MX2010008130A - Determinar propiedades de una estructura subterranea durante fracturacion hidraulica. - Google Patents
Determinar propiedades de una estructura subterranea durante fracturacion hidraulica.Info
- Publication number
- MX2010008130A MX2010008130A MX2010008130A MX2010008130A MX2010008130A MX 2010008130 A MX2010008130 A MX 2010008130A MX 2010008130 A MX2010008130 A MX 2010008130A MX 2010008130 A MX2010008130 A MX 2010008130A MX 2010008130 A MX2010008130 A MX 2010008130A
- Authority
- MX
- Mexico
- Prior art keywords
- subterranean structure
- hydraulic fracturing
- structure during
- during hydraulic
- determining properties
- Prior art date
Links
- 239000012530 fluid Substances 0.000 abstract 2
- 238000002347 injection Methods 0.000 abstract 2
- 239000007924 injection Substances 0.000 abstract 2
- 238000000034 method Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/40—Seismology; Seismic or acoustic prospecting or detecting specially adapted for well-logging
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/107—Locating fluid leaks, intrusions or movements using acoustic means
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Acoustics & Sound (AREA)
- General Physics & Mathematics (AREA)
- Remote Sensing (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
Una técnica incluye recibir, durante una operación de fracturación hidráulica en una estructura subterránea, dato de presión y dato de régimen de inyección de fluido. Una o más propiedades de la estructura subterránea se determinan en tiempo real usando el dato de presión y el dato de régimen de inyección de fluido recibidos.
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/565,094 US20110067857A1 (en) | 2009-09-23 | 2009-09-23 | Determining properties of a subterranean structure during hydraulic fracturing |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| MX2010008130A true MX2010008130A (es) | 2011-03-22 |
Family
ID=43755622
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2010008130A MX2010008130A (es) | 2009-09-23 | 2010-07-26 | Determinar propiedades de una estructura subterranea durante fracturacion hidraulica. |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20110067857A1 (es) |
| MX (1) | MX2010008130A (es) |
Families Citing this family (41)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10060241B2 (en) * | 2009-06-05 | 2018-08-28 | Schlumberger Technology Corporation | Method for performing wellbore fracture operations using fluid temperature predictions |
| US8902711B2 (en) * | 2009-11-11 | 2014-12-02 | Chevron U.S.A. Inc. | System and method for analyzing and transforming geophysical and petrophysical data |
| US8386226B2 (en) * | 2009-11-25 | 2013-02-26 | Halliburton Energy Services, Inc. | Probabilistic simulation of subterranean fracture propagation |
| US8392165B2 (en) * | 2009-11-25 | 2013-03-05 | Halliburton Energy Services, Inc. | Probabilistic earth model for subterranean fracture simulation |
| US8886502B2 (en) * | 2009-11-25 | 2014-11-11 | Halliburton Energy Services, Inc. | Simulating injection treatments from multiple wells |
| US8898044B2 (en) * | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
| US9176245B2 (en) * | 2009-11-25 | 2015-11-03 | Halliburton Energy Services, Inc. | Refining information on subterranean fractures |
| US8437962B2 (en) * | 2009-11-25 | 2013-05-07 | Halliburton Energy Services, Inc. | Generating probabilistic information on subterranean fractures |
| CA2743611C (en) * | 2011-06-15 | 2017-03-14 | Engineering Seismology Group Canada Inc. | Methods and systems for monitoring and modeling hydraulic fracturing of a reservoir field |
| MX2014000772A (es) * | 2011-07-28 | 2014-05-01 | Schlumberger Technology Bv | Sistema y metodo para llevar a cabo operaciones de fractura del hoyo. |
| WO2013016733A1 (en) * | 2011-07-28 | 2013-01-31 | Schlumberger Canada Limited | System and method for performing wellbore fracture operations |
| BR112014008844A2 (pt) * | 2011-10-11 | 2017-04-18 | Prad Res & Dev Ltd | método de executar uma operação de fraturamento sobre uma perfuração de poço de uma formação subterrânea, método de executar uma operação de estimulação para um poço ter um reservatório posicionado em uma formação subterrânea, método de executar uma operação de estimulação para um poço tendo um reservatório posicionado em uma formação subterrânea, e sistema para realizar uma operação de um estimulação para um local de poço tendo perfuração de poço penetrando uma formação subterrânea, a formação subterrânea tendo descontinuidades nela |
