Yang et al., 2024 - Google Patents
Risk-informed time margin analysis for operators in main control room of nuclear power plantYang et al., 2024
- Document ID
- 6540167105537780180
- Author
- Yang L
- Wen T
- Xu A
- Yang M
- Liu C
- Dong X
- Li L
- Publication year
- Publication venue
- IET Conference Proceedings CP886
External Links
Snippet
Nuclear reactor safety is crucial for the sustainable development of nuclear energy and the utilization of clean energy. This paper proposed a comprehensive framework for analyzing nuclear power plant accidents by integrating Risk-Informed Safety Margin Characterization …
- 238000004458 analytical method 0 title abstract description 39
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GASES [GHG] EMISSION, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
- Y02E30/40—Other aspects relating to nuclear fission
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/02—Devices or arrangements for monitoring coolant or moderator
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0218—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterised by the fault detection method dealing with either existing or incipient faults
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C3/00—Reactor fuel elements and their assemblies; Selection of substances for use as reactor fuel elements
- G21C3/02—Fuel elements
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/001—Computer implemented control
- G21D2003/002—Core design; Core simulations
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C19/00—Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2002/00—PROBLEM
- G21Y2002/502—Lack of monitoring
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21D—NUCLEAR POWER PLANT
- G21D3/00—Control of nuclear power plant
- G21D3/04—Safety arrangements
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21Y—INDEXING SCHEME RELATING TO NUCLEAR REACTORS, POWER PLANTS AND EXPLOSIVES, TO PROTECTION AGAINST RADIATION, TO THE TREATMENT OF RADIOACTIVELY CONTAMINATED MATERIAL, TO APPLICATIONS OF RADIOACTIVE SOURCES AND TO THE UTILISATION OF COSMIC RADIATION
- G21Y2004/00—SOLUTION
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9208911B2 (en) | Full spectrum LOCA evaluation model and analysis methodology | |
| Sherry et al. | Pilot application of risk informed safety margin characterization to a total loss of feedwater event | |
| Mandelli et al. | BWR station blackout: A RISMC analysis using RAVEN and RELAP5-3D | |
| Ma et al. | Plant-level scenario-based risk analysis for enhanced resilient PWR–SBO and LBLOCA | |
| Zhang et al. | Application of the BEPU safety analysis method to quantify margins in nuclear power plants | |
| Cho et al. | Realistic estimation of human error probability through Monte Carlo thermal-hydraulic simulation | |
| Pourgol-Mohamad et al. | Integrated methodology for thermal-hydraulic code uncertainty analysis with application | |
| Burgazzi | Reliability of passive systems in nuclear power plants | |
| Aldemir | Advanced concepts in nuclear energy risk assessment and management | |
| Szilard et al. | Industry application emergency core cooling system cladding acceptance criteria early demonstration | |
| Mandelli et al. | Overview of new tools to perform safety analysis: BWR station black out test case | |
| EP2643781B1 (en) | Full spectrum loca evaluation model and analysis methodology | |
| Ahn et al. | Uncertainty and Sensitivity Analyses for Postulated Severe Accidents of Reference PWRs and SMRs in the Frame of the IAEA CRP and Relevant Insights | |
| Yang et al. | Risk-informed time margin analysis for operators in main control room of nuclear power plant | |
| Zhang et al. | A Strategic Approach to Employ Risk-Informed Methods to Enable Margin Recovery of Nuclear Power Plants Operating Margins | |
| Park et al. | Simulator data analysis to inform digitalized environment impacts on human reliability | |
| Chiu et al. | A Risk Approach to the Management for the Pre-Defueled Phase in the Decommissioning Transition Stage | |
| Wallace et al. | Control rod monitoring of advanced gas-cooled reactors | |
| Akter et al. | A fuzzy based model for safety assessment of AP-1000 and VVER-1200 nuclear reactors for cold leg break loss of coolant accident with turbine trip | |
| Jankovsky et al. | Interim status report for risk management for SFRs | |
| AKMALI et al. | Evolving PSA Methodologies: Towards Dynamic Reliability in SMR Passive Systems | |
| Pantyushin et al. | Experience gained in analyzing severe accidents for WWER RP using CC SOCRAT | |
| Sande et al. | The Benefits of Using a Risk-Informed Approach to Resolving GSI-191 | |
| Cunning et al. | An Examination of CANDU Fuel Performance Margins Derived from a Statistical Assessment of Industrial Manufacturing Data | |
| Eriksson | Monte Carlo analysis of BWR transients: A study on the Best Estimate Plus Uncertainty methodology within safety analyses at Forsmark 3 |