Wang et al., 2014 - Google Patents
High frequency vibration measurement coupled with time-based dynamic simulations: new system to predict/solve instability issuesWang et al., 2014
- Document ID
- 1898459414869790739
- Author
- Wang Y
- Shen Y
- Charter M
- Skoff G
- Publication year
- Publication venue
- SPE Annual Technical Conference and Exhibition?
External Links
Snippet
Downhole vibration is detrimental to drilling efficiency and can cause MWD/LWD tool failure, drillstring fatigue, bit/PDM damage. Preventing or mitigating BHA instability is critical to improve drilling efficiency, increase ROP and reduce drilling costs. To prevent dynamic …
- 238000005259 measurement 0 title description 36
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/42—Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits
- E21B10/43—Rotary drag type drill bits with teeth, blades or like cutting elements, e.g. fork-type bits, fish tail bits characterised by the arrangement of teeth or other cutting elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B25/00—Apparatus for obtaining or removing undisturbed cores, e.g. core barrels, core extractors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wu et al. | Decoupling stick-slip and whirl to achieve breakthrough in drilling performance | |
Wang et al. | High frequency vibration measurement coupled with time-based dynamic simulations: new system to predict/solve instability issues | |
Ledgerwood et al. | Downhole vibration measurement, monitoring, and modeling reveal stick/slip as a primary cause of PDC-bit damage in today | |
Oueslati et al. | The need for high-frequency vibration measurement along with dynamics modeling to understand the genesis of PDC bit damage | |
Hammoutene et al. | FEA modelled MSE/UCS values optimise PDC design for entire hole section | |
Schwefe et al. | Development and testing of stick/slip-resistant PDC bits | |
Chen et al. | Defining design and optimization method: dynamic simulation model produces integrated BHA solutions for efficient wellbore delivery | |
Jones et al. | Drilling Dynamics Data Recorders Now Cost-Effective for Every Operator-Compact Embedded Sensors in Bit and BHA Capture Small Data to Make the Right Decisions Fast | |
Andreas et al. | Real-time system to calculate the maximum load of high-frequency torsional oscillations independent of sensor positioning | |
Selnes et al. | Drilling difficult formations efficiently with the use of an antistall tool | |
Rahman et al. | Solving Stick-Slip Dilemma: Dynamic Modeling System Significantly Reduces Vibration, Increases ROP by 54% | |
Hohl et al. | Characterization and mitigation of mud motor vibrations | |
Algu et al. | Maximizing hole enlargement while drilling (HEWD) performance with state-of-the-art BHA dynamic analysis program and operation road map | |
Esmaeili et al. | Laboratory scale control of drilling parameters to enhance rate of penetration and reduce drill string vibration | |
Barrett et al. | Dynamic BHA modeling of hole enlargement while drilling leads to ROP improvement in Gulf of Mexico | |
Snowie et al. | Solving Swelling Clay Issues: Modeling Effort/Concentric Reamer Saves Operator Over Seven Days Rig Time vs Plan, UK North Sea | |
Murphy et al. | Deepwater Drilling in Both Hard and Abrasive Formations; The Challenges of Bit Optimisation | |
Greenwood | Improvements in the root cause analysis of drillstring vibration | |
Meyer-Heye et al. | Underreamer dynamics | |
Jones et al. | Real-Time Drilling Advisory Roadmap System Delivers Superior Performance When Used in Conjunction with Downhole Embedded Drilling Dynamics Sensors | |
Sugiura | The use of the near-bit vibration sensor while drilling leads to optimized rotary-steerable drilling in push-and point-the-bit configurations | |
Kieschnick et al. | Pre-Job Modeling/Resulting Integrated BHA System Solution Sets Multiple ROP Records, North Field Qatar | |
Niznik et al. | A new approach to stick-slip management integrating bit design and rotary-steerable-system characteristics | |
Mason et al. | The Wellbore Quality Scorecard (WQS) | |
Alemi et al. | Successfully Drilling an Extremely Complex ERD, HPHT Exploration Well |