MX2010002779A - Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. - Google Patents
Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion.Info
- Publication number
- MX2010002779A MX2010002779A MX2010002779A MX2010002779A MX2010002779A MX 2010002779 A MX2010002779 A MX 2010002779A MX 2010002779 A MX2010002779 A MX 2010002779A MX 2010002779 A MX2010002779 A MX 2010002779A MX 2010002779 A MX2010002779 A MX 2010002779A
- Authority
- MX
- Mexico
- Prior art keywords
- formation
- fracture behavior
- injection well
- pressure signature
- time period
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 5
- 238000002347 injection Methods 0.000 title abstract 3
- 239000007924 injection Substances 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 6
- 239000000243 solution Substances 0.000 abstract 3
- 238000005520 cutting process Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/06—Arrangements for treating drilling fluids outside the borehole
- E21B21/063—Arrangements for treating drilling fluids outside the borehole by separating components
- E21B21/065—Separating solids from drilling fluids
- E21B21/066—Separating solids from drilling fluids with further treatment of the solids, e.g. for disposal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/01—Arrangements for handling drilling fluids or cuttings outside the borehole, e.g. mud boxes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
- E21B41/005—Waste disposal systems
- E21B41/0057—Disposal of a fluid by injection into a subterranean formation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/008—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells by injection test; by analysing pressure variations in an injection or production test, e.g. for estimating the skin factor
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Processing Of Solid Wastes (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Measuring Fluid Pressure (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Se describe un m?todo para dise?ar una respuesta a un comportamiento de fractura de una formaci?n durante la re-inyecci?n de cortes a una formaci?n, el m?todo incluye obtener una firma de presi?n por un periodo de tiempo, interpretar la firma de presi?n por el periodo de tiempo para determinar el comportamiento de fractura de la formaci?n, determinar una soluci?n basada en el comportamiento de fractura de la formaci?n e implementar la soluci?n. Tambi?n se revela un m?todo para determinar un riesgo de sub-superficie de una operaci?n de re-inyecci?n de cortes, el m?todo incluye obtener una firma de presi?n por un periodo de tiempo, interpretar la firma de presi?n para determinar el comportamiento de fractura de la formaci?n, caracterizar un riesgo asociado con el comportamiento de fractura determinado de la formaci?n e implementar una soluci?n basada en el riesgo caracterizado.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US97209207P | 2007-09-13 | 2007-09-13 | |
| PCT/US2008/075087 WO2009035884A1 (en) | 2007-09-13 | 2008-09-03 | Method of using pressure signatures to predict injection well anomalies |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| MX2010002779A true MX2010002779A (es) | 2010-04-07 |
| MX343973B MX343973B (es) | 2016-11-30 |
Family
ID=40452407
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| MX2010002779A MX343973B (es) | 2007-09-13 | 2008-09-03 | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. |
Country Status (12)
| Country | Link |
|---|---|
| US (1) | US20100314104A1 (es) |
| EP (1) | EP2198115B1 (es) |
| CN (2) | CN104265211A (es) |
| AR (1) | AR068426A1 (es) |
| AU (1) | AU2008299195B2 (es) |
| BR (1) | BRPI0816851A2 (es) |
| CA (1) | CA2699503C (es) |
| CO (1) | CO6270163A2 (es) |
| EA (1) | EA021727B1 (es) |
| MX (1) | MX343973B (es) |
| NO (1) | NO2198115T3 (es) |
| WO (1) | WO2009035884A1 (es) |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EA017606B1 (ru) * | 2008-02-22 | 2013-01-30 | Эм-Ай Эл.Эл.Си. | Способ определения приемистости скважины по размещению отходов бурения |
