de Mattos et al. - Google Patents
Structural Sizing for EDP Valve Body for HPHT Wellheadde Mattos et al.
View PDF- Document ID
- 9422255690484703736
- Author
- de Mattos J
- Lúcio L
- de Melo Araújo M
- Fernandez J
External Links
Snippet
The reduction in production from active oil wells in Brazil and the depletion of reservoirs have driven research into deep-sea reservoirs, especially on the Brazilian equatorial margin and in projects such as Sergipe-Águas-Profundas. This work aims to design an EDP valve …
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
- E21B33/061—Ram-type blow-out preventers, e.g. with pivoting rams
- E21B33/062—Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B2033/005—Sealings characterised by their shape
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
- E21B29/08—Cutting or deforming pipes to control fluid flow
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Skogdalen et al. | Developing safety indicators for preventing offshore oil and gas deepwater drilling blowouts | |
| Chang et al. | Comprehensive risk assessment of deepwater drilling riser using fuzzy Petri net model | |
| Skogdalen et al. | Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study | |
| Ahmed et al. | Failure mechanisms of the wellbore mechanical barrier systems: Implications for well integrity | |
| Han et al. | Study of the damage and failure of the shear ram of the blowout preventer in the shearing process | |
| Lao et al. | Analysis of salt creep and well casing damage in high pressure and high temperature environments | |
| Guo et al. | Fatigue optimization of rotary control head rubber core based on steady sealing | |
| Zheng et al. | Finite element analysis and experimental study on the deformation characteristics of an aluminum alloy fracturing ball | |
| Yu et al. | An integration method for assessing the operational reliability of underground gas storage in a depleted reservoir | |
| Wang et al. | Failure mechanism analysis of ram BOP in HTHP gas well and mitigation measures | |
| US12146405B2 (en) | Well integrity safety factor for evaluating threaded connections during well operations | |
| Liu et al. | Failure analysis of ram body and sealing performance of semi-sealed blowout preventer | |
| EA016454B1 (en) | Method for reinforcing of irregular pressure vessels | |
| de Mattos et al. | Structural Sizing for EDP Valve Body for HPHT Wellhead | |
| Kirkemo | Structural design of metallic components in ISO 13628-7 | |
| Tang et al. | Study on shear fracture performance of subsea test tree under emergency conditions in the deepwater oil and gas completion testing | |
| Lehr et al. | The High-Pressure/High-Temperature Completion Landscape—Yesterday, Today, and Tomorrow | |
| Koutsolelos | Numerical analysis of a shear ram and experimental determination of fracture parameters | |
| Mendes et al. | An integrity analysis approach for development wells | |
| He et al. | Mechanical properties and sealing performance evaluation of packers in high temperature underground gas storage | |
| Vignes | Qualification of well barrier elements-test medium, test temperatures and long-term integrity | |
| Patel et al. | Developing Sensitivity Response Curves to Evaluate Mechanical Integrity of Set Cement | |
| Ma | Integrity Management and Risk Control of Gas Storage Facilities | |
| C. Karlapalem et al. | Intervention and Completion Landing String Qualification for HPHT Application | |
| Xie | Investigation of Casing Connection Failure Mechanisms in Thermal Wells |