|
WO2009085395A1
(en)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Methods and systems for determining near-wellbore characteristics and reservoir properties
|
|
EP2235566A1
(en)
*
|
2008-01-22 |
2010-10-06 |
Exxonmobil Upstream Research Company |
Dynamic connectivity analysis
|
|
AU2010308495A1
(en)
|
2009-10-20 |
2012-05-10 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
|
EP2534605B1
(en)
*
|
2010-02-12 |
2020-06-17 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
CA2786584C
(en)
|
2010-03-12 |
2017-07-18 |
Exxonmobil Upstream Research Company |
Dynamic grouping of domain objects via smart groups
|
|
US8788252B2
(en)
*
|
2010-10-26 |
2014-07-22 |
Schlumberger Technology Corporation |
Multi-well time-lapse nodal analysis of transient production systems
|
|
CA2823017A1
(en)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
|
US9513402B2
(en)
|
2011-08-23 |
2016-12-06 |
Exxonmobil Upstream Research Company |
Estimating fracture dimensions from microseismic data
|
|
US20130110485A1
(en)
*
|
2011-10-26 |
2013-05-02 |
Weichang Li |
Determining Interwell Communication
|
|
US9261869B2
(en)
*
|
2012-02-13 |
2016-02-16 |
Emerson Process Management Power & Water Solutions, Inc. |
Hybrid sequential and simultaneous process simulation system
|
|
US10352134B2
(en)
|
2012-05-30 |
2019-07-16 |
Landmark Graphics Corporation |
Oil or gas production using computer simulation of oil or gas fields and production facilities
|
|
US10253600B2
(en)
|
2012-06-15 |
2019-04-09 |
Landmark Graphics Corporation |
Parallel network simulation apparatus, methods, and systems
|
|
US9617833B2
(en)
*
|
2012-06-22 |
2017-04-11 |
Halliburton Energy Services, Inc. |
Evaluating fluid flow in a wellbore
|
|
US9153049B2
(en)
|
2012-08-24 |
2015-10-06 |
International Business Machines Corporation |
Resource provisioning using predictive modeling in a networked computing environment
|
|
FR2997721B1
(fr)
*
|
2012-11-08 |
2015-05-15 |
Storengy |
Radonip : nouvelle methodologie de determination des courbes de productivite des puits d'exploitation de stockages et gisements de fluides compressibles
|
|
CA2899144A1
(en)
*
|
2013-01-31 |
2014-08-07 |
Schlumberger Canada Limited |
Methods for analyzing formation tester pretest data
|
|
US10337283B2
(en)
*
|
2013-03-29 |
2019-07-02 |
Schlumberger Technology Corporation |
Optimum flow control valve setting system and procedure
|
|
US10482996B2
(en)
|
2013-05-06 |
2019-11-19 |
Schlumberger Technology Corporation |
Systems and methods for determining relative geochemical data
|
|
MX2015015402A
(es)
*
|
2013-05-07 |
2016-03-15 |
Schlumberger Technology Bv |
Prueba de impulso de cámara cerrada con mediciónde caudal de fondo de pozo.
|
|
CA2907728C
(en)
|
2013-06-10 |
2021-04-27 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
|
US10578766B2
(en)
*
|
2013-08-05 |
2020-03-03 |
Advantek International Corp. |
Quantifying a reservoir volume and pump pressure limit
|
|
US10571604B2
(en)
|
2013-08-30 |
2020-02-25 |
Saudi Arabian Oil Company |
Two dimensional reservoir pressure estimation with integrated static bottom-hole pressure survey data and simulation modeling
|
|
US9896930B2
(en)
|
2013-08-30 |
2018-02-20 |
Saudi Arabian Oil Company |
Three-dimensional reservoir pressure determination using real time pressure data from downhole gauges
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
US9569521B2
(en)
|
2013-11-08 |
2017-02-14 |
James W. Crafton |
System and method for analyzing and validating oil and gas well production data
|
|
US10119396B2
(en)
*
|
2014-02-18 |
2018-11-06 |
Saudi Arabian Oil Company |
Measuring behind casing hydraulic conductivity between reservoir layers
|
|
US9417970B2
(en)
*
|
2014-02-27 |
2016-08-16 |
Halliburton Energy Services, Inc. |
