Sauser et al., 2010 - Google Patents
Integration maturity metrics: Development of an integration readiness levelSauser et al., 2010
View PDF- Document ID
- 5096987835647397015
- Author
- Sauser B
- Gove R
- Forbes E
- Ramirez-Marquez J
- Publication year
- Publication venue
- Information Knowledge Systems Management
External Links
Snippet
In order to optimize the process of complex system integration, it is necessary to first improve the management of the process. This can be accomplished through the use of a generally understood metric. One such metric is Technology Readiness Level (TRL), which is used to …
- 230000018109 developmental process 0 title description 71
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/36—Preventing errors by testing or debugging software
- G06F11/3668—Software testing
- G06F11/3672—Test management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
- G06F17/5018—Computer-aided design using simulation using finite difference methods or finite element methods
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/20—Handling natural language data
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/10—Requirements analysis; Specification techniques
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Error detection; Error correction; Monitoring responding to the occurence of a fault, e.g. fault tolerance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sauser et al. | Integration maturity metrics: Development of an integration readiness level | |
Sauser et al. | A system maturity index for the systems engineering life cycle | |
Eickhoff | Simulating spacecraft systems | |
Sauser et al. | 3.1. 1 Defining an Integration Readiness Level for Defense Acquisition | |
Bayer | Is MBSE helping? Measuring value on Europa Clipper | |
Younse et al. | Comparative analysis of a model‐based systems engineering approach to a traditional systems engineering approach for architecting a robotic space system through knowledge categorization | |
Garro et al. | Reliability analysis of an attitude determination and control system (ADCS) through the RAMSAS method | |
Boydston et al. | Architecture centric virtual integration process (ACVIP): A key component of the DoD digital engineering strategy | |
Henderson et al. | Toward airworthiness certification for artificial intelligence (AI) in aerospace systems | |
Grumbach et al. | Integration principles for complex systems | |
Dennehy et al. | Verification and validation (v&v) of guidance & control systems: Results from the first inter-agency workshop on gnc v&v | |
Xavier Jr et al. | AEB online calculator for assessing technology maturity: IMATEC | |
Strzepek et al. | A Training, Operations and Maintenance Simulator (TOMS) made to serve the MERLIN Mission | |
Shiotani et al. | An end-to-end design and development life-cycle for cubesat class satellites | |
Clark et al. | Autonomy community of interest (coi) test and evaluation, verification and validation (tevv) working group: Technology investment strategy 2015-2018 | |
Miller | Bridging the gap between model-based development and model checking | |
Burger et al. | Space Launch System Liftoff and Separation Dynamics Analysis Tool Chain | |
Chaudemar et al. | Mission‐based design of UAVs | |
Thomas et al. | Towards enhanced process and tools for aircraft systems assessments during very early design phase | |
Dezfuli et al. | NASA system safety handbook. Volume 2: System safety concepts, guidelines, and implementation examples | |
Boydston et al. | Joint common architecture (JCA) demonstration architecture centric virtual integration process (ACVIP) shadow effort | |
Stehura et al. | Managing complexity: Solutions from the mars science laboratory entry, descent, and landing flight system verification and validation campaign | |
Gundy-Burlet | MBSE Validation and Verification: Case Study for LADEE | |
Grumbach et al. | Quantitative validation of complex systems integration principles | |
Tosney et al. | Space safety is no accident how the aerospace corporation promotes space safety |