MX2012012854A - Sistemas y metodos de optimizacion de pozo. - Google Patents
Sistemas y metodos de optimizacion de pozo.Info
- Publication number
- MX2012012854A MX2012012854A MX2012012854A MX2012012854A MX2012012854A MX 2012012854 A MX2012012854 A MX 2012012854A MX 2012012854 A MX2012012854 A MX 2012012854A MX 2012012854 A MX2012012854 A MX 2012012854A MX 2012012854 A MX2012012854 A MX 2012012854A
- Authority
- MX
- Mexico
- Prior art keywords
- well
- optimization
- systems
- methods
- load potential
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/007—Measuring stresses in a pipe string or casing
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Theoretical Computer Science (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Feedback Control In General (AREA)
- Design And Manufacture Of Integrated Circuits (AREA)
- Testing Or Measuring Of Semiconductors Or The Like (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Se presentan sistemas y métodos para la optimización de un pozo, los cuales incluyen procedimientos numéricos para la selección de una trayectoria óptima del pozo y la resistencia de la tubería de revestimiento en función del Potencial de Carga de Yacimiento. Un método incluye utilizar el método implementado por computadora para la optimización de un pozo, el método incluye el cálculo de un modelo de escala de campo para múltiples vías de pozo en un campo de extracción, el cálculo de un Potencial de Carga de Yacimiento para el modelo de escala de campo, la selección de una vía de pozo que tiene el valor pico más bajo del Potencial de Carga de Yacimiento, y la determinación de la resistencia óptima de tubería de revestimiento para el pozo.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/US2010/039156 WO2011159307A1 (en) | 2010-06-18 | 2010-06-18 | Systems and methods for wellbore optimization |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MX2012012854A true MX2012012854A (es) | 2013-01-11 |
Family
ID=45348484
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2012012854A MX2012012854A (es) | 2010-06-18 | 2010-06-18 | Sistemas y metodos de optimizacion de pozo. |
Country Status (8)
| Country | Link |
|---|---|
| US (1) | US9689207B2 (es) |
| EP (1) | EP2583214B1 (es) |
| CN (1) | CN103262094B (es) |
| AU (1) | AU2010355268B2 (es) |
| CA (1) | CA2796911C (es) |
| EA (1) | EA025004B1 (es) |
| MX (1) | MX2012012854A (es) |
| WO (1) | WO2011159307A1 (es) |
Families Citing this family (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9416652B2 (en) | 2013-08-08 | 2016-08-16 | Vetco Gray Inc. | Sensing magnetized portions of a wellhead system to monitor fatigue loading |
| CN103556977B (zh) * | 2013-10-27 | 2016-01-13 | 长江大学 | 一种多层分注管柱通过性分析方法 |
| CN108729911A (zh) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | 用于资源生产系统的优化装置、系统和方法 |
| US11416650B2 (en) | 2017-06-16 | 2022-08-16 | Landmark Graphics Corporation | Optimized visualization of loads and resistances for wellbore tubular design |
| CN109555512A (zh) * | 2017-09-26 | 2019-04-02 | 中国石油天然气股份有限公司 | 套管所受应力的计算方法和装置 |
| US12359551B2 (en) | 2019-02-05 | 2025-07-15 | Magnetic Variation Services, Llc | Geosteering methods and systems for improved drilling performance |
| CA3121861A1 (en) | 2019-02-05 | 2020-08-13 | Motive Drilling Technologies, Inc. | Downhole display |
| CA3133783A1 (en) | 2019-03-18 | 2020-09-24 | Magnetic Variation Services, Llc | Steering a wellbore using stratigraphic misfit heat maps |
| US11946360B2 (en) | 2019-05-07 | 2024-04-02 | Magnetic Variation Services, Llc | Determining the likelihood and uncertainty of the wellbore being at a particular stratigraphic vertical depth |
