MX2012007880A - Sistemas para estimar nuevos costos de disponibilidad operacional de planta industrial. - Google Patents
Sistemas para estimar nuevos costos de disponibilidad operacional de planta industrial.Info
- Publication number
- MX2012007880A MX2012007880A MX2012007880A MX2012007880A MX2012007880A MX 2012007880 A MX2012007880 A MX 2012007880A MX 2012007880 A MX2012007880 A MX 2012007880A MX 2012007880 A MX2012007880 A MX 2012007880A MX 2012007880 A MX2012007880 A MX 2012007880A
- Authority
- MX
- Mexico
- Prior art keywords
- plant
- systems
- availability
- costs
- industrial plant
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
La presente invención se refiere a sistemas y métodos para estimar la disponibilidad de un propietario de planta. Cuando un propietario de una planta está preparando para una fase suministrable de un proyecto de construcción de planta (por ejemplo, propiedad u operación de la planta), la disponibilidad del propietario de puede determinar. Además, el costo de lograr la disponibilidad puede ser estimado con base en los atributos de la planta bajo construcción y con base en las listas de verificación del proyecto de construcción de la planta o modelos de disponibilidad previos. Los sistemas contemplados también pueden recomendar un plan de disponibilidad junto con una probabilidad de éxito del plan.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US29326010P | 2010-01-08 | 2010-01-08 | |
| PCT/US2011/020523 WO2011085203A1 (en) | 2010-01-08 | 2011-01-07 | Systems for estimating new industrial plant operational readiness costs |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MX2012007880A true MX2012007880A (es) | 2012-08-03 |
Family
ID=44305801
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2012007880A MX2012007880A (es) | 2010-01-08 | 2011-01-07 | Sistemas para estimar nuevos costos de disponibilidad operacional de planta industrial. |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20130191093A1 (es) |
| EP (1) | EP2521982A4 (es) |
| JP (1) | JP5582510B2 (es) |
| CN (1) | CN103026374A (es) |
| CA (1) | CA2786523A1 (es) |
| MX (1) | MX2012007880A (es) |
| WO (1) | WO2011085203A1 (es) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP2564366A4 (en) * | 2010-04-26 | 2015-01-21 | Fluor Tech Corp | PLANNING SYSTEM AND METHODS FOR RISK ASSESSMENT AND REDUCTION |
| CN104537159B (zh) * | 2014-12-15 | 2018-03-16 | 华晨汽车集团控股有限公司 | 一种基于Checklist的仿真分析任务处理系统 |
| JP6350554B2 (ja) * | 2016-02-03 | 2018-07-04 | 横河電機株式会社 | 設備診断装置、設備診断方法及び設備診断プログラム |
| WO2017161250A1 (en) * | 2016-03-17 | 2017-09-21 | Elsevier, Inc. | Systems and methods for electronic searching of materials and material properties |
| US10970634B2 (en) * | 2016-11-10 | 2021-04-06 | General Electric Company | Methods and systems for capturing analytic model authoring knowledge |
| WO2020202163A1 (en) | 2019-04-02 | 2020-10-08 | Buildots Ltd. | Determining position of an image capture device |
Family Cites Families (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5189606A (en) * | 1989-08-30 | 1993-02-23 | The United States Of America As Represented By The Secretary Of The Air Force | Totally integrated construction cost estimating, analysis, and reporting system |
| JPH07225793A (ja) * | 1994-02-10 | 1995-08-22 | Fujita Corp | 工程ネットワーク作成方法 |
| JPH09268760A (ja) * | 1996-03-28 | 1997-10-14 | Shimizu Corp | 工程計画管理支援システム |
| JPH10115096A (ja) * | 1996-10-09 | 1998-05-06 | Toshiba Corp | プラント建設支援システム |
| US7349838B2 (en) * | 1998-07-31 | 2008-03-25 | Summers Gary J | Management training simulation method and system |
| JP2001101284A (ja) * | 1999-09-29 | 2001-04-13 | Toshiba Corp | 製品製造の見積り方法及びその装置並びに記憶媒体 |
| EP1323059A2 (en) * | 2000-04-05 | 2003-07-02 | Pavilion Technologies, Inc. | System and method for enterprise modelling, optimization and control |
| WO2002019228A1 (en) * | 2000-09-01 | 2002-03-07 | Togethersoft Corporation | Methods and systems for improving a workflow based on data mined from plans created from the workflow |
| JP2003114989A (ja) * | 2001-10-05 | 2003-04-18 | Kurita Water Ind Ltd | 水処理設備見積システム |
| US6735490B2 (en) * | 2001-10-12 | 2004-05-11 | General Electric Company | Method and system for automated integration of design analysis subprocesses |
| US20040030590A1 (en) * | 2002-08-05 | 2004-02-12 | Swan Coalen L. | Total integrated performance system and method |
| JP2004355284A (ja) * | 2003-05-28 | 2004-12-16 | Akiyama:Kk | 地域一体型住宅メンテナンス・リフォームシステム |
| US20050114829A1 (en) * | 2003-10-30 | 2005-05-26 | Microsoft Corporation | Facilitating the process of designing and developing a project |
