scoru: fix production proof of rollup node
Context
The refutation proof produced by the rollup node use the inbox of the current level. This MR changes that to use the snapshotted inbox (inbox at the level of the creation of the game).
fix #3744 (closed)
Manually testing the MR
run two nodes (looser vs honest).
Checklist
-
Document the interface of any function added or modified (see the coding guidelines) -
Document any change to the user interface, including configuration parameters (see node configuration) -
Provide automatic testing (see the testing guide). -
For new features and bug fixes, add an item in the appropriate changelog ( docs/protocols/alpha.rstfor the protocol and the environment,CHANGES.rstat the root of the repository for everything else). -
Select suitable reviewers using the Reviewersfield below. -
Select as Assigneethe next person who should take action on that MR
Edited by Sylvain R.