[go: up one dir, main page]

de Mattos et al. - Google Patents

Structural Sizing for EDP Valve Body for HPHT Wellhead

de Mattos et al.

View PDF
Document ID
9422255690484703736
Author
de Mattos J
Lúcio L
de Melo Araújo M
Fernandez J

External Links

Snippet

The reduction in production from active oil wells in Brazil and the depletion of reservoirs have driven research into deep-sea reservoirs, especially on the Brazilian equatorial margin and in projects such as Sergipe-Águas-Profundas. This work aims to design an EDP valve …
Continue reading at grcmlesydpcd.objectstorage.sa-saopaulo-1.oci.customer-oci.com (PDF) (other versions)

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/06Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
    • E21B33/061Ram-type blow-out preventers, e.g. with pivoting rams
    • E21B33/062Ram-type blow-out preventers, e.g. with pivoting rams with sliding rams
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B2033/005Sealings characterised by their shape
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/08Cutting or deforming pipes to control fluid flow
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/02Couplings; joints
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00

Similar Documents

Publication Publication Date Title
Skogdalen et al. Developing safety indicators for preventing offshore oil and gas deepwater drilling blowouts
Chang et al. Comprehensive risk assessment of deepwater drilling riser using fuzzy Petri net model
Skogdalen et al. Quantitative risk analysis of oil and gas drilling, using Deepwater Horizon as case study
Ahmed et al. Failure mechanisms of the wellbore mechanical barrier systems: Implications for well integrity
Han et al. Study of the damage and failure of the shear ram of the blowout preventer in the shearing process
Lao et al. Analysis of salt creep and well casing damage in high pressure and high temperature environments
Guo et al. Fatigue optimization of rotary control head rubber core based on steady sealing
Zheng et al. Finite element analysis and experimental study on the deformation characteristics of an aluminum alloy fracturing ball
Yu et al. An integration method for assessing the operational reliability of underground gas storage in a depleted reservoir
Wang et al. Failure mechanism analysis of ram BOP in HTHP gas well and mitigation measures
US12146405B2 (en) Well integrity safety factor for evaluating threaded connections during well operations
Liu et al. Failure analysis of ram body and sealing performance of semi-sealed blowout preventer
EA016454B1 (en) Method for reinforcing of irregular pressure vessels
de Mattos et al. Structural Sizing for EDP Valve Body for HPHT Wellhead
Kirkemo Structural design of metallic components in ISO 13628-7
Tang et al. Study on shear fracture performance of subsea test tree under emergency conditions in the deepwater oil and gas completion testing
Lehr et al. The High-Pressure/High-Temperature Completion Landscape—Yesterday, Today, and Tomorrow
Koutsolelos Numerical analysis of a shear ram and experimental determination of fracture parameters
Mendes et al. An integrity analysis approach for development wells
He et al. Mechanical properties and sealing performance evaluation of packers in high temperature underground gas storage
Vignes Qualification of well barrier elements-test medium, test temperatures and long-term integrity
Patel et al. Developing Sensitivity Response Curves to Evaluate Mechanical Integrity of Set Cement
Ma Integrity Management and Risk Control of Gas Storage Facilities
C. Karlapalem et al. Intervention and Completion Landing String Qualification for HPHT Application
Xie Investigation of Casing Connection Failure Mechanisms in Thermal Wells