Hegab et al., 2007 - Google Patents
Delay time analysis in microtunneling projectsHegab et al., 2007
View PDF- Document ID
- 8158246982340359716
- Author
- Hegab M
- Smith G
- Publication year
- Publication venue
- Journal of Construction Engineering and Management
External Links
Snippet
Delay in microtunneling projects is a complex multivariate problem. Delay in microtunneling is defined as the nonworking time of a microtunneling project due to any reason other than scheduled stops. There are many reasons for delay such as mechanical failure of system …
- 238000004458 analytical method 0 title abstract description 11
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Silva et al. | Probability and risk of slope failure | |
Ökmen et al. | Construction project network evaluation with correlated schedule risk analysis model | |
Al-Barqawi et al. | Infrastructure management: Integrated AHP/ANN model to evaluate municipal water mains’ performance | |
Pulaski et al. | Organizing constructability knowledge for design | |
Bai et al. | Probabilistic assessment of structural damage due to earthquakes for buildings in Mid-America | |
Asmar et al. | New approach to developing conceptual cost estimates for highway projects | |
Vardanega et al. | Design of geostructural systems | |
ElMousalami et al. | Predicting conceptual cost for field canal improvement projects | |
Hammad et al. | Developing a novel framework to manage schedule contingency using theory of constraints and earned schedule method | |
Hegab et al. | Delay time analysis in microtunneling projects | |
Shahata et al. | Data acquisition and analysis for water main rehabilitation techniques | |
Macciotta et al. | Design acceptance criteria for operating open-pit slopes: an update | |
Kim et al. | Customer earned value: Performance indicator from flow and value generation view | |
Lee | Life cycle costing for exterior materials on building façade | |
Jordan Srour et al. | Automating the use of learning curve models in construction task duration estimates | |
Yoon et al. | Integrated framework for quantifying and applying nonworking days to planning and scheduling for determining reasonable construction time | |
Meydani et al. | Decision with uncertain information: an application for leakage detection in water pipelines | |
Ali et al. | Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems | |
Zayed et al. | Neurofuzzy-based productivity prediction model for horizontal directional drilling | |
Corneliussen et al. | Well Integrity Management System (WIMS)—A Systematic Way of Describing the Actual and Historic Integrity Status of Operational Wells | |
Uzielli | The role of data in the evolution of geotechnical design | |
Wickramasinghe et al. | Deterioration rates of building component groups using nominal replacement costs of components | |
Vanrenterghem-Raven | Risk factors of structural degradation of an urban water distribution system | |
Semaan et al. | Subway station diagnosis index condition assessment model | |
Talabi et al. | Integrated Asset Modeling: Modernizing the Perspective for Short-Term Forecasting and Production Enhancements |