| US8047284B2 (en) * | 2009-02-27 | 2011-11-01 | Halliburton Energy Services, Inc. | Determining the use of stimulation treatments based on high process zone stress |
| US20120325462A1 (en) * | 2011-06-24 | 2012-12-27 | Roussel Nicolas P | Method for Determining Spacing of Hydraulic Fractures in a Rock Formation |
| CA2841040A1 (en) | 2011-07-11 | 2013-01-17 | Schlumberger Canada Limited | System and method for performing wellbore stimulation operations |
| WO2013070315A1 (en) * | 2011-11-09 | 2013-05-16 | Exxonmobil Upstream Research Company | Drill cuttings re-injection |
| US10578766B2 (en) | 2013-08-05 | 2020-03-03 | Advantek International Corp. | Quantifying a reservoir volume and pump pressure limit |
| WO2015095557A1 (en) * | 2013-12-18 | 2015-06-25 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
| GB2580834B (en) | 2014-06-11 | 2021-03-10 | Advantek Int Corporation | Quantifying a reservoir volume and pump pressure limit |
| US10633953B2 (en) | 2014-06-30 | 2020-04-28 | Advantek International Corporation | Slurrification and disposal of waste by pressure pumping into a subsurface formation |
| US10385686B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
| US10385670B2 (en) | 2014-10-28 | 2019-08-20 | Eog Resources, Inc. | Completions index analysis |
| AU2015408182A1 (en) * | 2015-08-31 | 2018-02-08 | Halliburton Energy Services, Inc. | Integrated workflow for feasibility study of cuttings reinjection based on 3-D geomechanics analysis |
| CN106371989A (zh) * | 2016-05-06 | 2017-02-01 | 北京中电华大电子设计有限责任公司 | 一种采用批处理方式的高效安全攻击故障注入方法 |
| GB2562752B (en) * | 2017-05-24 | 2021-11-24 | Geomec Eng Ltd | Improvements in or relating to injection wells |
| US10975669B2 (en) | 2017-06-16 | 2021-04-13 | Advantek Waste Management Services, Llc | Optimizing waste slurry disposal in fractured injection operations |
| US11209558B2 (en) | 2018-05-09 | 2021-12-28 | Conocophillips Company | Measurement of poroelastic pressure response |
| CN108952700B (zh) * | 2018-08-21 | 2022-03-25 | 西南石油大学 | 一种各向异性地层井壁破裂压力确定方法 |
| CN112211622B (zh) * | 2019-07-11 | 2023-02-07 | 中国石油天然气股份有限公司 | 油藏压力场划分的方法和装置 |
| EP4062030B1 (en) * | 2019-11-21 | 2023-12-27 | ConocoPhillips Company | Well annulus pressure monitoring |
| US11790320B2 (en) * | 2020-06-25 | 2023-10-17 | Schlumberger Technology Corporation | Approaches to creating and evaluating multiple candidate well plans |
| US12523143B2 (en) | 2024-05-30 | 2026-01-13 | Halliburton Energy Services, Inc. | Addressing plug movement in hydraulic fracturing |
| US12486747B1 (en) | 2024-05-30 | 2025-12-02 | Halliburton Energy Services, Inc. | Well plug integrity |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5050674A (en) * | 1990-05-07 | 1991-09-24 | Halliburton Company | Method for determining fracture closure pressure and fracture volume of a subsurface formation |
| US6002063A (en) * | 1996-09-13 | 1999-12-14 | Terralog Technologies Inc. | Apparatus and method for subterranean injection of slurried wastes |
| US6076046A (en) | 1998-07-24 | 2000-06-13 | Schlumberger Technology Corporation | Post-closure analysis in hydraulic fracturing |
| US7440876B2 (en) * | 2004-03-11 | 2008-10-21 | M-I Llc | Method and apparatus for drilling waste disposal engineering and operations using a probabilistic approach |
| US8091625B2 (en) * | 2006-02-21 | 2012-01-10 | World Energy Systems Incorporated | Method for producing viscous hydrocarbon using steam and carbon dioxide |
| GB2500517B (en) * | 2010-12-30 | 2018-12-05 | Schlumberger Holdings | System and method for performing downhole stimulation operations |
-
2008
- 2008-09-03 BR BRPI0816851 patent/BRPI0816851A2/pt active Search and Examination
- 2008-09-03 AU AU2008299195A patent/AU2008299195B2/en not_active Ceased
- 2008-09-03 EA EA201070362A patent/EA021727B1/ru not_active IP Right Cessation