Data file processing for a well job data archive
|
|
CN104018827A
(zh)
*
|
2014-05-13 |
2014-09-03 |
长江大学 |
一种基于叠覆朵体的三角洲砂体内部结构分析方法
|
|
GB2580834B
(en)
*
|
2014-06-11 |
2021-03-10 |
Advantek Int Corporation |
Quantifying a reservoir volume and pump pressure limit
|
|
AU2014405553A1
(en)
|
2014-09-03 |
2017-02-09 |
Landmark Graphics Corporation |
Locally lumped equation of state fluid characterization in reservoir simulation
|
|
EP3101225B1
(en)
*
|
2014-10-28 |
2022-06-29 |
Services Pétroliers Schlumberger |
Integrated interpretation of pressure and rate transients for production forecasting
|
|
WO2016073418A1
(en)
*
|
2014-11-03 |
2016-05-12 |
Schlumberger Canada Limited |
Assessing whether to modify a pipe system
|
|
US10392922B2
(en)
*
|
2015-01-13 |
2019-08-27 |
Saudi Arabian Oil Company |
Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests
|
|
US10180057B2
(en)
|
2015-01-21 |
2019-01-15 |
Saudi Arabian Oil Company |
Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells
|
|
US20180010429A1
(en)
*
|
2015-01-23 |
2018-01-11 |
Schlumberger Technology Corporation |
Control system and method of flowback operations for shale reservoirs
|
|
US10094202B2
(en)
|
2015-02-04 |
2018-10-09 |
Saudi Arabian Oil Company |
Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions
|
|
WO2016133399A1
(en)
*
|
2015-02-20 |
2016-08-25 |
Production Monitoring As |
Production monitoring - multi volume dynamic semi steady parametric model
|
|
CN104989385B
(zh)
*
|
2015-05-12 |
2017-12-22 |
四川大学 |
基于表皮系数计算的高温高压油气直井射孔参数优化方法
|
|
US10242136B2
(en)
*
|
2015-05-20 |
2019-03-26 |
Saudi Arabian Oil Company |
Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation
|
|
US10787887B2
(en)
|
2015-08-07 |
2020-09-29 |
Schlumberger Technology Corporation |
Method of performing integrated fracture and reservoir operations for multiple wellbores at a wellsite
|
|
US10920538B2
(en)
|
2015-08-07 |
2021-02-16 |
Schlumberger Technology Corporation |
Method integrating fracture and reservoir operations into geomechanical operations of a wellsite
|
|
CN106437690B
(zh)
*
|
2015-08-07 |
2020-05-08 |
中国石油天然气股份有限公司 |
辫状河三角洲相三维空间分布确定方法及装置
|
|
US11578568B2
(en)
*
|
2015-08-07 |
2023-02-14 |
Schlumberger Technology Corporation |
Well management on cloud computing system
|
|
CN105134187B
(zh)
*
|
2015-08-18 |
2018-01-05 |
中国石油天然气股份有限公司 |
一种辅助油藏沉积相划分及连通性评价的方法及装置
|
|
US10359542B2
(en)
*
|
2016-01-22 |
2019-07-23 |
Saudi Arabian Oil Company |
Generating dynamically calibrated geo-models in green fields
|
|
EP3423676A1
(en)
*
|
2016-03-04 |
2019-01-09 |
Saudi Arabian Oil Company |
Sequential fully implicit well model with tridiagonal matrix structure for reservoir simulation
|
|
CN108019203B
(zh)
*
|
2016-10-31 |
2021-11-26 |
中国石油化工股份有限公司 |
一种分层压裂裂缝沟通识别方法
|
|
CN106570262B
(zh)
*
|
2016-11-03 |
2021-08-20 |
中国石油化工股份有限公司 |
一种储层构型结构的描述方法
|
|
CN106837297B
(zh)
*
|
2016-12-22 |
2020-04-10 |
中国石油天然气股份有限公司 |
一种识别井间连通性及油水动态预测的方法
|
|
US10233749B2
(en)
*
|
2017-05-03 |
2019-03-19 |
Saudi Arabian Oil Company |
Multi-layer reservoir well drainage region
|
|
WO2019048599A1
(en)
*
|
2017-09-08 |
2019-03-14 |
Roxar Software Solutions As |
Well fracture modelling
|
|
US10679401B2
(en)
*
|
2017-10-24 |
2020-06-09 |
GE Sensing & Inspection Technologies, LP |
Monitoring multiple industrial machines
|
|
CN111971452A
(zh)
|
2018-02-21 |
2020-11-20 |
沙特阿拉伯石油公司 |
使用互连储层区域图的渗透率预测
|
|
US11126762B2
(en)
*
|
2018-02-28 |
2021-09-21 |
Saudi Arabian Oil Company |
Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration
|
|
US20190324832A1
(en)
*
|
2018-04-18 |
2019-10-24 |
Alberto Avritzer |
Metric for the assessment of distributed high-availability architectures using survivability modeling
|
|
WO2019212826A1
(en)
*
|
2018-04-30 |
