Peterson et al., 2022 - Google Patents
Tools for Risk-Based Pipeline ManagementPeterson et al., 2022
- Document ID
- 13071864069789078898
- Author
- Peterson K
- Nardini P
- Publication year
- Publication venue
- Pipelines 2022
External Links
Snippet
ABSTRACT A risk-based asset management approach facilitates maintaining acceptable pipeline reliability at minimum cost. This paper presents tools to support a risk-based approach for pipeline management, so pipeline owners can make easier, informed …
- 238000007689 inspection 0 abstract description 2
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
- G01M3/26—Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
- G01M3/28—Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves for welds
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12398847B2 (en) | System for providing integrated pipeline integrity data | |
| Bhatia et al. | Dynamic risk-based inspection methodology | |
| Xie et al. | Risk-based pipeline re-assessment optimization considering corrosion defects | |
| Romer et al. | Failure of prestressed concrete cylinder pipe | |
| Peterson et al. | Tools for Risk-Based Pipeline Management | |
| Hopkins et al. | A Method for the Monitoring and Management of Pipeline Risk–A Simple Pipeline Risk Audit (SPRA) | |
| Koduru et al. | Review of Quantitative Reliability Methods for Onshore Oil and Gas Pipelines | |
| Lubis et al. | Risk Assessment of Gas Pipeline using Risk based Inpection and Fault Tree Analysis | |
| Trasatti | Risk-based inspection and integrity Management of Pipeline Systems | |
| El Chanati | Performance assessment of water network infrastructure | |
| Hameed et al. | An overview of risk-based inspection planning for flexible pipeline | |
| Marley et al. | RBI planning for pipelines | |
| Davis et al. | Quantifying economic lifetime for asset management of large diameter pipelines | |
| Nardini et al. | Criticality Ranking and Condition Assessment of PCCP | |
| Kaddoura et al. | Strategic Approach in the Assessment of Watermains Using Indirect and Direct Methods | |
| Martin | methods of prevention, detection and control of spillages in european oil pipelines | |
| Candreva et al. | Safety Guidelines and Good Industry Practices for Oil Terminals | |
| Titti et al. | Integrity management during offshore pipeline lifetime | |
| Kulhawy et al. | Risk-Based Integrity Decision Making for Lateral Piping | |
| Tuft et al. | Benchmarking pipeline risk assessment processes | |
| Williams et al. | Buried a While Longer—Practical Strategies for Pressure Pipe Assessment and Renewal | |
| Henderson et al. | Extending the life of ageing pipelines | |
| Silva et al. | From Data to Decisions: Empowering Pipeline Operators with Actionable Insights | |
| Mott et al. | Managing 700 mi of Transmission Mains | |
| Koduru et al. | Guidelines for quantitative risk model development |