Goyal et al., 2016 - Google Patents
Asset health management using predictive and prescriptive analytics for the electric power gridGoyal et al., 2016
- Document ID
- 12554760620646807638
- Author
- Goyal A
- Aprilia E
- Janssen G
- Kim Y
- Kumar T
- Mueller R
- Phan D
- Raman A
- Schuddebeurs J
- Xiong J
- Zhang R
- Publication year
- Publication venue
- IBM Journal of Research and Development
External Links
Snippet
Electric utilities make up an asset-intensive industry with a broad geographical spread of assets, such as poles, transformers, cables, and switchgear. The utilities face a backlog of aging assets that are pending replacement. Increasingly, a consensus has been reached on …
- 230000032683 aging 0 abstract description 36
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce, e.g. shopping or e-commerce
- G06Q30/02—Marketing, e.g. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards; Price estimation or determination
- G06Q30/0202—Market predictions or demand forecasting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N99/00—Subject matter not provided for in other groups of this subclass
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/008—Circuit arrangements for ac mains or ac distribution networks involving trading of energy or energy transmission rights
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Goyal et al. | Asset health management using predictive and prescriptive analytics for the electric power grid | |
Wang et al. | On machine learning-based techniques for future sustainable and resilient energy systems | |
Khuntia et al. | A literature survey on asset management in electrical power [transmission and distribution] system | |
Abiri-Jahromi et al. | A two-stage framework for power transformer asset maintenance management—Part I: Models and formulations | |
US7945524B2 (en) | System and method for grading electricity distribution network feeders susceptible to impending failure | |
US10025337B2 (en) | Method and system for managing an electrical distribution system in a facility | |
Jiang et al. | Risk-based resource optimization for transmission system maintenance | |
Ge et al. | Reliability and maintainability improvement of substations with aging infrastructure | |
Amini et al. | Electrical energy systems resilience: A comprehensive review on definitions, challenges, enhancements and future proceedings | |
Moradkhani et al. | Risk-based maintenance scheduling in the presence of reward penalty scheme | |
Xie et al. | Massively digitized power grid: Opportunities and challenges of use-inspired AI | |
Feng et al. | Optimal maintenance scheduling of power producers considering unexpected unit failure | |
Dehghani et al. | Defining a new index to compare the resilience of different structures of an electrical energy network | |
Koziel et al. | Application of big data analytics to support power networks and their transition towards smart grids | |
Shafiee et al. | A multi-criteria decision model to mitigate the operational risks of offshore wind infrastructures | |
Mahmoudi et al. | A maintenance optimzation policy for an electric power distribution system: case of the HV/MV substations | |
Kumar et al. | Power system resilience quantification and enhancement strategy for real-time operation | |
Schwalbe | Mathematical Sciences Research Challenges for the Next-Generation Electric Grid: Summary of a Workshop | |
van Schijndel | Power transformer reliability modelling | |
Belmont et al. | Digital Asset Performance Management—Taking Utility Asset Management to the Next Level | |
Zhuang | Managing risks in electrical infrastructure assets from a strategic perspective | |
Klerx et al. | Advanced replacement strategies for low voltage distribution grids | |
Scarpellini et al. | Innovative analytics to estimate the probability of failure and remaining useful life of medium-voltage breakers | |
Adoghe | Reliability centered maintenance (RCM) for asset management in electric power distribution system | |
Buechner et al. | Automated network reinforcement including a model for an asset management strategy |