- 2008-09-03 EP EP08799094.1A patent/EP2198115B1/en not_active Not-in-force
- 2008-09-03 MX MX2010002779A patent/MX343973B/es active IP Right Grant
- 2008-09-03 US US12/677,719 patent/US20100314104A1/en not_active Abandoned
- 2008-09-03 CN CN201410356336.1A patent/CN104265211A/zh active Pending
- 2008-09-03 CA CA2699503A patent/CA2699503C/en active Active
- 2008-09-03 NO NO08799094A patent/NO2198115T3/no unknown
- 2008-09-03 CN CN200880107170A patent/CN101849080A/zh active Pending
- 2008-09-03 WO PCT/US2008/075087 patent/WO2009035884A1/en not_active Ceased
- 2008-09-12 AR ARP080103969A patent/AR068426A1/es not_active Application Discontinuation
-
2010
- 2010-03-12 CO CO10029656A patent/CO6270163A2/es not_active Application Discontinuation
Also Published As
| Publication number | Publication date |
|---|---|
| CN104265211A (zh) | 2015-01-07 |
| BRPI0816851A2 (pt) | 2015-03-17 |
| US20100314104A1 (en) | 2010-12-16 |
| EA201070362A1 (ru) | 2010-10-29 |
| CA2699503A1 (en) | 2009-03-19 |
| NO2198115T3 (es) | 2017-12-30 |
| EP2198115B1 (en) | 2017-08-02 |
| AR068426A1 (es) | 2009-11-18 |
| CO6270163A2 (es) | 2011-04-20 |
| CN101849080A (zh) | 2010-09-29 |
| CA2699503C (en) | 2015-05-05 |
| AU2008299195B2 (en) | 2012-08-23 |
| WO2009035884A1 (en) | 2009-03-19 |
| EA021727B1 (ru) | 2015-08-31 |
| EP2198115A4 (en) | 2015-12-02 |
| EP2198115A1 (en) | 2010-06-23 |
| AU2008299195A1 (en) | 2009-03-19 |
| MX343973B (es) | 2016-11-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| MX343973B (es) | Metodo de uso de firmas de presion para predecir anomalias de pozo de inyeccion. | |
| EA200870355A1 (ru) | Способ и устройство для гидравлического разрыва пласта и мониторинга | |
| MX2013012177A (es) | Determinacion de la integridad de pozos. | |
| MX2012004168A (es) | Planificacion y monitoreo de pruebas de formaciones. | |
| SA518392073B1 (ar) | أنظمة وطرق لاختبار الضغط العابر بآبار حقن بالماء لتحديد الأضرار بالخزان | |
| WO2007018858A3 (en) | Well modeling associated with extraction of hydrocarbons from subsurface formations | |
| EA200800434A1 (ru) | Моделирование скважины, связанное с добычей углеводородов из подземных формаций | |
| GB2476886A (en) | System and method for evaluation of structure-born sound | |
| UA104382C2 (ru) | Способ интерпретации распределенных температурных датчиков во время обработки ствола скважины | |
| MX2014011254A (es) | Metodo de analisis de riesgo de falla de sistema de perforacion. | |
| CA2876266C (en) | Methods and related systems of building models and predicting operational outcomes of a drilling operation | |
| EA201390132A1 (ru) | Система и способ для определения характеристик коллектора | |
| MX2015008336A (es) | Metodo de calibracion de la geometria de fractura a los eventos microsismicos. | |
| EA201270525A1 (ru) | Способ и устройство для бурения, использующие вероятностный подход | |
| MX346613B (es) | Metodo y sistema para producción de presión de poro. | |
| EA201071257A1 (ru) | Способ и система испытаний нефтяных скважин нагнетанием со смешиванием | |
| GB2476764A (en) | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations | |
| EA201270259A1 (ru) | Спобобы оценки показателей вибраций на забое при бурении по результатам измерений на поверхности | |
| MX2014005979A (es) | Deteccion y correcion de flujo de fluido no deseado ente zonas subterraneas. | |
| EA201101204A1 (ru) | Способ секвестрации флюидов в геологических формациях | |
| GB201207769D0 (en) | Method of drilling a subterranean borehole | |
| WO2010131113A3 (en) | System and method for performing wellsite containment operations | |
| NO20092917L (no) | Intelligent kompletteringsdesign for et reservoar | |
| GB2469976A (en) | Method of estinmating well disposal capacity | |
| MX390828B (es) | Deteccion dinamica de la superficie de cemento (toc) durante la cementacion de una tuberia de revestimiento en un pozo. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FG | Grant or registration |