Gilbert et al., 1991 - Google Patents
A heuristic for a class of production planning and scheduling problemsGilbert et al., 1991
- Document ID
- 5779713786144688655
- Author
- Gilbert K
- Madan M
- Publication year
- Publication venue
- IIE TRANSACTIONS
External Links
Snippet
This paper describes a solution technique for a general class of problems referred to as aggregate planning and master scheduling problems. The technique is also applicable to multi-item single level capacitated lot sizing problems. The solution technique presented …
- 238000004519 manufacturing process 0 title description 27
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/30—Transportation; Communications
- G06Q50/32—Post and telecommunications
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Spence et al. | Setup reduction and increased effective capacity | |
Shah et al. | A general algorithm for short-term scheduling of batch operations—II. Computational issues | |
Huh et al. | An adaptive algorithm for finding the optimal base-stock policy in lost sales inventory systems with censored demand | |
Cao et al. | Capacitated plant selection in a decentralized manufacturing environment: a bilevel optimization approach | |
US20020107599A1 (en) | Method and system for dispatching semiconductor lots to manufacturing equipment for fabrication | |
US20110098834A1 (en) | Planning method and system for optimizing stock and production plan in batch process industry | |
Halman et al. | Approximating the nonlinear newsvendor and single-item stochastic lot-sizing problems when data is given by an oracle | |
Harks et al. | An integrated approach to tactical transportation planning in logistics networks | |
Gilbert et al. | A heuristic for a class of production planning and scheduling problems | |
JP2009223359A (en) | System, program and method for calculating equipment load factor | |
Tonke et al. | Maintenance, shutdown and production scheduling in semiconductor robotic cells | |
Occhino | Capacity planning model: the important inputs, formulas, and benefits | |
Mouzon | Operational methods and models for minimization of energy consumption in a manufacturing environment | |
Lee et al. | MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE. | |
CN113344641B (en) | Method for allocating transaction cost of running standby auxiliary service market | |
Squillante et al. | Generalized parallel-server fork-join queues with dynamic task scheduling | |
Kelle et al. | Economic lot scheduling heuristic for random demands | |
Steinsultz et al. | Validating locational marginal emissions models with wind generation | |
Hadad et al. | A revised method for allocating the optimum number of similar machines to operators | |
Johnson et al. | Operational efficiency | |
Wu et al. | Dual-index policies for serial systems with dual delivery modes and batch orders | |
US20070016318A1 (en) | Systems and methods for determining production availability | |
Lee et al. | Multi-objective production scheduling of probe process in semiconductor manufacturing | |
Xu et al. | Short‐term scheduling with machine calibration | |
Wu et al. | Modeling and Analysis of Pull Production Systems: A Proactive Approach |