Marshall et al., 2015 - Google Patents
Maximising economic recovery-a review of well test procedures in the North SeaMarshall et al., 2015
- Document ID
- 16962111911670217230
- Author
- Marshall C
- Thomas A
- Publication year
- Publication venue
- SPE Offshore Europe Conference and Exhibition
External Links
Snippet
One of the primary recommendations of the Wood Review is for Government and Industry to develop and commit to a new strategy for Maximising Economic Recovery from the United Kingdom Continental Shelf (UKCS). To achieve this recommendation several strategies are …
- 238000010998 test method 0 title description 4
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by the preceding groups
- G01N33/26—Investigating or analysing materials by specific methods not covered by the preceding groups oils; viscous liquids; paints; inks
- G01N33/28—Oils, i.e. hydrocarbon liquids
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F1/00—Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through the meter in a continuous flow
- G01F1/74—Devices for measuring flow of a fluid or flow of a fluent solid material in suspension in another fluid
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Poulisse et al. | Continuous well production flow monitoring and surveillance | |
Marshall et al. | Maximising economic recovery-a review of well test procedures in the North Sea | |
Hoda et al. | Well test rate conversion to compositional wellstream | |
Theuveny et al. | Multiphase flowmeter applicaton for well and fiscal allocation | |
Okon et al. | Empirical wellhead pressure-production rate correlations for Niger Delta oil wells | |
Hoda et al. | Advances in molar wellstream computation from well test measurements | |
Rebeschini et al. | Building neural-network-based models using nodal and time-series analysis for short-term production forecasting | |
Cornwall et al. | Improving Efficiency and Accuracy in Estimating Well Potential Using an Integrated Asset Operations Model | |
Maheshwari et al. | Production Optimization and Reservoir Monitoring Through Virtual Flow Metering | |
Dolle et al. | Combining testing-by-difference, geochemical fingerprinting, and data-driven models: an integrated solution to production allocation in a long subsea tieback | |
Alsaeedi et al. | Improved field production planning and cost optimization using predictive analytical choke performance model and intelligent alarms in an integrated platform | |
Jackson et al. | Operational Experience with Subsea Multiphase Flow Meters in the Pyrenees Development, Offshore Western Australia | |
Ibrahim et al. | Asset-Wide Reconciled Production Monitoring—A Key Enabler to Successful Real-Time Field Management | |
Sanyal et al. | Enhancement of Process Efficiency by Implementation of an Improved Back-Allocation Logic for Gas Volume Computation: A Case Study | |
Rubio et al. | Integrated Asset Operating Model Fosters Digital Oil Field Journey to Operational Excellence | |
Hussein et al. | Mature oilfield production surveillance and optimization using clamp-on sonarflow surveillance | |
Alsaeedi et al. | Novel Direct Multiphase Real Time Wellhead Measurement Using Wet-Gas Coriolis Technology in a Giant Gas Field-Case Study | |
Ursini et al. | Closed Looped Production Rate Evaluation by Means of Virtual Metering and Pressure Transient Analysis | |
Al-Hosani et al. | Evolution of the Smart Production Testing Strategy in ADMA-OPCO | |
Al-Mai et al. | Optimized Workflows to Assist in Managing the Sour Gases & Oil Production in North Kuwait Jurassic Fields | |
Al Yateem et al. | Flourishing Production Optimization thru the Development of an Enhanced Testing Validity Methodology | |
Gogoi et al. | Pore-to-Process Automated Production Enhancement Workflows | |
O'Reilly et al. | Assessing the Value of Reservoir Surveillance Data from Gas Fields Producing to LNG Plants Using VoI (the Value of Information) | |
Papot et al. | Harnessing the Power of AI: a Data-Driven Well Reservoir Virtual Flow Metering Tool Accessible to All | |
Rakhmetova et al. | Utilization of Digitalization Tools in Day-To-Day Operations at Tengiz |