Youhannaei et al., 2017 - Google Patents
Power quality observation algorithm to power distribution networkYouhannaei et al., 2017
View HTML- Document ID
- 13558948955498118895
- Author
- Youhannaei M
- Mokhtari H
- Honarmand M
- Talebi J
- Sharifi A
- Publication year
- Publication venue
- CIRED 24
External Links
Snippet
Nowadays, the number of non-linear loads is increasing dramatically. Such loads not only cause power quality problem but also are sensitive to them. Accordingly, the measurement and analysis of power quality indices have received much attention. Owing to financial and …
- 238000000034 method 0 abstract description 27
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/02—Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
- G06Q30/0202—Market predictions or demand forecasting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Waeresch et al. | Field test of a linear three-phase low-voltage state estimation system based on smart meter data | |
Escalera et al. | Analytical method to assess the impact of distributed generation and energy storage on reliability of supply | |
Blanco et al. | Harmonic, interharmonic and supraharmonic characterisation of a 12 MW wind park based on field measurements | |
Kaloudas et al. | Long-term forecasting of reactive power demand in distribution networks | |
Khazaee et al. | Distribution loss reduction in residential and commercial pilots by using AMI system | |
Lennerhag et al. | Using measurements to increase the accuracy of hosting capacity calculations | |
Lennerhag et al. | Performance indicators for quantifying the ability of the grid to host renewable electricity production | |
Greenwood et al. | Pragmatic method for assessing the security of supply in future smart distribution networks | |
Youhannaei et al. | Power quality observation algorithm to power distribution network | |
van de Sande et al. | ANDES: grid capacity planning using a bottom-up, profile-based load forecasting approach | |
Verdelho et al. | Impact of PV distributed generation on EDP distribuição LV grid losses | |
Tang et al. | Assessment of the impact of demand-side management on distribution network voltage stability | |
Roark et al. | Measuring the value of microgrids: a benefit–cost framework | |
Buire et al. | Combination of linear power flow tools for voltages and power estimation on MV networks | |
Peppanen et al. | Integrating energy storage as a non-wires alternative for distribution capacity | |
Poursharif et al. | Analysing the ability of smart meter data to provide accurate information to the UK DNOs | |
Gržanić et al. | Renewable energies integration in a DiNeMo model based on a German urban grid | |
Kauppinen et al. | Experiences of using AMI system for DSO's business operation | |
Nagumo et al. | Load current forecasting using statistical analysis | |
Kaspirek et al. | Analysis of voltage quality parameters in MV distribution grid | |
Bahramara et al. | Optimal sizing of distribution network transformers considering power quality problems of non-linear loads | |
Kaspirek et al. | Analysis of voltage quality parameters in LV distribution grids with connected distributed energy sources | |
Baricevic et al. | Identifying energy efficiency improvements and savings potential in Croatian energy networks | |
Baumgartner et al. | Monitoring concept suitable for utilising flexibilities in the low-voltage distribution grid: Learning from implementation in Greencity Zurich | |
Jurado et al. | Regulation for insertion of small-scale intermittent renewable energy distributed generation in Argentina |