| GB2503903B (en) * | 2012-07-11 | 2015-08-26 | Schlumberger Holdings | Fracture monitoring and characterisation |
| KR101245333B1 (ko) * | 2012-09-11 | 2013-03-19 | 한국지질자원연구원 | 압력 펄스 붕괴 시험에서의 불확도 감소 기법 |
| US9417348B2 (en) * | 2012-10-05 | 2016-08-16 | Halliburton Energy Services, Inc. | Updating microseismic histogram data |
| FR2997721B1 (fr) * | 2012-11-08 | 2015-05-15 | Storengy | Radonip : nouvelle methodologie de determination des courbes de productivite des puits d'exploitation de stockages et gisements de fluides compressibles |
| US20140195174A1 (en) * | 2013-01-09 | 2014-07-10 | David W. Machuga | Well water and aquifer quality measurement and analysis system |
| US9297250B2 (en) * | 2013-03-14 | 2016-03-29 | Halliburton Energy Services, Inc. | Controlling net treating pressure in a subterranean region |
| US9217318B2 (en) | 2013-03-14 | 2015-12-22 | Halliburton Energy Services, Inc. | Determining a target net treating pressure for a subterranean region |
| EP3084124B1 (en) | 2013-12-18 | 2019-05-08 | ConocoPhillips Company | Method for determining hydraulic fracture orientation and dimension |
| US10302786B2 (en) * | 2013-12-30 | 2019-05-28 | Cgg Services Sas | Methods and systems of determining a fault plane of a microseismic event |
| US10030497B2 (en) | 2015-02-10 | 2018-07-24 | Statoil Gulf Services LLC | Method of acquiring information of hydraulic fracture geometry for evaluating and optimizing well spacing for multi-well pad |
| US9988900B2 (en) | 2015-06-30 | 2018-06-05 | Statoil Gulf Services LLC | Method of geometric evaluation of hydraulic fractures by using pressure changes |
| US10954766B2 (en) * | 2016-04-08 | 2021-03-23 | Intelligent Solutions, Inc. | Methods, systems, and computer-readable media for evaluating service companies, identifying candidate wells and designing hydraulic refracturing |
| US11789170B2 (en) * | 2016-06-15 | 2023-10-17 | Schlumberger Technology Corporation | Induced seismicity |
| AU2017327711B2 (en) * | 2016-08-18 | 2020-10-22 | Seismos, Inc. | Method for evaluating and monitoring formation fracture treatment using fluid pressure waves |
| GB2553356A (en) | 2016-09-05 | 2018-03-07 | Geomec Eng Ltd | Improvements in or relating to geothermal power plants |
| CN106351617A (zh) * | 2016-10-27 | 2017-01-25 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | 一种可旋转喷嘴式双螺旋水力喷射器和应用 |
| US11209558B2 (en) | 2018-05-09 | 2021-12-28 | Conocophillips Company | Measurement of poroelastic pressure response |
| US11035213B2 (en) * | 2019-05-07 | 2021-06-15 | Halliburton Energy Services, Inc. | Pressure controlled wellbore treatment |
| US11066915B1 (en) | 2020-06-09 | 2021-07-20 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
| US11933153B2 (en) | 2020-06-22 | 2024-03-19 | Bj Energy Solutions, Llc | Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control |
| US11939853B2 (en) | 2020-06-22 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units |
| US11028677B1 (en) | 2020-06-22 | 2021-06-08 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
| US11473413B2 (en) | 2020-06-23 | 2022-10-18 | Bj Energy Solutions, Llc | Systems and methods to autonomously operate hydraulic fracturing units |
| US11466680B2 (en) | 2020-06-23 | 2022-10-11 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
| US11149533B1 (en) | 2020-06-24 | 2021-10-19 | Bj Energy Solutions, Llc | Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation |
| US11220895B1 (en) | 2020-06-24 | 2022-01-11 | Bj Energy Solutions, Llc | Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods |
| CN113863922B (zh) * | 2020-06-30 | 2023-08-22 | 中国石油天然气股份有限公司 | 可压性判定方法和压裂方法 |
| CN114542040B (zh) * | 2022-02-25 | 2024-04-26 | 山西蓝焰煤层气集团有限责任公司 | 一种连续脉冲水力压裂系统 |
| CN116084902B (zh) * | 2022-11-16 | 2024-05-03 | 西南石油大学 | 一种暂堵剂加量的优化方法 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3844348A (en) * | 1972-12-14 | 1974-10-29 | Phillips Petroleum Co | Method of controlling subterranean formation permeability employing graft-polymerized bacterial gum polysaccharide compositions |
| US4192753A (en) * | 1978-03-07 | 1980-03-11 | Union Oil Company Of California | Well completion and workover fluid having low fluid loss |