| JP2005182558A (ja) * | 2003-12-22 | 2005-07-07 | Hitachi Ltd | コスト予測・評価方式 |
| DE102005004233A1 (de) * | 2005-01-28 | 2006-08-17 | Abb Research Ltd. | System und Verfahren zur Einsatzplanung, Prozessüberwachung, Simulation und Optimierung einer kombinierten Stromerzeugungs- und Wasserentsalzungsanlage |
| JP2006276954A (ja) * | 2005-03-28 | 2006-10-12 | Hitachi Information Systems Ltd | 工事見積システム |
| US20080091496A1 (en) * | 2006-10-17 | 2008-04-17 | Omer Gurpinar | Method and system for delivering and executing best practices in oilfield development projects |
| US8160977B2 (en) * | 2006-12-11 | 2012-04-17 | Poulin Christian D | Collaborative predictive model building |
| CN100445901C (zh) * | 2007-01-25 | 2008-12-24 | 上海交通大学 | 基于AR(p)模型的过程工业生产过程动态成本控制方法 |
| JP4778528B2 (ja) * | 2007-01-30 | 2011-09-21 | 株式会社ファインコラボレート研究所 | 建築コスト見積装置、建築コスト見積方法、および、建築コスト見積プログラム |
| US20080249756A1 (en) * | 2007-04-06 | 2008-10-09 | Pongsak Chaisuparasmikul | Method and system for integrating computer aided design and energy simulation |
| US20090138306A1 (en) * | 2007-09-28 | 2009-05-28 | Johnson Controls Technology Company | Facility risk assessment systems and methods |
| JP2010211364A (ja) * | 2009-03-09 | 2010-09-24 | Hitachi Ltd | プロジェクトのシミュレーション方法及びシミュレーションシステム |
-
2011
- 2011-01-07 WO PCT/US2011/020523 patent/WO2011085203A1/en not_active Ceased
- 2011-01-07 CA CA2786523A patent/CA2786523A1/en not_active Abandoned
- 2011-01-07 CN CN2011800129074A patent/CN103026374A/zh active Pending
- 2011-01-07 US US13/520,981 patent/US20130191093A1/en not_active Abandoned
- 2011-01-07 JP JP2012548153A patent/JP5582510B2/ja not_active Expired - Fee Related
- 2011-01-07 EP EP20110732206 patent/EP2521982A4/en not_active Ceased
- 2011-01-07 MX MX2012007880A patent/MX2012007880A/es not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| EP2521982A4 (en) | 2014-02-19 |
| EP2521982A1 (en) | 2012-11-14 |
| JP5582510B2 (ja) | 2014-09-03 |
| CN103026374A (zh) | 2013-04-03 |
| JP2013516707A (ja) | 2013-05-13 |
| CA2786523A1 (en) | 2011-07-14 |
| WO2011085203A1 (en) | 2011-07-14 |
| US20130191093A1 (en) | 2013-07-25 |
| AU2011204269A1 (en) | 2012-07-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CL2020002805A1 (es) | Método para identificar un modulador de un sistema biológico; método para identificar un modulador de un proceso de enfermedad (divisional 201302526) | |
| AR090420A1 (es) | Sistema y metodo para calcular el precio, alquilar, y transferir la propiedad de neumaticos | |
| MX2012007880A (es) | Sistemas para estimar nuevos costos de disponibilidad operacional de planta industrial. | |
| MX341510B (es) | Metodo, sistema, y dispositivo para navegacion basada en lista de cosas por hacer. | |
| BR112017010159A2 (pt) | dispositivo de gerenciamento de veículo compartilhado e método de gerenciamento de veículo compartilhado | |
| BR112015012452A2 (pt) | consulta de características com base em ações de usuário em sistemas online | |
| TWD167565S (zh) | 銷售點基座(二) | |
| MX367414B (es) | Metodo relacionado con la prediccion del estado futuro de un usuario de dispositivo movil. | |
| WO2014133522A3 (en) | Local message queue processing for co-located workers | |
| FR3000670B1 (fr) | Composition cosmetique apaisante a base d'acide salicylique. | |
| BR112015002435A2 (pt) | método e dispositivo para avisar remoção de aplicativo | |
| CR20150109A (es) | Sistemas y métodos para proveer, recarga y tarjetas de valor almacenado redimir utilizados en aplicaciones de tránsito | |
| WO2014186784A3 (en) | Reputation scoring system for project based professionals | |
| FI20125700L (fi) | Yhteisdata suhdetiedolla | |
| FR2989377B1 (fr) | Fluorophores organiques emettant a l'etat solide | |
| AU2012101375A4 (en) | FutureNetID | |
| WO2012126430A3 (zh) | 基于管理分层的关联告警的方法和装置 | |
| MX353069B (es) | Sistema de señalización. | |
| CR20130315A (es) | Trapeador para cuartos esteriles para toda superficie | |
| TWD157075S (zh) | 鑰匙 | |
| Gao et al. | Induced subgraphs in sparse random graphs with given degree sequences | |
| BR112014029653A2 (pt) | recipiente, e processo | |
| WO2013163646A3 (en) | Geographic information system (gis) with linked gis objects and gis operation | |
| Cåðàæóäèíîâè | ÐÅÖÅÍÇÈß ÍÀ ÌÎÍÎÃÐÀÔÈÞ «ÈÌÈÄÆÅÂÀß ÑÒÐÀÒÅÃÈß ÐÎÑÑÈÈ Â ÊÎÍÒÅÊÑÒÅ ÌÈÐÎÂÎÃÎ ÎÏÛÒÀ» | |
| Filip | Distributed Monte-Carlo Tree Search for Games with Team of Cooperative Agents |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FA | Abandonment or withdrawal |