2019-11-07 |
Exxonmobil Upstream Research Company (Emhc-N1-4A-607) |
Methods and systems for reference-based inversion of seismic image volumes
|
|
CN109025981A
(zh)
*
|
2018-06-22 |
2018-12-18 |
中国石油天然气股份有限公司 |
曲流河侧积砂体对比方法及系统
|
|
CN109146142B
(zh)
*
|
2018-07-25 |
2020-08-11 |
中国矿业大学 |
一种回采巷道矿压显现数据的预测方法
|
|
WO2020027834A1
(en)
*
|
2018-08-01 |
2020-02-06 |
Halliburton Energy Services, Inc. |
Designing a wellbore cement sheath in compacting or subsiding formations
|
|
WO2020198194A1
(en)
|
2019-03-26 |
2020-10-01 |
Drilling Info, Inc. |
Determining a landing zone in a subterranean formation
|
|
CN112392441B
(zh)
*
|
2019-08-13 |
2022-08-12 |
中国石油化工股份有限公司 |
一种用于生物礁气藏的连通单元划分方法以及开采方法
|
|
US12416223B2
(en)
*
|
2019-10-31 |
2025-09-16 |
Landmark Graphics Corporation |
Model parameter reductions and model parameter selection to optimize execution time of reservoir management workflows
|
|
CN111206919B
(zh)
*
|
2019-12-20 |
2023-03-24 |
陕西延长石油(集团)有限责任公司研究院 |
长井段高产气井储层段井筒压力计算方法
|
|
US11493654B2
(en)
|
2020-05-11 |
2022-11-08 |
Saudi Arabian Oil Company |
Construction of a high-resolution advanced 3D transient model with multiple wells by integrating pressure transient data into static geological model
|
|
US11193370B1
(en)
|
2020-06-05 |
2021-12-07 |
Saudi Arabian Oil Company |
Systems and methods for transient testing of hydrocarbon wells
|
|
US11163084B1
(en)
|
2020-08-14 |
2021-11-02 |
Saudi Arabian Oil Company |
Machine learning-based differencing tool for hydrocarbon well logs
|
|
CN111927420A
(zh)
*
|
2020-08-15 |
2020-11-13 |
西南石油大学 |
一种任意形状气藏有限导流非对称裂缝井压力模拟方法
|
|
US12152481B2
(en)
*
|
2020-11-16 |
2024-11-26 |
AKM Enterprises, Inc. |
System and method for drilling performance benchmarking and drilling adjustment
|
|
EP4006299B1
(en)
|
2020-11-30 |
2025-07-09 |
Services Pétroliers Schlumberger |
Method and system for automated multi-zone downhole closed loop reservoir testing
|
|
CN112431578B
(zh)
*
|
2020-12-02 |
2022-07-29 |
山西潞安环保能源开发股份有限公司常村煤矿 |
一种含有断层的低渗透煤层抽采矿井瓦斯的方法
|
|
US11579334B2
(en)
|
2021-04-07 |
2023-02-14 |
Enverus, Inc. |
Determining a wellbore landing zone
|
|
US12404767B2
(en)
*
|
2021-06-17 |
2025-09-02 |
Halliburton Energy Services, Inc. |
Data driven in-situ injection and production flow monitoring
|
|
US11852011B2
(en)
|
2021-10-11 |
2023-12-26 |
Saudi Arabian Oil Company |
Application of field shut-down pressure transient to define boundaries of reservoir heterogeneities
|
|
CN114169616B
(zh)
*
|
2021-12-10 |
2024-07-26 |
西安石油大学 |
一种低产低效井的判别方法
|
|
CN114266179B
(zh)
*
|
2021-12-23 |
2023-08-04 |
成都理工大学 |
基于有限单元的矿床钻探信息处理及分析方法和装置
|
|
US20230313647A1
(en)
*
|
2022-03-31 |
2023-10-05 |
Halliburton Energy Services, Inc. |
Methods to dynamically control fluid flow in a multi-well system, methods to dynamically provide real-time status of fluid flow in a multi-well system, and multi-well fluid flow control systems
|
|
CN114994789B
(zh)
*
|
2022-07-11 |
2025-06-06 |
成都理工大学 |
基于动静态信息融合的致密气藏河道砂体连通性验证方法
|
|
CN115545480B
(zh)
*
|
2022-10-10 |
2025-05-13 |
长江大学 |
一种基于岩相模型的储层连通程度评价方法
|
|
US20240218788A1
(en)
*
|
2022-12-28 |
2024-07-04 |
Saudi Arabian Oil Company |
System and method to test wells at continuously-varying production rates
|
|
US20240218776A1
(en)
*
|
2023-01-03 |
2024-07-04 |
Saudi Arabian Oil Company |
Quantification of pressure interference among wells
|
|
CN116696293B
(zh)
*
|
2023-04-14 |
2024-04-02 |
常州大学 |
一种裂缝性背斜油藏注采井组干扰的识别方法
|
|
US12379515B2
(en)
|
2023-10-16 |
2025-08-05 |
Saudi Arabian Oil Company |
Systems and methods for updating hydrocarbon reservoir parameters
|
|
CN118223873B
(zh)
*
|
2024-05-23 |
2025-04-08 |
上海达坦能源科技股份有限公司四川分公司 |
一种用于油气田气驱注入的油层压力监测方法
|
|
CN119616474B
(zh)
*
|
2024-11-19 |
2025-07-18 |
中国石油大学(北京) |
储层连通性的确认方法、装置、设备、介质及产品
|