Peta, 2019 - Google Patents
Ross Substation Upgrade: Maintaining Power Transfer Capability and ReliabilityPeta, 2019
- Document ID
- 11903129941760567356
- Author
- Peta S
- Publication year
External Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/54—Store-and-forward switching systems
- H04L12/58—Message switching systems, e.g. electronic mail systems
- H04L12/5825—Message adaptation based on network or terminal capabilities
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L51/00—Arrangements for user-to-user messaging in packet-switching networks, e.g. e-mail or instant messages
- H04L51/06—Message adaptation based on network or terminal capabilities
- H04L51/066—Message adaptation based on network or terminal capabilities with adaptation of format
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network-specific arrangements or communication protocols supporting networked applications
- H04L67/28—Network-specific arrangements or communication protocols supporting networked applications for the provision of proxy services, e.g. intermediate processing or storage in the network
- H04L67/2823—Network-specific arrangements or communication protocols supporting networked applications for the provision of proxy services, e.g. intermediate processing or storage in the network for conversion or adaptation of application content or format
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network-specific arrangements or communication protocols supporting networked applications
- H04L67/10—Network-specific arrangements or communication protocols supporting networked applications in which an application is distributed across nodes in the network
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/107—Computer aided management of electronic mail
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network-specific arrangements or communication protocols supporting networked applications
- H04L67/02—Network-specific arrangements or communication protocols supporting networked applications involving the use of web-based technology, e.g. hyper text transfer protocol [HTTP]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L12/00—Data switching networks
- H04L12/02—Details
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L51/00—Arrangements for user-to-user messaging in packet-switching networks, e.g. e-mail or instant messages
- H04L51/38—Arrangements for user-to-user messaging in packet-switching networks, e.g. e-mail or instant messages in combination with wireless systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Peta | Ross Substation Upgrade: Maintaining Power Transfer Capability and Reliability | |
Peta | Powerlink Bouldercombe Substation: Maintaining Reliability of Supply-Project Assessment Conclusions Report | |
Peta | Powerlink Qld: Addressing Secondary System Risks at Chalumbin Substation | |
Peta | Townsville South Substation Reliability Project: Project Assessment Conclusions Report | |
Peta | Powerlink Innisfail Substation Secondary Systems Upgrade: Project Assessment Conclusions Report | |
Peta | Powerlink Queensland: Gladstone South Secondary Systems Upgrade-Project Assessment Conclusions Report | |
Murphy | Sumner Substation Secondary System Upgrade: Project Assessment Conclusions | |
Peta | Innisfail Substation Secondary Systems Upgrade: Project Specification Consultation Report Summary | |
Peta | Powerlink Queensland: Mudgeeraba Substation Secondary Systems Upgrade-Project Assessment Conclusions Report | |
Peta | Powerlink Redbank Plains Substation Upgrade: Project Assessment Conclusions Report | |
Peta | Powerlink Cairns Substation Secondary Systems Upgrade: PSCR Summary | |
Peta | Powerlink Queensland: Maintaining Brisbane Metropolitan Area Reliability | |
Caroline | Liverpool Substation Secondary Systems Upgrade: RIT-T Project Assessment Conclusions Report | |
Murphy | Powerlink: Maintaining Reliability of Supply to Mansfield-Project Assessment Conclusions Report | |
Bray | Liverpool Substation Secondary Systems Compliance: RIT-T Project Specification Consultation | |
Vero | Lower Tumut Substation Secondary Systems Compliance: RIT-T Project Assessment Conclusions Report | |
Ruston | Inverell Substation Upgrade: RIT-T Project Specification Consultation Report | |
Peta | Powerlink QLD: Blackwater Substation Reliability Upgrade-Project Assessment | |
Peta | Powerlink Kamerunga Substation Reliability Upgrade: Project Consultation | |
Peta | Powerlink Queensland: Brisbane Transmission Line Reliability Project-Consultation Report Summary | |
Allen | Directlink IGBT Failure Risk Management: Project Assessment Draft Report | |
Peta | Powerlink QLD: Maintaining Reliability at Kamerunga Substation-Project Assessment Conclusions Report | |
Caroline | Managing Asset Risks at Forbes Substation: RIT-T Project Assessment Conclusions Report | |
Caroline | Deniliquin Substation Secondary Systems Upgrade: RIT-T Project Assessment Conclusions Report | |
Reid | Queensland Power System Incident: Calvale-Wurdong Transmission Line Trip, June 2019 |