[go: up one dir, main page]

Moselhi et al., 1994 - Google Patents

Computer simulation of concrete slab-on-grade construction

Moselhi et al., 1994

View PDF
Document ID
18190078918099575342
Author
Moselhi O
Hanson S
Publication year
Publication venue
Automation and Robotics in Construction X

External Links

Snippet

This paper presents a decision support system for contractors specialized in concrete floor finishing, making optimal use of available technology in automation. The paper presents a computer simulation model for concrete slab-on-grade construction considering different …
Continue reading at www.academia.edu (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor

Similar Documents

Publication Publication Date Title
Thomas et al. Modeling construction labor productivity
Cousineau et al. Construction robots: the search for new building technology in Japan
Olomolaiye et al. Problems influencing craftsmen's productivity in Nigeria
Arditi et al. Scheduling system for high rise building construction
Kavanagh SIREN: A repetitive construction simulation model
Huang et al. Planning gang formwork operations for building construction using simulations
Kangari et al. Potential robotics utilization in construction
Roussel et al. Digital fabrication with cement-based materials
Halpin et al. CEPM 1: lean construction and simulation
Hammad et al. Modular vs conventional construction: A multi-criteria framework approach
Shaked et al. CONSCHED: expert system for scheduling of modular construction projects
Sanvido et al. Site-level construction information system
KR102776973B1 (en) Construction method for wall and slab type structured building
Moselhi et al. Computer simulation of concrete slab-on-grade construction
Li et al. A procedure for quantitatively evaluating site layout alternatives
Bock Automation and robotics in building construction
KR101976514B1 (en) Providing method of building cost estimate
Everett Construction automation--basic task selection and development of the CRANIUM
Warszawski Robots in the construction industry
Carr et al. Basic research needs in construction engineering
Sutandi et al. Study of factors affecting productivity of pouring concrete using portable concrete pump in construction project X
Wiguna et al. Comparisonal Analysis of Formwork Costs Conventional, Semi-System and Aluminium on Shear Wall Work (Case Study: The Building of The Faculty of Art and Design Education)
Dhanasekar Identification of optimal size resources for a repetitive housing construction
Rowings Jr et al. Labor productivity modeling with neural networks
Naijit et al. The Integration of Critical Path Method and Multiple Skilled Workforce in the Repetitive Construction Project Management by Using Simulation