number
- MX2014010766A MX2014010766A MX2014010766A MX2014010766A MX2014010766A MX 2014010766 A MX2014010766 A MX 2014010766A MX 2014010766 A MX2014010766 A MX 2014010766A MX 2014010766 A MX2014010766 A MX 2014010766A MX 2014010766 A MX2014010766 A MX 2014010766A
- Authority
- MX
- Mexico
- Prior art keywords
- drilling operation
- hydraulics models
- hydraulics
- models
- operation control
- Prior art date
Links
- 238000005553 drilling Methods 0.000 title abstract 8
- 238000000034 method Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/10—Valve arrangements in drilling-fluid circulation systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/08—Wipers; Oil savers
- E21B33/085—Rotatable packing means, e.g. rotating blow-out preventers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/02—Valve arrangements for boreholes or wells in well heads
- E21B34/025—Chokes or valves in wellheads and sub-sea wellheads for variably regulating fluid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
- E21B44/005—Below-ground automatic control systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
- E21B21/085—Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Geophysics (AREA)
- Earth Drilling (AREA)
- Fluid-Pressure Circuits (AREA)
- Flow Control (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
Abstract
Un sistema de control para la perforación de un pozo subterráneo puede incluir múltiples modelos hidráulicos que funcionan concurrentemente, en donde cada uno de los modelos hidráulicos emite un punto de referencia de presión, en tiempo real durante una operación de perforación. Un método para controlar una operación de perforación puede comprender correr concurrentemente múltiples modelos hidráulicos durante la operación de perforación, y cambiar entre las salidas de los múltiples modelos hidráulicos para controlar la operación de perforación, en donde el cambio se realiza durante la operación de perforación. Otro método para controlar una operación de perforación puede incluir el controlar la operación de por lo menos un dispositivo de control de flujo, con lo que se mantiene una presión a un punto de referencia de presión, y seleccionar el punto de referencia de presión de entre las señales de salida de múltiples modelos hidráulicos que funcionan concurrentemente.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/US2012/039586 WO2013176677A1 (en) | 2012-05-25 | 2012-05-25 | Drilling operation control using multiple concurrent hydraulics models |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| MX2014010766A true MX2014010766A (es) | 2015-03-09 |
| MX361253B MX361253B (es) | 2018-11-30 |
Family
ID=49624203
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2014010766A MX361253B (es) | 2012-05-25 | 2012-05-25 | Control de operaciones de perforación utilizando múltiples modelos hidráulicos concurrentes. |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US20150083401A1 (es) |
| EP (1) | EP2809878A4 (es) |
| AU (1) | AU2012381021B2 (es) |
| BR (1) | BR112014029345A2 (es) |
| CA (1) | CA2868760A1 (es) |
| MX (1) | MX361253B (es) |
| RU (1) | RU2014148526A (es) |
| WO (1) | WO2013176677A1 (es) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10060208B2 (en) * | 2015-02-23 | 2018-08-28 | Weatherford Technology Holdings, Llc | Automatic event detection and control while drilling in closed loop systems |
| US10364662B1 (en) * | 2015-06-08 | 2019-07-30 | DataInfoCom USA, Inc. | Systems and methods for analyzing resource production |
| US11454102B2 (en) * | 2016-05-11 | 2022-09-27 | Baker Hughes, LLC | Methods and systems for optimizing a drilling operation based on multiple formation measurements |
| US11220623B2 (en) | 2016-06-06 | 2022-01-11 | Halliburton Energy Services, Inc. | Flow constraint material and slurry compositions |
| WO2017213624A1 (en) | 2016-06-06 | 2017-12-14 | Halliburton Energy Services, Inc. | Fracturing a subterranean formation |
| US10723939B2 (en) | 2016-06-27 | 2020-07-28 | Halliburton Energy Services, Inc. | Methods and compositions for treating a subterranean formation with a polymeric additive composite |
| WO2018034637A1 (en) | 2016-08-14 | 2018-02-22 | Halliburton Energy Services, Inc. | Telemetry system |
| AU2016423067B2 (en) | 2016-09-14 | 2021-12-02 | Halliburton Energy Services, Inc. | Travel joint |
| WO2018071020A1 (en) | 2016-10-13 | 2018-04-19 | Halliburton Energy Services, Inc. | Resonant transformer for downhole electrocrushing drilling |
| CN108643887B (zh) * | 2018-04-26 | 2020-02-21 | 中国石油大学(华东) | 用于钻井作业的控制方法及控制装置 |
| WO2021231833A1 (en) * | 2020-05-14 | 2021-11-18 | Schlumberger Technology Corporation | Annulus pressure release system |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6374925B1 (en) * | 2000-09-22 | 2002-04-23 | Varco Shaffer, Inc. | Well drilling method and system |
| TWI282092B (en) | 2002-06-28 | 2007-06-01 | Brilliance Semiconductor Inc | Nonvolatile static random access memory cell |
| US6832159B2 (en) * | 2002-07-11 | 2004-12-14 | Schlumberger Technology Corporation | Intelligent diagnosis of environmental influence on well logs with model-based inversion |
