[go: up one dir, main page]

MA34561B1 - IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH - Google Patents

IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH

Info

Publication number
MA34561B1
MA34561B1 MA34168A MA34168A MA34561B1 MA 34561 B1 MA34561 B1 MA 34561B1 MA 34168 A MA34168 A MA 34168A MA 34168 A MA34168 A MA 34168A MA 34561 B1 MA34561 B1 MA 34561B1
Authority
MA
Morocco
Prior art keywords
earth
percentage
proportion
improving
producing
Prior art date
Application number
MA34168A
Other languages
French (fr)
Inventor
Alain Lefebvre
Original Assignee
Cematerre
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cematerre filed Critical Cematerre
Publication of MA34561B1 publication Critical patent/MA34561B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • E04G11/10Forms, which are completely dismantled after setting of the concrete and re-built for next pouring of elements without beams which are mounted during erection of the shuttering to brace or couple the elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/002Workplatforms, railings; Arrangements for pouring concrete, attached to the form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/06Solidifying concrete, e.g. by application of vacuum before hardening
    • E04G21/08Internal vibrators, e.g. needle vibrators

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The method involves preparing a vertical element i.e. inner and outer vertical wall elements (12, 18), of formwork (10) determining thickness of wall to be realized and preparing an earthy material (22) to prepare a mixture comprising a silt earth i.e. clayey and/or sandy silt earth, in a proportion of 70 to 98 percentage, natural or artificial quick lime in a proportion of 1 to 10 percentage and cement in the proportion of 1 to 15 percentage for obtaining the material. A cavity (20) of the element is filled with a material, and the material is placed and dried. The formwork is removed.
MA34168A 2010-09-17 2011-09-13 IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH MA34561B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1057432A FR2964991B1 (en) 2010-09-17 2010-09-17 IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH

Publications (1)

Publication Number Publication Date
MA34561B1 true MA34561B1 (en) 2013-10-02

Family

ID=44064793

Family Applications (1)

Application Number Title Priority Date Filing Date
MA34168A MA34561B1 (en) 2010-09-17 2011-09-13 IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH

Country Status (3)

Country Link
EP (1) EP2431545A3 (en)
FR (1) FR2964991B1 (en)
MA (1) MA34561B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3016376B1 (en) 2014-01-16 2016-03-04 Cematerre NEW IMPROVEMENT TO A PROCESS FOR MANUFACTURING AT LEAST ONE VERTICAL EARTH WALL
ES2628281B1 (en) * 2015-12-22 2018-05-10 Universitat Politécnica de Catalunya Reinforced earth wall and its manufacturing method
CN114319609A (en) * 2021-12-28 2022-04-12 上海建为历保科技股份有限公司 Moisture-proof structure and method for ancient folk house wall

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2660979C (en) * 2006-08-18 2013-10-22 Sirewall Inc. Formwork and method for constructing rammed earth walls
FR2935008B1 (en) 2008-08-12 2010-09-03 Le Clos Les Perdrix PROCESS FOR PRODUCING AT LEAST ONE VERTICAL EARTH WALL

Also Published As

Publication number Publication date
EP2431545A3 (en) 2012-10-10
EP2431545A2 (en) 2012-03-21
FR2964991A1 (en) 2012-03-23
FR2964991B1 (en) 2012-10-12

Similar Documents

Publication Publication Date Title
PH12011000297A1 (en) Method for manufacturing artificial paving that help improving global warming
CO6680733A2 (en) Cementing compositions for wells and methods of preparation and use thereof
EA201490691A1 (en) METHOD OF CREATING A SUPERVISION WALL AND A RELATED SUPPORTING WALL
CN203369174U (en) Arid area side slope green recovery system
PH12017501665A1 (en) Hard road construction method for natural groundwater recharge
CN105780787A (en) Bottom column and surface hole type cast-in-place planting concrete, and preparation method and device
CN103290811A (en) Combined type groove with building formwork structure
MA34561B1 (en) IMPROVING A PROCESS FOR PRODUCING AT LEAST ONE VERTICAL LAND BASED ON EARTH
CN112942388B (en) A water inrush disaster management system and method suitable for slopes with developed fissures
ATE460538T1 (en) METHOD FOR PRODUCING SELF-COMPACTING FILLING MATERIAL
CN207436043U (en) A kind of reinforced soft soil ground device
CN103883133A (en) Heat preservation transformation technology of clay brick wall body
TW201226664A (en) Structure of water permeable brick (block) featuring ecological environment protection
CN203320484U (en) Combined-type building template structural groove body
CN202509508U (en) Base pillar surface hole type cast-in-situ planting concrete
CN205839774U (en) Flexible soil matrix frame
CN207017280U (en) A kind of simple plastics gutter
ATE412086T1 (en) METHOD FOR CONSTRUCTING A QUAY FACILITY AND QUAY FACILITY
PH12017501561A1 (en) Method to build a road
CN104594394B (en) A kind of Model Pile piling method
RU2545573C1 (en) Method to produce cracks in waterlogged clayey soils
CN103833141A (en) Mixed matrix artificial wetland system for livestock breeding sewage treatment and preparation method thereof
RU2013137887A (en) METHOD FOR CONSTRUCTION OF UNDERGROUND STRUCTURE ON WATERED AREA
CN102767167A (en) Prefabricated drainage channel
GB2441686A (en) Method of preparing a foundation structure