Coughlin, 1984 - Google Patents
Optimization of spares in a maintenance scenarioCoughlin, 1984
- Document ID
- 4028022118809015476
- Author
- Coughlin R
- Publication year
- Publication venue
- Annual Reliability and Maintainability Symposium, 1984. Proceedings.
External Links
Snippet
This paper deals with a method for optimizing the allocation of spare parts used in the maintenance of a hardware system. Spares allocation can be optimized in either of two ways:(1) maximization of system operational availability for a certain maximum spares cost; …
- 238000005457 optimization 0 title description 13
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement, balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/07—Error detection; Error correction; Monitoring responding to the occurence of a fault, e.g. fault tolerance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F1/00—Details of data-processing equipment not covered by groups G06F3/00 - G06F13/00, e.g. cooling, packaging or power supply specially adapted for computer application
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F7/00—Methods or arrangements for processing data by operating upon the order or content of the data handled
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2201/00—Indexing scheme relating to error detection, to error correction, and to monitoring
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Sherbrooke | An evaluator for the number of operationally ready aircraft in a multilevel supply system | |
| Armstrong et al. | Joint optimization of maintenance and inventory policies for a simple system | |
| Hillestad | Dyna-METRIC: Dynamic Multi-Echelon Technique for Recoverable Item Control. | |
| Davenport et al. | A survey of techniques for scheduling with uncertainty | |
| Gross | On the ample service assumption of Palm's theorem in inventory modeling | |
| Coughlin | Optimization of spares in a maintenance scenario | |
| Pyles | The Dyna-METRIC readiness assessment model: Motivation, capabilities, and use | |
| Brown Jr et al. | A Bayesian approach to demand estimation and inventory provisioning | |
| Crawford | Palm's theorem for nonstationary processes | |
| Isaacson et al. | Dyna-METRIC Version 5: a capability assessment model including constrained repair and management adaptations | |
| ROSENBLATT et al. | The effects of work-in-process inventory costs on the design and scheduling of assembly lines with low throughput and high component costs | |
| US7415388B2 (en) | Method for the automatically determining the indirect and direct extent of damages resulting from a failure of technical components in objects integrated in a production cycle | |
| WERBIŃSKA | The availability model of logistic support system with time redundancy | |
| Tayur | Recent developments in single product, discrete-time, capacitated production-inventory systems | |
| US20060064490A1 (en) | System and method for selecting a portfolio of resources in a heterogeneous data center | |
| Blitz et al. | Optimum allocation of a spares budget | |
| Lifsey | Optimization of maintenance resources | |
| Clark Jr et al. | Complex multiechelon inventory system management using a dynamic simulation model | |
| Price | Achieving a system operational availability requirement model | |
| Buratti et al. | Sneak analysis application guidelines | |
| Werbińska | Problems of designing a logistic support system with time dependency. | |
| Hoover et al. | A model to study: Cannibalization, FMC, and customer waiting time | |
| Price | Achieving a system operational availability requirement (ASOAR) model | |
| Tyson et al. | Weapon reliability and logistic support costs in a combat environment | |
| Xiao et al. | Research on the Prediction Method of the Mean Logistic Delay Time of Materiel |