| US8170801B2 (en) * | 2007-02-26 | 2012-05-01 | Bp Exploration Operating Company Limited | Determining fluid rate and phase information for a hydrocarbon well using predictive models |
| CN201460863U (zh) | 2009-07-30 | 2010-05-12 | 中国石油天然气集团公司 | 一种控压钻井系统 |
| AU2009350516B2 (en) * | 2009-07-30 | 2014-05-29 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
| WO2011043764A1 (en) * | 2009-10-05 | 2011-04-14 | Halliburton Energy Services, Inc. | Integrated geomechanics determinations and wellbore pressure control |
| US8240398B2 (en) * | 2010-06-15 | 2012-08-14 | Halliburton Energy Services, Inc. | Annulus pressure setpoint correction using real time pressure while drilling measurements |
| US9279299B2 (en) * | 2010-08-26 | 2016-03-08 | Halliburton Energy Services, Inc. | System and method for managed pressure drilling |
-
2012
- 2012-05-25 MX MX2014010766A patent/MX361253B/es active IP Right Grant
- 2012-05-25 AU AU2012381021A patent/AU2012381021B2/en not_active Ceased
- 2012-05-25 WO PCT/US2012/039586 patent/WO2013176677A1/en not_active Ceased
- 2012-05-25 EP EP12877289.4A patent/EP2809878A4/en not_active Withdrawn
- 2012-05-25 BR BR112014029345A patent/BR112014029345A2/pt not_active Application Discontinuation
- 2012-05-25 US US14/380,713 patent/US20150083401A1/en not_active Abandoned
- 2012-05-25 CA CA2868760A patent/CA2868760A1/en not_active Abandoned
- 2012-05-25 RU RU2014148526A patent/RU2014148526A/ru not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| EP2809878A1 (en) | 2014-12-10 |
| AU2012381021A1 (en) | 2014-09-11 |
| AU2012381021B2 (en) | 2015-10-22 |
| WO2013176677A1 (en) | 2013-11-28 |
| CA2868760A1 (en) | 2013-11-28 |
| MX361253B (es) | 2018-11-30 |
| RU2014148526A (ru) | 2016-07-20 |
| US20150083401A1 (en) | 2015-03-26 |
| BR112014029345A2 (pt) | 2017-06-27 |
| EP2809878A4 (en) | 2015-11-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX2014010766A (es) | Control de operaciones de perforacion utilizando multiples modelos hidraulicos concurrentes. | |
| EP3015609A4 (en) | Device for controlling control valve of construction machine, method for controlling same, and method for controlling discharge flow rate of hydraulic pump | |
| EP3258526A4 (en) | Redox flow battery system, pump control unit, and redox flow battery operation method | |
| GB2537297B (en) | Hydraulic cutting tool, system and method for controlled hydraulic cutting through a pipe wall in a well, and also uses of the cutting tool and the system | |
| GB2518982B (en) | Drilling system and associated system and method for monitoring, controlling, and predicting vibration in an underground drilling operation | |
| GB2518981B (en) | Drilling system and associated system and method for monitoring, controlling, and predicting vibration in an underground drilling operation | |
| GB2526034B (en) | Valve loader method, system and apparatus | |
| GB2569255B (en) | Flow control system for use in a subterranean well | |
| WO2013186282A3 (de) | Verfahren und vorrichtung zum management einer energieerzeugungseinheit | |
| EP3246473A4 (en) | Drilling machine, method for controlling drilling machine, and drilling system | |
| SG11201600486VA (en) | Method, system, and optimization technique to improve oil reservoir recovery in the water-alternating-gas injection process by using downhole control valves (wag-cv) | |
| GB201308582D0 (en) | A microgrid control apparatus method and system for controlling energy flow within a microgrid | |
| GB201416233D0 (en) | Method, system and controller for process control in a bioreactor | |
| EP3226373A4 (en) | Power control device, power supply system, and method for controlling power supply system | |
| EP3101506A4 (en) | Device for controlling regenerated flow rate for construction machine and method for controlling same | |
| EP3137228A4 (en) | Method for fluid pressure control in a closed system | |
| EP3019689A4 (en) | System and method for operating a pump in a downhole tool | |
| EP2759714A4 (en) | HYDRAULIC CONTROL VALVE, TWO CYLINDER EXTRACTION SYSTEM AND LIFTING MAANPULATION MACHINE | |
| EP3214843A4 (en) | Method and device for adjusting and controlling sub-frames in multiple frames, and multipoint control unit | |
| HUE046237T2 (hu) | Eljárás gáznyomás gázvezeték-hálózatban történõ szabályozására és gáznyomás-szabályozó állomás | |
| EP2857602A4 (en) | HYDRAULIC SYSTEM FOR PACKAGERS WITH INDEPENDENT PRESSURE-CONTROLLED RIVER CONTROL | |
| SG178863A1 (en) | Flow rate dependent flow control device | |
| EP3062175A4 (en) | Control system design assist device, control system design assist program, control system design assist method, operation change amount calculation device, and control device | |
| EP3066296A4 (en) | Controller apparatus, system and/or method for controlling pressures in a fluid control system | |
| IL251960A0 (en) | Routing hydraulic system to actuate a control valve |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant or registration |