[go: up one dir, main page]

Jang et al., 2001 - Google Patents

A look-ahead routing procedure for machine selection in a highly informative manufacturing system

Jang et al., 2001

Document ID
10146537071607328638
Author
Jang J
Suh J
Park N
Liu R
Publication year
Publication venue
International Journal of Flexible Manufacturing Systems

External Links

Snippet

Many dispatching rules have been developed for the on-line control of product flow in a job shop. The introduction of a highly informative manufacturing system (HIMS) has added a new requirement to a classical job-shop control problem: the selection of machines by parts …
Continue reading at link.springer.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/45Nc applications
    • G05B2219/45031Manufacturing semiconductor wafers
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M3/00Automatic or semi-automatic exchanges
    • H04M3/42Systems providing special services or facilities to subscribers
    • H04M3/50Centralised arrangements for answering calls; Centralised arrangements for recording messages for absent or busy subscribers ; Centralised arrangements for recording messages
    • H04M3/51Centralised call answering arrangements requiring operator intervention, e.g. call or contact centers for telemarketing
    • H04M3/523Centralised call answering arrangements requiring operator intervention, e.g. call or contact centers for telemarketing with call distribution or queueing
    • H04M3/5232Call distribution algorithms
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders

Similar Documents

Publication Publication Date Title
Ahmed et al. Due date assignment, job order release, and sequencing interaction in job shop scheduling
Johri Practical issues in scheduling and dispatching in semiconductor wafer fabrication
Gershwin Design and operation of manufacturing systems: the control-point policy
Chen et al. Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication
CN103439885B (en) Semiconductor production line Optimized Operation device
US7206652B2 (en) Method and system for intelligent automated reticle management
US20020065700A1 (en) Method and system for allocating personnel and resources to efficiently complete diverse work assignments
Hung et al. A multi-class multi-level capacitated lot sizing model
Tung et al. Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems
US6920366B1 (en) Heuristics for efficient supply chain planning in a heterogeneous production line
Chiang et al. Modeling, scheduling, and performance evaluation for wafer fabrication: a queueing colored Petri-net and GA-based approach
Gupta et al. Simulation based multiobjective schedule optimization in semiconductor manufacturing
Koo et al. A review on control strategies of batch processing machines in semiconductor manufacturing
Yang et al. Multiobjective scheduling for IC sort and test with a simulation testbed
Yoon et al. A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints
Jang et al. A look-ahead routing procedure for machine selection in a highly informative manufacturing system
Ben-Arieh et al. Knowledge based routing and sequencing for discrete part production
Brown et al. Queueing model improves IBM's semiconductor capacity and lead-time management
US7477957B2 (en) Method and system of controlled movement of dynamic-route WIP
Yan et al. Robustness of various production control policies in semiconductor manufacturing
Sabuncuoğlu et al. An evaluative study of operation grouping policies in an FMS
Baykasoğlu et al. Flow time analyses of a simulated flexible job shop by considering jockeying
Jang et al. A Look-Ahead Routing Procedure in an FMS
Shmilovici et al. Heuristics for Dynamic Selection and Routing of Parts in an FMS
Huang et al. Modeling, scheduling, and prediction for wafer fabrication: queueing colored Petri-net and GA based approach