Chouichi et al., 2018 - Google Patents
THE DETECTION AND THE CONTROL OF MACHINE/CHAMBER MISMATCHING IN SEMICONDUCTORMANUFACTURINGChouichi et al., 2018
- Document ID
- 6651909257338498828
- Author
- Chouichi A
- Blue J
- Yugma C
- Pasqualini F
- Publication year
- Publication venue
- 2018 Winter Simulation Conference (WSC)
External Links
Snippet
Achieving desired yields in advanced manufacturing industries, as is the case for semiconductor fabrication, requires perfectly matching the performance of parallel machines/chambers at all production steps. Moreover, in the high-mix/low-volume …
- 238000001514 detection method 0 title description 3
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0224—Process history based detection method, e.g. whereby history implies the availability of large amounts of data
- G05B23/024—Quantitative history assessment, e.g. mathematical relationships between available data; Functions therefor; Principal component analysis [PCA]; Partial least square [PLS]; Statistical classifiers, e.g. Bayesian networks, linear regression or correlation analysis; Neural networks
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
- G05B23/0243—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults model based detection method, e.g. first-principles knowledge model
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41875—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by quality surveillance of production
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32177—Computer assisted quality surveyance, caq
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/45—Nc applications
- G05B2219/45031—Manufacturing semiconductor wafers
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11295993B2 (en) | Maintenance scheduling for semiconductor manufacturing equipment | |
He et al. | Statistical process monitoring as a big data analytics tool for smart manufacturing | |
Kim et al. | Machine learning-based novelty detection for faulty wafer detection in semiconductor manufacturing | |
US11022642B2 (en) | Semiconductor yield prediction | |
Hazama et al. | Covariance-based locally weighted partial least squares for high-performance adaptive modeling | |
Zeng et al. | Virtual metrology modeling for plasma etch operations | |
TWI616736B (en) | System,method,and computer-readable medium for tool failure analysis using space-distorted similarity | |
US20110178967A1 (en) | Methods and apparatus for data analysis | |
KR20040088491A (en) | Manufacturing design and process analysis system | |
Chouichi et al. | Chamber-to-chamber discrepancy detection in semiconductor manufacturing | |
IL177293A (en) | Methods and apparatus for data analysis | |
Fan et al. | Key parameter identification and defective wafer detection of semiconductor manufacturing processes using image processing techniques | |
CN101118422A (en) | Method and system for virtual measurement estimation and estimation model establishment in semiconductor manufacturing | |
US20240184283A1 (en) | Time-Series Segmentation and Anomaly Detection | |
US7100081B1 (en) | Method and apparatus for fault classification based on residual vectors | |
Wang et al. | A novel Bayesian network-based fault prognostic method for semiconductor manufacturing process | |
CN115362457B (en) | Predicting Dies Susceptible to Premature Lifetime Failure | |
JP2011054804A (en) | Method and system for management of semiconductor manufacturing device | |
Chouichi et al. | THE DETECTION AND THE CONTROL OF MACHINE/CHAMBER MISMATCHING IN SEMICONDUCTORMANUFACTURING | |
Choi et al. | Multi-Stage Process Diagnosis Networks in Semiconductor Manufacturing | |
Chouichi et al. | Heterogranular multivariate analytics for detecting and controlling the root causes of the mismatching machines in semiconductor manufacturing | |
TWI832403B (en) | Methods, apparatus and non-transitory computer-readable medium for multidimensional dynamic part average testing | |
TWI647770B (en) | Yield rate determination method for wafer and method for multiple variable detection of wafer acceptance test | |
Sakamoto et al. | New method of screening out outlier; expanded part average testing during package level test | |
Zheng et al. | A Projective Weighted DTW Based Monitoring Approach for Multi-stage Processes with Unequal Durations |