Kim et al., 2012 - Google Patents
Reduction of test and maintenance human errors by analyzing task characteristics and work conditionsKim et al., 2012
- Document ID
- 17678666563758364143
- Author
- Kim J
- Park J
- Publication year
- Publication venue
- Progress in Nuclear Energy
External Links
Snippet
Human errors during test and maintenance activities had a significant contribution to unplanned reactor trips of nuclear power plants. Especially, four error modes including wrong object, omission, too little, and wrong action appeared to be recurrently occurring …
- 238000000034 method 0 abstract description 124
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0267—Fault communication, e.g. human machine interface [HMI]
- G05B23/0272—Presentation of monitored results, e.g. selection of status reports to be displayed; Filtering information to the user
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0267—Fault communication, e.g. human machine interface [HMI]
- G05B23/027—Alarm generation, e.g. communication protocol; Forms of alarm
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/50—Monitoring users, programs or devices to maintain the integrity of platforms, e.g. of processors, firmware or operating systems
- G06F21/57—Certifying or maintaining trusted computer platforms, e.g. secure boots or power-downs, version controls, system software checks, secure updates or assessing vulnerabilities
- G06F21/577—Assessing vulnerabilities and evaluating computer system security
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Kim et al. | Reduction of test and maintenance human errors by analyzing task characteristics and work conditions | |
| Kang et al. | Performance shaping factor taxonomy for human reliability analysis on mitigating nuclear power plant accidents caused by extreme external hazards | |
| Kim et al. | A quantitative measure of fitness for duty and work processes for human reliability analysis | |
| Kim et al. | The effect of communication quality on team performance in digital main control room operations | |
| Zou et al. | Reliability forecasting for operators’ situation assessment in digital nuclear power plant main control room based on dynamic network model | |
| de Vasconcelos et al. | Deterministic and probabilistic safety analyses | |
| Kim et al. | How does a change in the control room design affect diagnostic strategies in nuclear power plants? | |
| Boring et al. | Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants | |
| Kosmowski et al. | Organizational culture as prerequisite of proactive safety and security management in critical infrastructure systems including hazardous plants and ports | |
| MAZLOUMI et al. | Determining Human Error Global Causes in a Petrochemical Control Room with a Cognitive Analytical Approach-CREAM | |
| Liu et al. | Implementation of human error diagnosis (HED) system | |
| Fonseca et al. | A THERP/ATHEANA Analysis of the Latent Operator Error in Leaving EFW Valves Closed in the TMI‐2 Accident | |
| Mc Leod et al. | Human error on the risk reduction actions during the NPP maintenance | |
| Holmberg et al. | Non-PSA applications of HRA | |
| Le Blanc et al. | A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies | |
| Sun et al. | Simulation-based optimization of communication protocols for reducing delays during nuclear power plant outages | |
| Guy | Best practice management of industrial process control alarm floods | |
| Holý | Some insights from recent applications of HRA methods in PSA effort and plant operation feedback in Czech Republic | |
| Carnino | Human reliability | |
| Tripputi | Artificial Events: Human Factors | |
| Scaife | Human factors in risk management | |
| Kosmowski | Human factors and functional safety analysis in designing the control rooms of industrial hazardous plants | |
| Ellis et al. | A practical application of human-hazop for critical procedures | |
| Clarke | The human face of risk | |
| Dhillon | Human Error in Power Generation |