| US11287788B2 (en) | 2019-06-27 | 2022-03-29 | Halliburton Energy Services, Inc. | Field development optimization through direct rig equipment control |
| US11118422B2 (en) * | 2019-08-28 | 2021-09-14 | Schlumberger Technology Corporation | Automated system health check and system advisor |
| US11982158B2 (en) | 2020-03-24 | 2024-05-14 | Landmark Graphics Corporation | Systems and methods for borehole tubular design |
| WO2022192313A1 (en) * | 2021-03-11 | 2022-09-15 | Saudi Arabian Oil Company | Methods and systems for monitoring wellbore integrity throughout a wellbore lifecycle using modeling techniques |
| CN112966023B (zh) * | 2021-03-12 | 2024-06-14 | 中海石油(中国)有限公司 | 一种井筒的完整性预判方法 |
| CN114036703B (zh) * | 2021-04-23 | 2024-06-18 | 西南石油大学 | 一种盐膏岩层深井石油套管强度分析方法 |
| CN113283069B (zh) * | 2021-05-18 | 2022-10-14 | 长江大学 | 一种钻井套管可靠性预测方法及系统 |
| US20250278532A1 (en) * | 2024-03-01 | 2025-09-04 | Schlumberger Technology Corporation | Predicting torque and drag buckling behavior of a drill string and casing |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6612382B2 (en) * | 1996-03-25 | 2003-09-02 | Halliburton Energy Services, Inc. | Iterative drilling simulation process for enhanced economic decision making |
| US6354373B1 (en) * | 1997-11-26 | 2002-03-12 | Schlumberger Technology Corporation | Expandable tubing for a well bore hole and method of expanding |
| AU2002303481A1 (en) * | 2001-04-24 | 2002-11-05 | Shell Oil Company | In situ recovery from a relatively low permeability formation containing heavy hydrocarbons |
| US7181380B2 (en) * | 2002-12-20 | 2007-02-20 | Geomechanics International, Inc. | System and process for optimal selection of hydrocarbon well completion type and design |
| RU2321064C2 (ru) * | 2004-06-03 | 2008-03-27 | Мурманский государственный технический университет | Способ построения обратимой трехмерной гидродинамической модели земли, калибруемой в реальном времени в процессе бурения |
| GB0419588D0 (en) * | 2004-09-03 | 2004-10-06 | Virtual Well Engineer Ltd | "Design and control of oil well formation" |
| US7630872B2 (en) * | 2004-09-16 | 2009-12-08 | Schlumberger Technology Corporation | Methods for visualizing distances between wellbore and formation boundaries |
| US7412368B2 (en) * | 2004-11-15 | 2008-08-12 | Landmark Graphics Corporation | Methods and computer-readable media for determining design parameters to prevent tubing buckling in deviated wellbores |
| US7366616B2 (en) | 2006-01-13 | 2008-04-29 | Schlumberger Technology Corporation | Computer-based method for while-drilling modeling and visualization of layered subterranean earth formations |
| US7653488B2 (en) * | 2007-08-23 | 2010-01-26 | Schlumberger Technology Corporation | Determination of point of sand production initiation in wellbores using residual deformation characteristics and real time monitoring of sand production |
| US8200465B2 (en) * | 2008-06-18 | 2012-06-12 | Terratek Inc. | Heterogeneous earth models for a reservoir field |
| CN101392647B (zh) * | 2008-11-14 | 2012-11-21 | 北京石大联创石油新技术有限公司 | 一种适用于气体钻井的井壁稳定性预测方法 |
-
2010
- 2010-06-18 US US13/805,257 patent/US9689207B2/en not_active Expired - Fee Related
- 2010-06-18 EA EA201300032A patent/EA025004B1/ru not_active IP Right Cessation
- 2010-06-18 CA CA2796911A patent/CA2796911C/en not_active Expired - Fee Related
- 2010-06-18 WO PCT/US2010/039156 patent/WO2011159307A1/en not_active Ceased
- 2010-06-18 EP EP10853367.0A patent/EP2583214B1/en active Active
- 2010-06-18 MX MX2012012854A patent/MX2012012854A/es active IP Right Grant
