Kim et al., 2019 - Google Patents
A discrepancy analysis of BIM-based quantity take-off for building interior componentsKim et al., 2019
- Document ID
- 14416194389924870311
- Author
- Kim S
- Chin S
- Kwon S
- Publication year
- Publication venue
- Journal of Management in Engineering
External Links
Snippet
The more detailed building information modeling (BIM) is, the more accurate are the quantities that can be extracted in BIM-based quantity take-off. However, the time and cost typically allowed for modeling are insufficient to extract accurate quantities throughout a …
- 238000004458 analytical method 0 title description 12
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5004—Architectural design, e.g. building design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
- G06Q50/163—Property management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/34—Pipes
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kim et al. | A discrepancy analysis of BIM-based quantity take-off for building interior components | |
Atazadeh et al. | Extending a BIM-based data model to support 3D digital management of complex ownership spaces | |
Fazeli et al. | An integrated BIM-based approach for cost estimation in construction projects | |
Gourlis et al. | Building Information Modelling for analysis of energy efficient industrial buildings–A case study | |
Kim et al. | Measurement of construction BIM value based on a case study of a large-scale building project | |
Monteiro et al. | A survey on modeling guidelines for quantity takeoff-oriented BIM-based design | |
Kim et al. | Housing information modelling for BIM-embedded housing refurbishment | |
Becker et al. | Enabling BIM for property management of existing buildings based on automated As-IS capturing | |
Zhao et al. | Construction parts in building projects: definition and case study | |
Nik-Bakht et al. | BIM-based reverberation time analysis. | |
Park et al. | BIM application and adoption in the UK housing sector | |
Felisberto et al. | BIM cost estimation guidelines for Brazilian public sector infrastructure | |
CN117668984B (en) | Virtual smart package rapid calculation method and system based on Revit scheme model | |
Yusuf et al. | Identification of the potentials and barriers of adopting standard method of measurement for mechanical and electrical services in Malaysia | |
Kim et al. | A verification of the accuracy in BIM-based quantity taking-off-Focusing on finishing work | |
Sharif et al. | Masonry unit database development for BIM-masonry | |
Berdeja | Conflict analyses in a BIM based design | |
Drogemuller | Testing collaboration using IFC based software | |
Ho Song et al. | Empirical determination of the smallest batch sizes for daily planning | |
Wardle et al. | Prioritising Quality, Literature Review of Common Residential Housing Defects | |
Paton-Cole et al. | A review of defects in low-rise residential buildings in the Australian State of Victoria | |
KR100789252B1 (en) | Ready-made process system and method in connection with process management | |
Di Bella | Application of BIM Model Checking in building acoustic design | |
Eroğlu | Evaluation of the reliability of BIM-based quantity take-off processes in construction projects | |
Johnson et al. | Experimental building information models |