[go: up one dir, main page]

Aslam et al., 2021 - Google Patents

Economic determination of modified multiple dependent state sampling plan under some lifetime distributions

Aslam et al., 2021

View PDF @Full View
Document ID
12039216938597357070
Author
Aslam M
Jeyadurga P
Balamurali S
Azam M
Al-Marshadi A
Publication year
Publication venue
Journal of Mathematics

External Links

Snippet

In this paper, the modification of multiple dependent state sampling plan is proposed and designed for assuring a mean lifetime of the products under Birnbaum–Saunders distribution and Weibull distribution. The optimal parameters of the proposed plan are …
Continue reading at onlinelibrary.wiley.com (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • G06F17/30286Information retrieval; Database structures therefor; File system structures therefor in structured data stores
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/30Information retrieval; Database structures therefor; File system structures therefor
    • G06F17/30861Retrieval from the Internet, e.g. browsers
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06NCOMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N99/00Subject matter not provided for in other groups of this subclass
    • G06N99/005Learning machines, i.e. computer in which a programme is changed according to experience gained by the machine itself during a complete run
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by the preceding groups
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06NCOMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N5/00Computer systems utilising knowledge based models
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes

Similar Documents

Publication Publication Date Title
Aslam et al. Economic determination of modified multiple dependent state sampling plan under some lifetime distributions
Clark et al. Spatial convergent cross mapping to detect causal relationships from short time series
Wu et al. A novel lot sentencing method by variables inspection considering multiple dependent state
Ghashghaei et al. Effect of measurement error on joint monitoring of process mean and variability under ranked set sampling
Adeoti et al. Attribute control chart for Rayleigh distribution using repetitive sampling under truncated life test
Wu et al. Planning step‐stress life test with progressively type I group‐censored exponential data
Khan et al. A new variable control chart under failure‐censored reliability tests for Weibull distribution
Abbasi Poisson progressive mean control chart
Balamurali et al. Economic design of quick switching sampling system for assuring Weibull distributed mean life
Méndez‐González et al. Reliability analysis using exponentiated Weibull distribution and inverse power law
Aslam Product acceptance determination with measurement error using the neutrosophic statistics
Balamurali et al. Optimal designing of variables chain sampling plan by minimizing the average sample number
Balamurali et al. Optimal designing of a multiple deferred state sampling plan for Weibull distributed life time assuring mean life
Wang et al. Dependent mixed and mixed repetitive sampling plans for linear profiles
Li et al. Comparison and optimization of various moving patient‐based real‐time quality control procedures for serum sodium
Aslam et al. Design of a Control Chart Based on COM‐Poisson Distribution for the Uncertainty Environment
Abubakar et al. A new exponentially weighted moving average chart with an adaptive control scheme for high yield processes—An application in injection molding process
Yan et al. Designing a repetitive group sampling plan for Weibull distributed processes
Wang A single sampling plan based on exponentially weighted moving average model for linear profiles
Balamurali A new mixed chain sampling plan based on the process capability index for product acceptance
Liu et al. Integration method for reliability assessment with multi-source incomplete accelerated degradation testing data
Arif et al. A new generalized range control chart for the Weibull distribution
Li et al. Mixed variables‐attributes test plans for single and double acceptance sampling under exponential distribution
Chew et al. An improved Hotelling's T 2 chart for monitoring a finite horizon process based on run rules schemes: A Markov‐chain approach
Riaz et al. On efficient skewness correction charts under contamination and non‐normality