Jang et al., 2001 - Google Patents
A look-ahead routing procedure for machine selection in a highly informative manufacturing systemJang et al., 2001
- Document ID
- 10146537071607328638
- Author
- Jang J
- Suh J
- Park N
- Liu R
- Publication year
- Publication venue
- International Journal of Flexible Manufacturing Systems
External Links
Snippet
Many dispatching rules have been developed for the on-line control of product flow in a job shop. The introduction of a highly informative manufacturing system (HIMS) has added a new requirement to a classical job-shop control problem: the selection of machines by parts …
- 238000000034 method 0 title abstract description 60
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/45—Nc applications
- G05B2219/45031—Manufacturing semiconductor wafers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04M—TELEPHONIC COMMUNICATION
- H04M3/00—Automatic or semi-automatic exchanges
- H04M3/42—Systems providing special services or facilities to subscribers
- H04M3/50—Centralised arrangements for answering calls; Centralised arrangements for recording messages for absent or busy subscribers ; Centralised arrangements for recording messages
- H04M3/51—Centralised call answering arrangements requiring operator intervention, e.g. call or contact centers for telemarketing
- H04M3/523—Centralised call answering arrangements requiring operator intervention, e.g. call or contact centers for telemarketing with call distribution or queueing
- H04M3/5232—Call distribution algorithms
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ahmed et al. | Due date assignment, job order release, and sequencing interaction in job shop scheduling | |
Johri | Practical issues in scheduling and dispatching in semiconductor wafer fabrication | |
Gershwin | Design and operation of manufacturing systems: the control-point policy | |
Chen et al. | Petri-net and GA-based approach to modeling, scheduling, and performance evaluation for wafer fabrication | |
CN103439885B (en) | Semiconductor production line Optimized Operation device | |
US7206652B2 (en) | Method and system for intelligent automated reticle management | |
US20020065700A1 (en) | Method and system for allocating personnel and resources to efficiently complete diverse work assignments | |
Hung et al. | A multi-class multi-level capacitated lot sizing model | |
Tung et al. | Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems | |
US6920366B1 (en) | Heuristics for efficient supply chain planning in a heterogeneous production line | |
Chiang et al. | Modeling, scheduling, and performance evaluation for wafer fabrication: a queueing colored Petri-net and GA-based approach | |
Gupta et al. | Simulation based multiobjective schedule optimization in semiconductor manufacturing | |
Koo et al. | A review on control strategies of batch processing machines in semiconductor manufacturing | |
Yang et al. | Multiobjective scheduling for IC sort and test with a simulation testbed | |
Yoon et al. | A multiagent-based decision-making system for semiconductor wafer fabrication with hard temporal constraints | |
Jang et al. | A look-ahead routing procedure for machine selection in a highly informative manufacturing system | |
Ben-Arieh et al. | Knowledge based routing and sequencing for discrete part production | |
Brown et al. | Queueing model improves IBM's semiconductor capacity and lead-time management | |
US7477957B2 (en) | Method and system of controlled movement of dynamic-route WIP | |
Yan et al. | Robustness of various production control policies in semiconductor manufacturing | |
Sabuncuoğlu et al. | An evaluative study of operation grouping policies in an FMS | |
Baykasoğlu et al. | Flow time analyses of a simulated flexible job shop by considering jockeying | |
Jang et al. | A Look-Ahead Routing Procedure in an FMS | |
Shmilovici et al. | Heuristics for Dynamic Selection and Routing of Parts in an FMS | |
Huang et al. | Modeling, scheduling, and prediction for wafer fabrication: queueing colored Petri-net and GA based approach |