[go: up one dir, main page]

Peta, 2019 - Google Patents

Ross Substation Upgrade: Maintaining Power Transfer Capability and Reliability

Peta, 2019

Document ID
11903129941760567356
Author
Peta S
Publication year

External Links

Continue reading at scholar.google.com (other versions)

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/54Store-and-forward switching systems
    • H04L12/58Message switching systems, e.g. electronic mail systems
    • H04L12/5825Message adaptation based on network or terminal capabilities
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L51/00Arrangements for user-to-user messaging in packet-switching networks, e.g. e-mail or instant messages
    • H04L51/06Message adaptation based on network or terminal capabilities
    • H04L51/066Message adaptation based on network or terminal capabilities with adaptation of format
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network-specific arrangements or communication protocols supporting networked applications
    • H04L67/28Network-specific arrangements or communication protocols supporting networked applications for the provision of proxy services, e.g. intermediate processing or storage in the network
    • H04L67/2823Network-specific arrangements or communication protocols supporting networked applications for the provision of proxy services, e.g. intermediate processing or storage in the network for conversion or adaptation of application content or format
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network-specific arrangements or communication protocols supporting networked applications
    • H04L67/10Network-specific arrangements or communication protocols supporting networked applications in which an application is distributed across nodes in the network
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/107Computer aided management of electronic mail
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network-specific arrangements or communication protocols supporting networked applications
    • H04L67/02Network-specific arrangements or communication protocols supporting networked applications involving the use of web-based technology, e.g. hyper text transfer protocol [HTTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L51/00Arrangements for user-to-user messaging in packet-switching networks, e.g. e-mail or instant messages
    • H04L51/38Arrangements for user-to-user messaging in packet-switching networks, e.g. e-mail or instant messages in combination with wireless systems
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
    • G06Q50/10Services

Similar Documents

Publication Publication Date Title
Peta Ross Substation Upgrade: Maintaining Power Transfer Capability and Reliability
Peta Powerlink Bouldercombe Substation: Maintaining Reliability of Supply-Project Assessment Conclusions Report
Peta Powerlink Qld: Addressing Secondary System Risks at Chalumbin Substation
Peta Townsville South Substation Reliability Project: Project Assessment Conclusions Report
Peta Powerlink Innisfail Substation Secondary Systems Upgrade: Project Assessment Conclusions Report
Peta Powerlink Queensland: Gladstone South Secondary Systems Upgrade-Project Assessment Conclusions Report
Murphy Sumner Substation Secondary System Upgrade: Project Assessment Conclusions
Peta Innisfail Substation Secondary Systems Upgrade: Project Specification Consultation Report Summary
Peta Powerlink Queensland: Mudgeeraba Substation Secondary Systems Upgrade-Project Assessment Conclusions Report
Peta Powerlink Redbank Plains Substation Upgrade: Project Assessment Conclusions Report
Peta Powerlink Cairns Substation Secondary Systems Upgrade: PSCR Summary
Peta Powerlink Queensland: Maintaining Brisbane Metropolitan Area Reliability
Caroline Liverpool Substation Secondary Systems Upgrade: RIT-T Project Assessment Conclusions Report
Murphy Powerlink: Maintaining Reliability of Supply to Mansfield-Project Assessment Conclusions Report
Bray Liverpool Substation Secondary Systems Compliance: RIT-T Project Specification Consultation
Vero Lower Tumut Substation Secondary Systems Compliance: RIT-T Project Assessment Conclusions Report
Ruston Inverell Substation Upgrade: RIT-T Project Specification Consultation Report
Peta Powerlink QLD: Blackwater Substation Reliability Upgrade-Project Assessment
Peta Powerlink Kamerunga Substation Reliability Upgrade: Project Consultation
Peta Powerlink Queensland: Brisbane Transmission Line Reliability Project-Consultation Report Summary
Allen Directlink IGBT Failure Risk Management: Project Assessment Draft Report
Peta Powerlink QLD: Maintaining Reliability at Kamerunga Substation-Project Assessment Conclusions Report
Caroline Managing Asset Risks at Forbes Substation: RIT-T Project Assessment Conclusions Report
Caroline Deniliquin Substation Secondary Systems Upgrade: RIT-T Project Assessment Conclusions Report
Reid Queensland Power System Incident: Calvale-Wurdong Transmission Line Trip, June 2019