| US5048609A (en) * | 1990-12-14 | 1991-09-17 | Marathon Oil Company | Selective permeability reduction in a subterranean hydrocarbon-bearing formation using a nonselective gel |
| US5835882A (en) * | 1997-01-31 | 1998-11-10 | Phillips Petroleum Company | Method for determining barriers to reservoir flow |
| DZ3413A1 (fr) * | 2000-09-12 | 2002-03-21 | Sofitech Nv | Evaluation des proprietes du reservoir et de fracture hydraulique amalgames a multicouches utilisant des donnees de production de reservoirs amalgames et des informations de diagraphie de production |
| US6911418B2 (en) * | 2001-05-17 | 2005-06-28 | Schlumberger Technology Corporation | Method for treating a subterranean formation |
| US6981549B2 (en) * | 2002-11-06 | 2006-01-03 | Schlumberger Technology Corporation | Hydraulic fracturing method |
| US7520324B2 (en) * | 2004-06-18 | 2009-04-21 | Schlumberger Technology Corporation | Completion apparatus for measuring streaming potentials and determining earth formation characteristics |
| US7788037B2 (en) * | 2005-01-08 | 2010-08-31 | Halliburton Energy Services, Inc. | Method and system for determining formation properties based on fracture treatment |
| US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
| US9790788B2 (en) * | 2009-05-05 | 2017-10-17 | Baker Hughes Incorporated | Apparatus and method for predicting properties of earth formations |
| US8498852B2 (en) * | 2009-06-05 | 2013-07-30 | Schlumberger Tehcnology Corporation | Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon |
-
2009
- 2009-09-23 US US12/565,094 patent/US20110067857A1/en not_active Abandoned
-
2010
- 2010-07-26 MX MX2010008130A patent/MX2010008130A/es not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| US20110067857A1 (en) | 2011-03-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX2010008130A (es) | Determinar propiedades de una estructura subterranea durante fracturacion hidraulica. | |
| MX2012002513A (es) | Metodos mejorados de colocacion y desviacion de fluidos en formaciones subterraneas. | |
| WO2013022574A3 (en) | Methods for monitoring fluids within or produced from a subterranean formation during fracturing operations using opticoanalytical devices | |
| MX2012008172A (es) | Tensoactivos y polimeros para reduccion de friccion para la reduccion de bloqueos de agua y condensados gaseosos y metodos asociados. | |
| GB2474212A (en) | Downhole piezoelectric devices | |
| MX2015002480A (es) | Composiciones para dar mantenimiento a sondeos y metodos para producir y utilizar las mismas. | |
| MX353373B (es) | Métodos y materiales de ingeniería para reforzamiento de pozos en operaciones subterráneas. | |
| GB2502451A (en) | Downhole method and apparatus for use in conditioning drilled bores | |
| WO2009150402A3 (en) | Method of enhancing treatment fluid placement in shale, clay, and/or coal bed formations | |
| EP2250341A4 (en) | Apparatus, assembly and process for injecting fluid into a subterranean well | |
| MY150016A (en) | Treatment fluids comprising clarified xanthan and associated methods | |
| WO2012178026A3 (en) | Method for determining spacing of hydraulic fractures in a rock formation | |
| MX2008013499A (es) | Metodo de estimulacion. | |
| GB2471760B (en) | Apparatus and methods for subterranean downhole cutting, displacement and sealing operations using cable conveyance. | |
| WO2010082030A3 (en) | Methods of designing treatment fluids based on solid-fluid interactions | |
| WO2010139938A3 (en) | Proppant addition method and system | |
| GB2506793A (en) | System and method for performing wellbore fracture operations | |
| MY148869A (en) | Methods for reducing the viscosity of treatment fluids comprising diutan | |
| MX2010004008A (es) | Sellador de bola de varias capas y metodo para usar el mismo. | |
| PL2186870T3 (pl) | Spienione systemy żelowe do szczelinowania podziemnych formacji oraz sposoby ich wytwarzania i stosowania | |
| MX2009003033A (es) | Conjunto de terminado de sarta desconectada con sistema de inyeccion y metodos. | |
| MX2013000956A (es) | Pildora de alta viscosidad que reacciona a estimulos. | |
| MY148350A (en) | Fluid loss compositions and methods of use for subterranean operations | |
| MX2011013429A (es) | Metodos para tratar un pozo. | |
| MY176932A (en) | Wellbore servicing fluids comprising cationic polymers and methods of using same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FA | Abandonment or withdrawal |