Ouyang et al., 1990 - Google Patents
Short-term unit commitment expert systemOuyang et al., 1990
- Document ID
- 15086944124601252252
- Author
- Ouyang Z
- Shahidehpour S
- Publication year
- Publication venue
- Electric power systems research
External Links
Snippet
A heuristic rule-based approach to unit commitment is discussed in this paper. The proposed unit commitment expert system consists of a commitment schedule database, a dynamic load pattern matching process, and an inference optimization process. The …
- 238000000034 method 0 abstract description 42
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Ouyang et al. | Short-term unit commitment expert system | |
| Tong et al. | A heuristic short-term unit commitment | |
| Sheble et al. | Unit commitment literature synopsis | |
| Zurn et al. | Generator maintenance scheduling via successive approximations dynamic programming | |
| Capitanescu et al. | A new iterative approach to the corrective security-constrained optimal power flow problem | |
| Svoboda et al. | Short-term resource scheduling with ramp constraints [power generation scheduling] | |
| US8566266B2 (en) | Method for scheduling the operation of power generators using factored Markov decision process | |
| EP0904620B1 (en) | Real-time pricing control system and methods regarding same | |
| Tong et al. | Combination of Lagrangian-relaxation and linear-programming approaches for fuel-constrained unit-commitment problems | |
| Huang et al. | Fuzzy approach for generator maintenance scheduling | |
| Li et al. | Investment optimization of grid-scale energy storage for supporting different wind power utilization levels | |
| JP3332032B2 (en) | Generator operation planning device, generator operation planning method, and storage medium storing generator operation planning program | |
| Veronica et al. | Control strategies for frequency regulation in microgrids: A review | |
| JP2005102357A (en) | Method and device for preparing start/stop plan of generator, recording medium for recording process program thereof | |
| Kandil et al. | Rule-based system for determining unit locations of a developed generation expansion plan for transmission planning | |
| CN112183895B (en) | Intelligent identification and auxiliary compilation system for regional power grid maintenance plan | |
| Bunn et al. | Development of a stochastic model for the economic dispatch of electric power | |
| Salehfar et al. | Modeling and evaluation of the system reliability effects of direct load control | |
| Salehfar et al. | A production costing methodology for evaluation of direct load control | |
| Diewvilai et al. | Enhancing generation expansion planning with integration of variable renewable energy and full-year hourly multiple load levels balance constraints | |
| Allan et al. | Generator-maintenance scheduling using simplified frequency-and duration-reliability criteria | |
| VenkataSubba Reddy et al. | Cost reduction in clustering based unit commitment employing hybrid genetic-simulated annealing technique | |
| Saboya et al. | Machine learning based algorithms to dispatch multiple Rapid-Start units in AGC of power systems | |
| Gandibleux | Interactive multicriteria procedure exploiting a knowledge-based module to select electricity production alternatives: The CASTART system | |
| Delfino et al. | Knowledge-based restoration guidelines |