- 2010-06-18 AU AU2010355268A patent/AU2010355268B2/en not_active Ceased
- 2010-06-18 CN CN201080067517.2A patent/CN103262094B/zh not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| EA025004B1 (ru) | 2016-11-30 |
| EP2583214B1 (en) | 2019-07-17 |
| EP2583214A1 (en) | 2013-04-24 |
| WO2011159307A1 (en) | 2011-12-22 |
| EA201300032A1 (ru) | 2013-06-28 |
| AU2010355268A1 (en) | 2012-11-08 |
| CN103262094A (zh) | 2013-08-21 |
| US20130166263A1 (en) | 2013-06-27 |
| EP2583214A4 (en) | 2017-10-18 |
| CN103262094B (zh) | 2016-01-13 |
| US9689207B2 (en) | 2017-06-27 |
| CA2796911A1 (en) | 2011-12-22 |
| AU2010355268B2 (en) | 2015-03-26 |
| CA2796911C (en) | 2017-06-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX2012012854A (es) | Sistemas y metodos de optimizacion de pozo. | |
| MX2015017673A (es) | Sistema y metodo para seleccionar una trayectoria de perforacion con base en el costo. | |
| MX382324B (es) | Sistemas y métodos para optimizar las operaciones de fracturación del yacimiento. | |
| AR092694A1 (es) | Produccion en sistemas fracturados | |
| MX2017003189A (es) | Metodos de gestion de salud y bienestar y sistemas utiles para la practica de los mismos. | |
| GB2550820B (en) | Enhanced oil recovery (EOR) chemical coreflood simulation study workflow | |
| SA518390949B1 (ar) | طريقة لتحديد المسامية المرتبطة بمادة عضوية في بئر أو تكوين | |
| GB201314204D0 (en) | Three-dimensional moedeling parameters for oilfield drilling | |
| GB2537263A (en) | Monitoring fluid flow in a downhole assembly | |
| MY179810A (en) | Zero equivalent circulating density drilling method | |
| SA516371856B1 (ar) | مراقبة العديد من سلاسل الأنابيب باستخدام أداة كهرومغناطيسية للكشف عن التآكل (em) | |
| AR091020A1 (es) | Modelado de esfuerzo alrededor de un pozo de perforacion | |
| EA201201583A1 (ru) | Системы и способы для корреляции и геонавигации горизонтальных скважин | |
| GB2540101A (en) | Real-time optical flow imaging to determine particle size distribution | |
| MX2013012177A (es) | Determinacion de la integridad de pozos. | |
| MX2017007454A (es) | Metodos y sistemas para modelar un ensamblaje de fondo de pozo tridimensional avanzado. | |
| MX2017006923A (es) | Mejora de inversion direccionamiento geologico utilizando herramienta electromagnetica de adelante y de alrededor. | |
| MX2014016036A (es) | Sistemas, metodos y equipo para determinar la presencia de fluidos de interes. | |
| MX369521B (es) | Metodos de creacion de bancos de celulas de alta densidad. | |
| GB2540288A (en) | System and method for analyzing wellbore survey data to determine tortuosity of the wellbore using displacements of the wellbore path from reference lines | |
| DK3146144T3 (da) | Brøndstreng til boring gennem en lavtrykszone | |
| AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión | |
| MX2015015586A (es) | Sistemas y metodos para optimizar pozos existentes y diseñar nuevos pozos sobre la base de la distribucion de longitudes de fractura efectiva medias. | |
| NO20171708A1 (en) | Estimating casing wear during drilling using multiple wear factors along the drill string | |
| CL2014001936A1 (es) | Sistema de recolección, traspaso y gestión de datos de medición de consumo de diversos flujos y electricidad, que permite mejorar la eficiencia en la recolección de los datos de consumo que comprende un subsistema de centro de datos, un subsistema de red de datos y un subsistema de tele medidores en donde el susbsistema de red de datos tiene una conexion alambrica o inalambrica entre los otros subsistemas. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant or registration |